Construction site plan

Slides:



Advertisements
Similar presentations
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Advertisements

Facilities Management Post Hurricane Building Assessment and Recovery June 28, 2007.
Environmental Testing at Immaculate Heart of Mary (IHM) Week of April 21, 2014 Presented by Ohio EPA and Summit County Public Health.
10/5/ Living Snowfence Workshop - Spokane, WA 1 Giving Birth to Living Snow Fences Richard Straight – USDA National Agroforestry Center a partnership.
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Checkpoint Set-Up and Operation. Vehicle Checkpoints ●Identify vehicles with infected or susceptible animals ●Restrict entry into disease areas ●Redirect.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Urban, Suburban & Rural. Urban People often define urban areas, or cities, as land occupied by buildings and other structures used for residences and.
Elements of Artwork What moves in these paintings?
Project Update August 2008 Richard Rife Deputy Project Manager.
Compliance Why doing it right is important
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
BUILD READY PROGRAM. Benefits of Build Ready Drastically Reduce Construction Time Companies can build sooner on Build Ready sites Reduces the amount of.
EMERGENCY FACILITIES AND EQUIPMENT. Facility: Any equipment, structure, system, process, or activity that fulfills a specific purpose Site: The area over.
HEATH ROAD ALLOTMENTS. Allotments Allotments are a Statutory provision and contribute to delivering key priorities of the Councils Corporate Plan 2011/2016.
SITE/PLOT PLANS APPLICATIONS OF TECHNOLOGY. DESIGNING A BUILDING ON A SITE Architects must consider the following about a site when designing a building.
Storage Industrial zone Dobanovci Beogradska BB.
VIA / TCU 4th semester workshop S2016 WBS – Work Breakdown Structure VIA University CollegeTCU-VIA Workshop – S20161 A method to make bigger projects smaller.
Brownfields 101 Environmental Engineering Considerations Presented By: Ileen Gladstone, P.E., LSP, LEED.
WELCOME  WELCOME  ROTHER and WEALDEN ENVIRONMENTAL HEALTH  HEALTH AND SAFETY  23 SEPTEMBER 2015.
VIA / TCU 4th semester workshop S2016 Intro BPM VIA University CollegeTCU-VIA Workshop – S2016 JMOG1 Agenda What is BPM? The wedding party – The processes.
VIA / TCU 4th semester workshop S2016 Soil work and machines VIA University CollegeTCU-VIA Workshop – S20161 Factors to remember in the working process.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
Contract and Tender form Phases of Designing Phases of Implementation VIA / TCU 4th semester workshop S2016 Contract and Tender form S2016 VIA University.
INFORMATION ABOUT: EUROPEAN FIRE CLASSIFICATION..
What happens when technology changes?
Welcome to Earthquake Engineering
Cambrian School District Project Update June 4, 2015 Board of Trustees Meeting Jason Vann, CFO Will Robertson, Kramer Project Development Co.
Mass gatherings maybe defined as:
Civil Engineering Construction Technology and Organization
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
Decisions and considerations of choosing or building a new home.
Our Featured Property 317 S. San Francisco St. Apply Today!
EHS Facility Best Practices
INFORMATION ABOUT: EUROPEAN FIRE CLASSIFICATION.
Shed exercise VIA / TCU 4th semester workshop S2016
Personal planning and portfolio
Registration assignment
Introduction Handbook for contractors
Time schedule for implementation as main contractor
Recap Recap construction site plan
Recap Recap construction site plan
Intro BPM VIA / TCU 4th semester workshop S2017 Agenda What is BPM?
Why do we use the WBS method Common assignment – Eat project Examples
Soil Mechanics Assignments
Recap Recap construction site plan
Final exam VIA / TCU 5th semester workshop VIA University College
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Welcome to the 5th semester
Construction site plan
KNIGHTON & CHURN CREEK COMMONS RETAIL CENTER
Contract and tender form Phases of designing Phases of implementation
Product Mix, Equipment, Design
Introduction Handbook for contractors
Final exam 3rd semester A2018
Budgeting at the State Level
Geographic Conditions and Connections
Health and safety VIA / TCU 5th semester workshop
Welcome to the 4th semester Intro to S2017
Welcome to the 5th semester
Health and safety VIA / TCU 5th semester workshop
Shed exercise VIA / TCU 4th semester workshop VIA University College
Health and safety VIA / TCU 5th semester workshop
Wbs, CONTRACTORS & GIVING A BID
Construction site plan
CASE 2 : Two-storey building
Renting equipment VIA / TCU 4th semester workshop Agenda The 4 Ms
Starting a campground.
Machinery and equipment continued
Presentation transcript:

Construction site plan VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 1

Construction site plan VIA / TCU 5th semester workshop What is a construction site plan? Purpose of a plan? Who will use this plan? Why will they use the construction site plan? When do we use the construction site plan? Who will keep the plan(s) updated? VIA University College TCU-VIA Workshop 2

Construction site plan VIA / TCU 5th semester workshop What do you think should be on the construction site plan for our project? 1 – Site managers wagon 2 - Kanteen 3 – Bathroom/toilet 4 - Water 5 -Storeroom 6 - Sewer 7 – Power – how many Amp? 8 – Fire/first aid control center 9 - Dormetry 10 - VIA University College TCU-VIA Workshop 3

Starting up the construction site plan VIA / TCU 5th semester workshop Know the area where to build. Visit the place. Go there. Drive there… When visiting the site, investigate: Different heights at the ground (can the machines drive there?) Waterholes (do we need to empty it first?) Trees, bushes on the site? Old houses on the site? Ancient monuments? Rare animal spices? Soil density, contamination, former use of the ground? How to secure the area from public (safety/theft/secret)? Others things? Basic for the construction site plan Access to water Infra structure, roads and entrance Space to work and deliver materials Water, electricity and sewers Maybe neighbors if the building is close to them VIA University College TCU-VIA Workshop 4

New shopping center in Aarhus, Denmark VIA / TCU 5th semester workshop What do you think this construction site plan needs? 1 – Soil depotize 2 – Space for materials 3 – Kanteen 4 – Toilet/bathroom 5 – Sewer 6 – Water 7 – Powerline and Amp? 8 – Internal roads 9 – Fence and entrance 10 – First aid VIA University College TCU-VIA Workshop 5

Example VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 6

Example VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 7

Example VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 8

Example VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 9

Example VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 10

Example VIA / TCU 5th semester workshop Spektrum Odder 2006 VIA University College TCU-VIA Workshop 11

Example VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 12

Continuing the construction site plan VIA / TCU 5th semester workshop What kind of information should be in the construction site plan? The level of informations? High/low/many/few? The minimum demands for the plan? Who will be useing the construction site plan: The building owner The contractor The different trades The neighbors The fire department The authorities Others….who Or a mix from above? VIA University College TCU-VIA Workshop 13

And more important information VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 14

Assignment VIA / TCU 5th semester workshop Make a sketch for the site planning for the site on paper A4, so it fits the health and safety plan made earlier. The site plan should fit the contractors needs of information, also safety The construction site plans are to be disgusts with all groups in the class VIA University College TCU-VIA Workshop 15

What to do and how to do it VIA / TCU 5th semester workshop Health and safety plan A3 size A3 size Construction site plan here VIA University College TCU-VIA Workshop 16