NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review

Slides:



Advertisements
Similar presentations
SCHOOL DISTRICT PALM BEACH COUNTY District Design Criteria DDC.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Delivering Successful Facility Projects It Starts and Ends with You!
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
State of Utah Division of Facilities Construction and Management DFCM -- Our Mission To provide professional services to assist State entities in meeting.
1 NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS Presentation to Approved A/E Vendors to NYP June 17, 2013.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
CODE REVIEW: DOH Article 28 Compliance Establishing a Feasibility process that is focused on compliance with New York State Department of Health rules.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
NYP BEST PRACTICES Certificate of Need Process Angela Gonzalez-Perez
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Capabilities Presentation Please select the button above that best describes your interest to learn more about how Formare Technica, Ltd. can help you.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Building Commissioning
Construction Engineering 221 Drawings and Specifications.
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Construction Contract Documents
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Construction Specifications
1 NYP BEST PRACTICES CODE REVIEW: LIFE SAFETY Larry Borsinger, MBA Director, Facilities Operations - Regulatory Compliance Sukhjit Tom Singh, MHA, MPH.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
School Construction Plan Review What you need to know.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Tom MAZOUR IAEA, Division of Nuclear Power
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Specification & Quantities Estimating
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Once the designer has decided to use and selected the correct Magna 3 pump in a specific application they must communicate these decisions to the contractor.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
DSA Fire and Life Safety SDFPA, February 2009 Craig Rush DSA Regional Manager.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
1 MEP Design Standards & Equip Cuts Presentation for Architect/Engineer Retreat 2016.
Certificate of Need Process NYP Best Practices for Architects & Engineers May 2, 2016 Angela Gonzalez-Perez Director, Regulatory Planning.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
Designer selection procedures. Legal framework Article 3D. Procurement of Architectural, Engineering, Surveying Services, and Construction Manager at.
Dana K “Deke” Smith FAIA Birgitta Foster Executive Director Assisting Director buildingSMART alliance 1.
MEP Design Standards & Equip Cuts
NYP BEST PRACTICES CODE REVIEW: LIFE SAFETY Larry Borsinger, MBA
CODE REVIEW: DOH Article 28 Compliance
Installation Procurement Package
NYP BEST PRACTICES Certificate of Need Process Angela Gonzalez-Perez
Session Name/Lecture Name
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Joint Schools Construction Board Phase II
Operations Update 15 November 2012
Document Handover Training Session
Punch list / Close Out - Project Completion
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Consultant Selection Training
NERC Cyber Security Standards Pre-Ballot Review
Georgetown county water and sewer district
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS
Centralization of Texas State Contract Compliance Functions
Construction and Facilities Program October 12, 2012
Presentation transcript:

NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review Presentation for A/E Retreat 2013

Agenda Consultant Engineer & Commissioning Agent Disclaimer NYP Design Standards - 2012 Edition Equipment Selection Process Locating the Design Standards on the Portal Navigating within the Design Standards & Equipment Cuts NYP Load Letter and NYSERDA Grant Information Drawing Review Process Updating and Maintaining

Consultant Engineer and Cx Responsibilities

DISCLAIMER The purpose of this document is to provide the design engineer with the guidelines for HVAC, electrical, plumbing, fire protection, fire alarm, nurse call, commissioning and controls, specified herein on NYPH campuses. This does not substitute the design engineer’s specifications for each project but provides the basis of the standards, which the design engineer shall follow. “ “The final responsibility for the design of the specific project resides with the design engineer of record.”

MASTERFORMAT divisions to latest CSI nomenclature: Mechanical Division 15 to Division 23 Fire Protection Division 15 to Division 21 Electrical Division 16 to Division 26 Added Sections include: Equipment Cuts Commissioning/Energy Compliance Guidelines Building Specific Checklist Updated to meet the latest 2008 NYC Building Code & 2010 FGI requirements.

Equipment pre- approval process developed with NYP Facilities Operations to standardize equipment types: improve maintenance reliability reduce the number of spare parts “Or Equal” was eliminated from the recommended manufacturers when 3 or more manufacturers were listed. A handful of “Proprietary” equipment manufacturers such as: ASCO Automatic Transfer Switches were identified as NYPH Standards. Architects and Engineering Firms will use selected NYP pre- approved Equipment from the Equipment Cut e-book that resides on the portal.

Locating Engineering Standards and Equipment Cuts on NYP Vendor Site https://e-net.nyp.org/sites/facilities/default.aspx

DRAFT NYP Load Letter Information A/E firms are responsible for providing a load letter describing all utility services required for the renovation or new building design. DRAFT Form to be rolled out by 3rd Q 2013 DRAFT

DRAFT NYSERDA Grant Information A/E firms are responsible to provide information necessary for NYSERDA Standard Grant Applications for Existing Buildings and New Construction to be filed with Energy Department of Facilities Operations. DRAFT Form to be rolled out by 3rd Q 2013 DRAFT

Updating and Maintaining the Design Standards and Equipment Cuts All stakeholders to provide updates and suggestions through FDC-E, including: FDC-Project teams & A/E Design Firms FO Directors, Managers and Shop personnel FDC-E is responsible for updating the Standards Standards will be maintained on a 3-year cycle – Changes in sections will be highlighted at each cycle Updating and Maintaining the Design Standards and Equipment Cuts

Document Review & Signoff Meetings with A/E Team FO / FD&C-E / FD&C project review meetings are held weekly. Currently meetings are held – CUMC – Tuesdays 8:30 to 9:30 WCMC – Thursdays 9:00 to 10:00 Drawings must be submitted prior to the meeting (minimum 2 weeks) Purpose of the review meetings – Drawing review and signoffs at each design phase Engineering Feasibility questions Value Engineering items Shop Drawings All MEP design professionals and architect are required to be present at meetings with project manager. Document Review & Signoff Meetings with A/E Team

FO / FD&C-E Project Review & Sign-off Process FD&C must obtain FO signoff at end of SD, DD, and CD phases FD&C will utilize Unifier Checklists to record signoffs Commissioning Agent works with FO to provide signoff Process Repeats For Concept, SD, DD, and CD phases Award Contract FD&C submits Plans & Specs for review Project Review Mtg. w/ Engineer FD&C submits Plans & Specs for review Bid Phase Review Redesignn FD&C Reviews bids Const. Phase Review Review Review Review 2 Wk Review Redesign Period Develop Bid Package A/E team provides 2 hardcopies & 1 electronic sets of plans & specs to FD&C-E contact. FD&C-E contact distributes drawings to FO and arranges review meetings to include Commissioning Agent. FD&C-E & FO issue comments to Commissioning Agent back to FD&C at meeting with Design Engineer. Engineer reviews and addresses comments on design review sheet. FD &C scans and records comments All bids must be based on Pre-Approved Construction Documents. Value Engineering of Infrastructure items must be reviewed and approved by FO .