TurnKey® Delivery Training

Slides:



Advertisements
Similar presentations
Chapter 32 The Dental Office
Advertisements

Welcome package (customization) FLL July IT requirements -Hardware recommendations -Contact information -Clinical / technical contact -Office addresses.
Zebra® 105SL™ * Removing and Installing Printhead
Cisco 6500 E-Series Chassis Up-grade
A-dec 300 on 511 Product Training – August Agenda ► Project Scope ► What is N53? ► Benefits/Target Customer ► Product Positioning ► Features & Value.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Container Stuffing and Stripping
1 Strictly confidential | Engineering| © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of.
Basic fill color R 100 G 160 B 200 Accent 1 ”Logo Blue” R 0 G 39 B 118 Yellow (highlight) R 252 G 217 B 0 Accent 2 R 118 G 118 B 118 OP300 Technical training.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
ESD Constant Monitor System Packaging Bench set-up.
1 System Upgrades. This module reviews DIRECTV system upgrade instructions System Upgrades.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
Financials 9.1 Upgrade Progress Update Financial Unit Liaison Meeting May 18, 2011.
Beltone News Network (BNN) – Powered by HNN WHY? Provide office content that educates our target audience and promotes Beltone Network as the right choice.
1CUL.PPT Last Revised: 10 June 2005 The Role of the Communications Unit Leader Developed as part of the National Emergency Services Curriculum Project.
SAFETY SHOWERS ABDULLAH AYDOGAN 4/30/2013
Power/Hand Tools Valley City State University | Facilities Services | OSHA Office of Training & Education.
ATT EVALUATION EQUIPMENT
Copyright © 2006 Thomson Delmar Learning. ALL RIGHTS RESERVED. 1 PowerPoint ® Presentation for Introduction to Dental Assisting Module: The Dental Profession:
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
1CUL.PPT Last Revised: 10 June 2003 The Role of the Communications Unit Leader Developed as part of the National Emergency Services Curriculum Project.
9 Agenda Views Pages Web Parts Navigation Office Wrap-Up.
VARCO PRUDEN’S Self Curbing Day Lighting Solution PrisMAX SL for SSR & HWR Roof’s.
Presented by : Wang Yu Shun. Agenda  Introduction  Introduction of Vytec Corporation  The Manufacturing Process  The Finished Good Warehouse  Planning.
Barcodes and MDS Easy ways to speed up and increase accuracy using barcodes in MDS Monday June 14, 2010.
1January 2012 Monthly Theme - Fitness January 2012 – Monthly Theme – Snow Throwers Note to LCM: This deck has three segments intended to be shared with.
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
© 2007 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice HP CM8060/8050 Color MFP with Edgeline.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Managing data by using tables
1 MOMENTUM 3800 RC ASSEMBLY INSTRUCTIONS PART NUMBER
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
Information Systems Technology Ross Malaga A Copyright © 2005 Prentice Hall, Inc. A-1 INSIDE YOUR COMPUTER.
Visual Identity Corporate Materials and Website.
Quick Set-up of IBM Control Desk – Development Instance ( Quick Start) Delivery & Steps.
Jump Start The PATSolution for getting your PAT system up and running quickly.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
UH-60 Load Out on C-5 Aircraft
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Rotary Global Grant Medical Supplies and Equipment for a Village Primary Health Care Center in South Sudan.
© 2008 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. BladeUPS Preassembled.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
Melfast is a distributor of fasteners and hardware who offers a wide range of hardware items and materials including fasteners,
Do you Have a Problem For- For-. Techiezoncall.com Techiezoncall.com Offers Online Technical Support To Global Customers, Just
Microsoft Office Setup Tech Support. Call for Activate & Install Office.
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
General Laboratory & Practical Work Safety Guidelines
PROCEDURE OF AVG ANTIVIRUS INSTALLATION.
PowerPoint® Presentation for Introduction to Dental Assisting
Welcome To Mellcrest Ltd
+PLUS WAREHOUSE CONTROL SYSTEM (WCS)
Performance May Head of Performance Band 8c PA 0.5 Band 4
Yasham Software Services Pvt Limited Dec-2016
ESD Procedures for the Electronics Industry
SMART HR Open Forum.
Section 4 | Bishopsgate Case Study: Nuffield Health
Standard Business Processes
Distribution and Transportation
Presentation transcript:

TurnKey® Delivery Training Owners Deliver © TurnKey® Delivery Training This training is designed for to familiarize CGL personnel with procedures for delivery and setup of models 151 & 152 exam light. CGL Training Dep. JUNE 2011 CGL corp. ALL RIGHTS RESERVED www.cglship.com

Table of contents: Owners Deliver © Summary Requirements Step 1: Lower carton to ground Step 2: Remove packaging materials Step 3: Remove bolts Step 4: Place table on dolly Step 5: Position table in custom-designed area Locate carton with hardware Step 6: Connect electrical cords Step 7: Install magnetic base cover Step 8: Mount had control Locate carton with cushions Step 9: Install head cushions Step 10: Install back/seat cushion & foot cushion Step 11: Remove dunnage/packaging Review training/ Report Completion

Summary Owners Deliver © Midmark Corporation ships medical exam tables, chairs and accessories that are delivered to health clinics and doctors’ offices. This training will demonstrate the delivery and setup of the Model 151 & 152 Exam light.

Owners Deliver © REQUIREMENTS Inside Delivery Unpack the exam light Install in customer-designed location Ground delivery (if required)

STEP 1 Lower the carton to ground using a liftgate or ground-delivery attachment. In many cases, the customer will have a dock

Remove packaging materials STEP 2 Remove packaging materials Cut and remove the bands Remove carton top

Remove all dunnage, packaging items and pallet.

If you have any questions, contact your supervisor. Owners Deliver © This concludes the Midmark Corporation Delivery Training Module for the delivery and setup of the Model 151 & 152 Exam light. If you have any questions, contact your supervisor. CGL Training Dep. JUNE 2011 CGL corp. ALL RIGHTS RESERVED www.cglship.com