LIU – EVM status and next steps

Slides:



Advertisements
Similar presentations
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Advertisements

1 1. Some recent views ( ) 2 Linac tunnel
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
1 Budget and spending 2013 (09/12). Project overview in APT (mid of year) 2 Part of the low EV may be attributed to the way work units have been defined.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
Wim Weterings Remy Noulibos
CNGS Review 15 July 2003 M. Meddahi1 EVM for CNGS Definitions Pre-requisites Application to CNGS.
Earned Value Management EVM. 03/06/2013 Earned Value Management Planned Value (PV): –Budget of the planned work.
Survey on “Chargés de Consignation” Status Update
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Linac4-PSB 160 MeV connection readiness review
East Area Renovation Project Team meeting # 2 – EDMS News
LIU – EVM status and next steps
AFC 2017 (and 2018) AFC timeline:
BE-CO Activities for LIU-CPS and LIU-SPS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Brief Status SPS Prototype PSB Prototype Installed in LS1
EYETS David Hay EN-OSS.
East Hall under construction
LIU Wire Scanner Milestones June 2017
LIU / HL-LHC Cost and Schedule Review
SPS - EYETS 2016/17 Vacuum systems planning
LIU–PLI report LIU PSB meeting.
News from EVM.
Planning and Installation
EC Activities Status for the LIU
LIU / HL-LHC Cost and Schedule Review
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE-ABT Activities for LS2
Status of the BI Work Package in the LIU-PSB frame
M.Jonker CTC MPO-WG status
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Update on the Ethernet Network Installation Campaign
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS PS + PS SWY + TT2 Facility Coordinator:
LIU and TE/ABT/PPE activities
TE-MSC activities in SPS during YETS
East Hall under construction
EYETS septa status Septa activities TE/ABT Thierry Masson
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
HIE-ISOLDE Project: Planning & Resources
Project Evaluation and Control
Monitoring and Controlling
Project Evaluation and Control
LIU-SPS review for BI (no BWS)
East Hall under construction
Status of the BI Work Package in the LIU-PSB frame
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

LIU – EVM status and next steps LIU-PS Contribution to overall CtC 2016 budget situation EVM budget trends 5 December 2016

LIU-PS contribution to overall LIU CtC In 2015 prices Work package Description Cost to Completion (Material + M to P) LIU-PS 4 RF systems 7,416 LIU-PS 5 Power Converters 3,042 LIU-PS 15 Civil Engineering 2,969 LIU-PS 9 Injection 2,931 LIU-PS 6 Beam instrumentation 2,356 LIU-PS 3 Magnets 1,000 LIU-PS 7 Beam Intercepting Devices 800 LIU-PS 8 Vacuum System 717 LIU-PS 1 Management 606 LIU-PS 16 Radiation Protection 560 LIU-PS 13 Cooling and Ventilation 260 LIU-PS 14 Installation, Transport and handling 230 LIU-PS 11 Controls 181 LIU-PS 2 Beam dynamics 151 LIU-PS 21 Commissioning and Operation 124 LIU-PS 12 Electrical Systems 75 LIU-PS 20 Survey 50 Total 23,470 groups MCHF RF 7.4 EPC 3 SMB ABT BI 2.4 MSC 1 STI 0.8 Others ~2.5 LIU-PS : ~13% of the LIU CtC 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

LIU-PS budget situation per group for year 2016 Major budgets in 2016: BE-BI, TE-EPC, TE-ABT, BE-RF, TE-VSC Many thanks to Ana Guerrero, Serge Pittet, Jan Borburgh, Carlo Rossi 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

Sylvie Prodon, Heiko Damerau LIU-Project team meeting LIU-PS Budget trends Data extraction : 29.11.16 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

Sylvie Prodon, Heiko Damerau LIU-Project team meeting LIU-PS Budget trends Budget code 61030 now belonging to BE/OP (K. Hanke) TE/ABT: Extended period to validate septum prototype and vacuum tank following 10/2016 review Corresponding budget (99252) must move to 2017 Injection kicker upgrade work on track and less expensive To be updated with next baseline BE/BI: BGI more expensive, 540 kCHF  620 kCHF Wire scanner design, 19 kCHF  50 kCHF Mainly BLM cabling already committed, payment expected in 2017 Details: https://indico.cern.ch/event/516893/contributions/2030412/attachments/1295557/1931529/BI_LIU_PS_review_June2016.pdf 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

Sylvie Prodon, Heiko Damerau LIU-Project team meeting LIU-PS Budget trends TE/EPC: Looks like massive overspending/commitment 150 kCHF overspent on 99268 (low energy magnet converters) with another 50 kCHF committed BUT: 160 kCHF will be transferred from EPC budget code (converter controls) Accounting adjustment book closing 2015 of 100 kCHF missing? 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

Sylvie Prodon, Heiko Damerau LIU-Project team meeting LIU-PS Budget trends Data extraction : 29.11.16 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

Sylvie Prodon, Heiko Damerau LIU-Project team meeting LIU-PS Budget trends BE/RF: High-level RF 2016 spending on track Work package redone by Sylvie and Carlo, accounting correction removed Low-level RF Underspending, electronics design office invoice outstanding TE/VSC: On track 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

Sylvie Prodon, Heiko Damerau LIU-Project team meeting LIU-PS EVM status for year 2016 status at the 2016 CSR and on 1st December 2016 2016 CSR 1st Dec. 2016 SV = -614 kCHF CV = -408 kCHF SV = -363 kCHF CV = -155 kCHF [1] Schedule Variance (SV) = Earned Value (EV) – Planned Value (PV) [2] Cost Variance (CV) = Earned Value (EV) – Actual Cost (AC) 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

EVM status metrics – 2016 CSR In kCHF   Comment Schedule Variance -614 BE-RF: Development of PS kicker cavity system not linear: 5% completion (WU from Jan- 15 to Dec-18). SV = -200 kCHF. BE-RF: Prototype development of high gain 10 MHz feedback amplifier & upgraded 40/80 MHz feedback amplifier not linear: 0.4 over 2 units completed (WU from Jun-15 to Mar- 17). SV = -200 kCHF. BE-RF: Digital beam control not linear: 0% completion (WU from Jun-16 to Jul-20). SV = - 100 kCHF. TE-ABT: Septa and bumper magnets 42 prototype studies. No unit delivered so far. SV = - 200 kCHF. BE-BI: Beam loss monitors electronics not linear: 19 units over 250 equipped (WU from Jan-16 to Dec-17). SV = -150 kCHF. EN-EL: Invoicing for cabling campaigns for EYETS 16-17 in progress. SV = +400 kCHF. Cost Variance -408 BE-BI: Beam loss monitors electronics: electronics components already procured but units not yet validated. CV = -250 kCHF. BE-RF: Components for prototype amplifiers, PS kicker system and digital beam control already purchased, but units not yet validated. CV = -400 kCHF. TE-EPC: Power converters components delivered in advance (batch contract). CV = -100 kCHF. EN-EL: Invoicing for cabling campaigns for EYETS 16-17 in progress. CV = +400 kCHF. 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

EVM status metrics – 1st Dec. 2016 In kCHF   Comment Schedule Variance -811 updated BE-RF: Development of PS kicker cavity system not linear: 5% completion (WU from Jan-15 to Dec-18). SV = -200 kCHF.  High-power RF WUs updated by Carlo and Sylvie BE-RF: Prototype development of high gain 10 MHz feedback amplifier & upgraded 40/80 MHz feedback amplifier not linear: 0.4 over 2 units completed (WU from Jun-15 to Mar-17). SV = -200 kCHF.  High-power RF WUs updated by Carlo and Sylvie BE-RF: Digital beam control not linear: 0% completion (WU from Jun-16 to Jul-20). SV = -100 kCHF.  Purchased hardware required in any case (1-turn FB boards) TE-ABT: Septa and bumper magnets 42 prototype studies. No unit delivered so far. SV = -450 kCHF.  Technical details to be clarified BE-BI: Beam loss monitors electronics not linear: 19 units over 250 equipped EN-EL: Invoicing for cabling campaigns for EYETS 16-17 in progress. SV = +400 kCHF. Cost Variance -430 BE-BI: Beam loss monitors electronics: electronics components already procured but units not yet validated. CV = -100 kCHF. BE-RF: Components for prototype amplifiers, PS kicker system and digital beam control already purchased, but units not yet validated. CV = -300 kCHF.  High-power RF WUs updated by Carlo and Sylvie TE-EPC: Power converters components delivered in advance (batch contract). CV = -300 kCHF. EN-EL: Invoicing for cabling campaigns for EYETS 16-17 in progress. CV = +400 kCHF. 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

EVM status metrics – 1st Dec. 2016 In kCHF   Comment Schedule Variance -363 Late reporting; real delays, e.g., TE/ABT or BE/RF Cost Variance -155 Cost increase, e.g., BGI; outstanding TID for power converters 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

LIU-PS example for the biggest variances Installation during EYETS Installation during EYETS Specifications for magnet first Late reporting? 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

LIU-PS example for the biggest variances External review in 10/2016 Changes to work package for 2017 baseline accordingly 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

LIU-PS TT2 EVM status for year 2016 status on 5th December 2016 SV = -167 kCHF CV = -38 kCHF On track One magnet with new power converter after EYETS for validation [1] Schedule Variance (SV) = Earned Value (EV) – Planned Value (PV) [2] Cost Variance (CV) = Earned Value (EV) – Actual Cost (AC) 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

Sylvie Prodon, Heiko Damerau LIU-Project team meeting Summary LIU-PS About 78% of 2016 budget spent, more than 100% committed Important increase of spending Technical delays and uncertainties in certain areas LIU-PS TT2 On track Re-baselining Opt for one baseline per year for straightforward follow-up Collect changes in between baselines 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting

LIU-PS budget situation for year 2016 5 December 2016 Sylvie Prodon, Heiko Damerau LIU-Project team meeting