CSC status report Muon IB meeting at CERN Feb. 28, 2012

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Since last meeting, no collisions LHC has been working towards increasing the intensity in single bunches towards achieving the 2011 integrated luminosity.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
USCMS Physics, May 2001Darin Acosta1 Status Report of PRS/  D.Acosta University of Florida Current U.S. activities PRS/  Activities New PRS organization.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
P06 – Muons Alexei Safonov, L2 Manager, September 17, Director's Progress Review --Muon Overview A. Safonov, 2015 September 17.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
P. Paolucci G. Pugliese M.Tytgat
University of Wisconsin
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
SLHC Muon Upgrades and Impact on Trigger
The Ohio State University
Timing/Synchronization Status
CSC EMU Muon Port Card (MPC)
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
Muon Track-Finder Trigger
Colliding Beams Group Involvement In CMS (see also M
CMS EMU TRIGGER ELECTRONICS
Not baseline: ASIC, DCFEB R&D if L1A latency > 10 ms
CSC Organization in 2013 Jay Hauser To be updated at
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
The Ohio State University
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
University of California Los Angeles
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
DQM for the RPC subdetector
Pierluigi Paolucci & Giovanni Polese
Plans for the 2004 CSC Beam Test
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
19-April-05 CSC ME1/1 Meeting
CSC Shift Training and Operation + B904 Status
Presentation transcript:

CSC status report Muon IB meeting at CERN Feb. 28, 2012 6/20/2018 CSC status report Muon IB meeting at CERN Feb. 28, 2012 Jay Hauser Current status for: CSC Operations CSC Detector Performance (DPG) CSC Upgrades Outlook for 2012 run CSC organization for 2012

Status of CSC Operations CSC detector ran well in 2011 Dead chambers /electronics almost stable Downtime decreased, workload on DOCs etc. decreased L1 muon trigger configuration fairly stable, but muon HLT not Readout problems – firmware improvements… Eff. loss correlates with readout rate > 60kHz (see next slide) New firmware are being tested at Point 5 (error event dumps) Other developments during Technical Stop: SLC5 migration, DCS revamp, and Emu online library update have gone well – numerous improvements under the hood Zero-suppressed ALCT firmware downloaded Problems on ~4 chambers seen… CSCs running+triggering in all MWGRs

CSC Efficiency vs L1 Rate V. Palichik -0.7% LCT LCT efficiency is stable with trigger rate -3.6% -6.3% Segments Degradation of segment efficiency with L1 rate (up to 12% for L1 rate > 90 kHz comparing with LCT) -12 % Average for Stations 1-2-3 2012 2011B 2011A Higher L1 Rates are expected in 2012 at the planned luminosity of (5-7) e33

First CSC data of 2012 looks good Triggering and readout in all MWGRs Occupancy (RecHits) in Feb. 15, 2012 cosmic ray run:

Status of CSC Detector Performance – DPG CSC spatial and timing performance is robust Unaffected by high luminosity, high pile-up, or 25 vs 50 ns running No known problems expected at 7E33 luminosity! Have prepared for: Zero-suppressed ALCT readout (saves 15-20% of total CSC data) Run- and position-dependent dE/dX corrections DQM improvements More robust capture of efficiency losses, readout sync errors added Plans for much better monitoring ahead!

Status of CSC Upgrades ME4/2 upgrade ME1/1 upgrade CSC factory in operation – three prototypes done Panel procurement starting to roll (from vendor Fermilab B904) New “Point 5 compatible” test stand is ready 1 or 2 endcaps in ‘13-’14? ME1/1 upgrade DCFEB pre-production boards in layout – schedule probably delayed somewhat due to high-rate readout problems

Outlook for 2012 Run SEU mitigation: CSC trigger: will on-demand and/or periodic hard resets improve our up-time? CSC trigger: CSC Track Finder: single muon rate -3 kHz expected Expect more stability in 2012, since “only” factor 2 luminosity improvement forseen High rate sync loss problems – firmware improvements… Hope(!) it is solved before collisions (~1 month) Upgrades – schedule is challenging: ME4/2: factory rolling in ~2 months? Depends on panels etc. ME1/1: DCFEBs going into preproduction “soon” Expect a lot of reviews… starting with ~end-March ME1/1 review chaired by Magnus

CSC manpower “concerns” CSC Operations - okay for 2012 CSC DPG group - very thin overall, and we have no-one dedicated to: prompt feedback on performance reconstruction software simulation software CSC upgrades – still lacking an ME4/2 electronics czar

CSC organization Organization for 2012: 6/20/2018 CSC organization Organization for 2012: Main changes were presented at last November Emu meeting NB Padley will be stepping down from US-CMS “Level 2” manager position soon (discuss) Further refinement (see following slide and more details in backup slides): Add Tim Cox as “informal” deputy PM (discuss). Tim has been attending XEB meetings for CSC while JH teaching at UCLA Formally, role of Padley, Golutvin, Chunhua is as country reps within Resource Board led by CSC Resource Manager now Dick Loveless (discuss)

CSC Organization 2012 Most recent update 26-Feb-2012 CMS Spokesperson 6/20/2018 CSC Organization 2012 Most recent update 26-Feb-2012 CMS Spokesperson Muon Institution Board Resource Manager Dick Loveless Country reps. Paul Padley, Igor Golutvin, Chunhua Jiang CSC Project Manager Jay Hauser Deputy Tim Cox CSC Operations Misha Ignatenko Deputy Evaldas Juska CSC DPG (Detector Perf.) Tim Cox Deputy Vladimir Paltchik CSC Upgrades Dick Loveless Hardware Offline software Offline software ME4/2 procurement ME4/2 procurement Online software Detector data analysis ME4/2 factory Pt. 5 operations Data validation ME1/1 repair Pt. 5 integ./install.

Backup slides

CSC Operations Misha Ignatenko Deputy Evaldas Juska Hardware TBD 6/20/2018 CSC Operations Misha Ignatenko Deputy Evaldas Juska Hardware TBD Online software Bob Clare Frank Geurts Point 5 operations Misha Ignatenko Safety coordinator Armando Lanaro Field coordinator Armando Lanaro Manage software releases, Run Control Jinghua Liu DOC training Misha Ignatenko Chamber/electronics maintenance Misha Ignatenko DCS software Evaldas Juska, Jinghua Liu, X. Yang Configuration and L1 Trigger Misha Ignatenko, Greg Rakness Electronics Stan Durkin Computers and Local DAQ Karoly Banicz Software emergency response Jinghua Liu, Karoly Banicz LV, electrical systems Petr Levchenko Databases Igor Vorobiev DQM shifter training Sasha Sakharov Mechanical systems Dick Loveless FED software Carl Vuosalo Shifter scheduling Tom Ferguson HV Alex Madorsky Local DQM Victor Barashko, Andrey Korytov Gas system Valeri Andreev Test bed (B904) software Karoly Banicz Alignment Xiaofeng Yang Expert system Evaldas Juska, Jinghua Liu, Karoly Banicz Test bed (B904) system Petr Levchenko

CSC DPG Tim Cox Deputy Vladimir Paltchik Muon DPG (combined) Offline 6/20/2018 CSC DPG Tim Cox Deputy Vladimir Paltchik Muon DPG (combined) Muon alignment Gervasio Gomez, Yuri Pakhotin Offline Tim Cox Detector data analysis (TBD) Data validation Sasha Sakharov Unpacker and Digis R. Harr, S. Sakharov (VB, TC, RW, VR) Prompt feedback (C. Boulahouache, Jinzhong Zhang) Data certification (signoff) Sakharov Rechit recon. (vacant) Efficiencies C. Boulahouache, V. Palichik, J. Zhang CSC-internal data validation DQM shifters Segment recon. (vacant) Resolutions Vladimir Palichik Release validation John Babb Simulation, LCTs and packing (almost vacant- Tim Cox) Timing Amanda Deisher, Chris Farrell Heavy ions Guillermo Breto Oracle, offline conditions DBs Igor Vorobiev, Darin Baumgartel Pile-up and backgrounds Misha Ignatenko DQM infrastructure Victor Barashko, Andrey Korytov Cathode calibration Darin Baumgartel, Victor Barashko Geometry Richard Breedon, Tim Cox Anode calibration Alex Madorsky CSC Validation package Matt Chasco Track-based alignment Aysen Tatarinov, Yuri Pakhotin Event display Jinzhong Zhang Hardware alignment Jim Bellinger

Pt. 5 Integr., Installation 6/20/2018 CSC Upgrades Dick Loveless ME4/2 procure. Dick Loveless ME4/2 factory Armando Lanaro ME1/1 electronics Darien Wood Pt. 5 Integr., Installation Panels and skins Oleg Prokofiev Floor manager and safety Sandro Di Vincenzo Engineering coordination Mike Matveev ME4/2 Loveless, Lanaro Misc. chamber parts Dick Loveless Project engineer Boris Bochin DCFEB Ben Bylsma ME1/1 Vladimir Karjavin LV electronics Receiving and shipping Andrey Vorobiev, L. Shipunov DMB Guido Maguzza ALCT electronics Jay Hauser TMB hardware Jason Gilmore Chamber production Boris Bochin AFEB boards Tom Ferguson TMB firmware Jay Hauser QC/QA and data logging Xiaofeng Yang Electrical Cables Paul Karchin LVDB electronics Vladimir Karjavine FAST site testing V. Sulimov, Petr Levtchenko Optical links Durkin Radiation testing Darien Wood FAST site development David Saltzberg