STRATEGIC ACTION PROGRAM for the BERMEJO RIVER BINATIONAL BASIN

Slides:



Advertisements
Similar presentations
Focal Area and Cross Cutting Strategies – Land Degradation GEF Expanded Constituency Workshop March 22 – 24, 2011 Kyiv, Ukraine.
Advertisements

Cumulative Effects Management: Why We All Need to be Involved
STRATEGIC ACTION PROGRAM For the Binational Basin of the Bermejo River.
Workshop on Atbara Basin Transboundary Civil Society Engagement Kassala - Sudan (18 – 21 March 2007)
INTRODUCTION Organogram of DoF My role In the Department of Forestry
LVBC 3 RD LAKE VICTORIA BASIN DONORS’ CONFERENCE Round Table Three Economic and Infrastructure Development Lily Kisaka.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
La Plata River Basin Raquel Flinker. Climate Map (Source: 88% shared water resources 77% hydroelectric power.
World Bank Agriculture and Rural Development Program in Serbia And Synergies with Other IFIs and Government Institutions.
URBAN FLOODS IN GREECE Current situation and major research and development needs in Urban Flood Management Cost meeting, Warsaw, 29-31/5/2008 Vassilopoulos.
GEF/UNDP/IMO Regional Programme on Partnerships in Environmental Management for the Seas of East Asia (PEMSEA)
TRINATIONAL COMMISSION OF PLAN TRIFINIO Plan Trifinio and the Shared Watershed of the Lempa River El Salvador, Guatemala and Honduras Mercedes Llort Trinational.
The TNA Process in Costa Rica Experiences and lessons learned Francisco Sancho Advisor TNA
Okanagan Basin Conservation Programs (SOSCP and OCCP) 80+ organizations (government and non-government) working together to achieve shared conservation.
STRATEGIC ACTION PROGRAM For the Binational Basin of the Bermejo River.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
In the Name of God, Most Gracious, Most Merciful.
1 “TRANSBOUNDARY WATER COOPERATION IN CENTRAL ASIA” Dr. Saghit Ibatullin, Chairman Executive Committee of International Fund for saving the Aral Sea.
9/10/2015A GLOBALLY COMPETITIVE AND PROSPEROUS KENYA Challenges on Climate Change Adaptation in Kenya.
The GEF in Mexico Integrating GEF Programmes and Strategies at Country Level Cape Town, August, 2006.
Adressing Floods and Drought in GEF supported TDA/SAPs IWC-7 October 2013 Peter Bjornsen, UNEP-DHI Centre.
Preliminary theory of change for the South China Sea Project Cluster Neeraj Negi Reference Group Meeting Bangkok, Thailand September 27, 2010.
SUB REGIONAL WORKSHOP REPUBLIK OF SERBIA, 1-3 APRIL 2008 BULGARIA’S MOST SUCSESFUL PROJECTS funded by the Global Environment Facility.
1 Fabián Lozano Laboratorio de Sistemas de Información Georreferenciada, Centro de Calidad Ambiental, ITESM Campus Monterrey, Nuevo León, México Ordenamiento.
What is the NEPAD? It is a vision and strategic framework for Africa’s renewal. It has eight sectoral priorities, namely:  Infrastructure (ICTs, Energy,
Investment in Sustainable Natural Resource Management (focus: Agriculture) increases in agricultural productivity have come in part at the expense of deterioration.
A Framework for Sustainable Water Resources Management in the La Plata Basin, with Respect to the Hydrological Effects of Climatic Variability and Change.
GEF-6 Programming Directions in Natural Resources Management
Influence of climate change on desertification and degradation of soils in Tajikistan Boymurodov Ruzimurod Tajik agrarian university Tajikistan 2012.
“POLICY AND CHALLENGES ON ENVIRONMENT IN MONGOLIA – GEF COOPERATION” By J. Enkhsaikhan GEF Political Focal Point for Mongolia GEF Constituency Meeting.
Kyrgyzstan priorities in environment protection B. Tolongutov, Director, State Regulation Center on Environment Protection & Ecological Safety Sector State.
Enver AKSOY, MSc Head of Strategy Development Board of MoFAL Policy approaches of Ministry of Food, Agriculture and Livestock to pasture management in.
United Nations Environment Programme Regional Cooperation and Coordination Experiences Marieta Sakalian Programme Management/Liaison Officer Biodiversity.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
International technical assistance project: «Baltic Landscape in change – innovative approaches towards sustainable forested landscapes» Work Package 6.
ANA AGÊNCIA NACIONAL DE ÁGUAS SESSION 5 - WATER GOVERNANCE IN BRAZIL Gisela Forattini Voorburg, the Netherlands May 2006 USER-PRODUCER CONFERENCE:
1. Sustainable Development. International commitment. COORDINATION. A LONG-TERM VISSION. Policies Enhance the economic growth. Certainty and Economic.
Mohamed Bakarr Senior Environmental Specialist GEF Familiarization Seminar Washington, DC January 17 – 19, 2012 GEF Strategies, Activities and Accomplishment:
Morelos, tierra de libertad y trabajo Payment for Ambiental Services in Forestal Ecosistems (PSA) Istanbul, Turkey, March, 2009.
ICZM PROTOCOL INDICATORS THE MEDITERRANEAN PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT: What indicators are needed? Marko PREM Director a.i.
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
Mekong River Commission Meeting the Needs - Keeping the Balance MRC Water Utilization Programme: GEF International Waters Project (GEF/World Bank)
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
The Mekong River Commission: Challenges, Mission, and Strategies.
INTER-AMERICAN DEVELOPMENT BANK Infrastructure and Environment Department (INE) Environment, Rural Development and Natural Disasters Division (RND) Agriculture,
The Framework program for the sustainable management of La Plata Basin's water resources in relation with the effects of variability and climate change.
PROCUENCA SAN JUAN Formulation of a Strategic Actions Program for the Integrated Management of the Hydrological Resources and Sustainable Development of.
Environmental protection of the Rio de la Plata and its Maritime Front: Pollution Prevention and Control and Restoration of Habitats PROJECT: RLA/99/G31.
REGIONAL DIALOGUE ON THE ENVIRONMENT
Preliminary theory of change for the South China Sea Project Cluster
Biodiversity.europa.eu BISE EEA and ETC/BD Rania Spyropoulou.
DELTAmerica Project Development and implementation
Institutional Strengthening Support
A Framework for Sustainable Water Resources Management in the La Plata Basin, with respect to the Hydrological effects of Climatic Variability and.
THE SIXAOLA RIVER BASIN BINATIONAL COMMISSION COSTA RICA – PANAMA:
NATURAL RESOURCES AND THEIR CONSERVATION
District Disaster Risk Reduction Managment Plan
Hidefumi Imura Professor, Nagoya University
The 1st Draft of Thailand National Adaptation Plan
Partnership for the Gulf of Mexico SEMARNAT GCOOS MoA
Concepts in Water Resources Management
Overview of Bank Water Sector Activities
MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT
Personal presentation
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
NATURAL RESOURCES AND THEIR CONSERVATION
Presentation transcript:

STRATEGIC ACTION PROGRAM for the BERMEJO RIVER BINATIONAL BASIN Argentina - Bolivia Good morning ladies and gentlemen, I will make a presentation of the GEF Project “Strategic Action Program for de Bermejo River Binational Basin” SALVADOR BAHIA (JUNE 2005)

Here is indicated the location of the basin, which forms part of the much larger basin of the La Plata River, showing how the Bermejo River is the most important link between this basin and the Andean mountain range.

BINATIONAL BASIN OF THE BERMEJO RIVER BOLIVIA ARGENTINA This map shows the total area of the basin of more than 123.000 square kilometers, the Argentinean portion representing 90 % of the total area and Bolivian portion representing 10% of it. Area: Total: 123.162 Km2 In Bolivia: 10 % In Argentina: 90 % Length of the main course of the river: 1.300 km Population: 1.200.000 inhabitants

TRANSBOUNDARY MANIFESTATION ENVIRONMENTAL PROBLEM IDENTIFIED IN THE TRANSBOUNDARY DIAGNOSTIC ANALYSIS Soil degradation, intense erosion and desertification processes, and water quality deterioration TRANSBOUNDARY MANIFESTATION Erosion and sediment transport and deposition, influencing fluviomorphological dynamics and with impact in the use of water resources, in the processes of formation of the Delta of the Paraná river and in the ship canals of the Plata river.

BERMEJO RIVER Sediment Discharge BOLIVIA Upper Bermejo : 10 % (5.086 Km2) Grande de Tarija River: 15 % (10.760 Km2) Pescado River: 6 % (1.800 Km2) ARGENTINA Iruya River: 42 % (3.002 Km2) Blanco River: 7 % (1.930 Km2) This graphic shows the sediment discharge to the Paragua –Paraná stem estimated in 100 million tons per ear which represent 80% of the total sediment discharge to the Paraná Delta; the high Sediment loading of 8 kg/m3 an the contribution of the basin I which PEA is ctually working Bermejo River: 100.000.000 t/year (50.191 Km2) (Approximately 80 % of sediments in the Paraná Plata system.) Sediment loading 8 kg/m3 20 San Francisco River: 20 % (25.800 Km2)

AREAS WITH INTENSE EROSION PROCESSES Central Valley, Tarija, Bolivia Fluviolacustrine flatland, 1600 square kilometers Deep, sedimentary soils, mostly silt- clay Iruya River Basin, Argentina 3.002 Km2; Deep, sedimentary soils, mostly silt- clay Huasamayo River Basin, Argentina 150 Km2, Fine soils, mostly clay.

Central Valley, Tarija, Bolivia Erosion, in ditches (Bad Lands). Fluviolacustrine flatland

Erosion in Huasamayo river tributaries River beds filed up with sediment (Junction of Huasamayo and Grande rivers. Town of Tilcara)

MUD FLOWING IN THE BED OF A TRIBUTARY OF THE RIVER COLANZULÍ FALL OF MUD IN THE RIVER MILMAHUASI–IRUYA

CAUSES OF THE ENVIROMENTAL PROBLEM Causes of Natural Origin Adverse natural conditions (soil, topography, geology, climate). Basic Causes Deficient political, legal, and institutional framework. Deficient financial and support mechanisms. PROBLEM SOIL DEGRADATION, EROSION, DESERTIFICATION, &WATER QUALITY DETERIORATION Causes of Human Origin Destruction of vegetative cover by deforestation and overgrazing. Elimination of natural vegetation for agricultural use.

LONG TERM MITIGATION STRATEGY INSTITUTIONAL DEVELOPMENT AND STRENGTHENING ENVIROMENTAL PROTECTION AND REHABILITATION Institutional strengthening Development of an Environmental Information System for the Basin. Development of economic instruments and financial mechanisms. Prevention and control of erosion and sedimentation Biodiversity protection. Strengthening and consolidation of the system of protected areas. SOIL DEGRADATION, EROSION AND DESERTIFICATION & WATER QUALITY DETERIORATION PROBLEM SUSTAINABLE DEVELOPMENT OF NATURAL RESOURCES PUBLIC AWARNESS AND PARTICIPATION Strengthening of public participation. Environmental education. Dissemination of sustainable technologies for production. Access to and public dissemination of information to support decision making Implementation of integrated management plans for the basin. Appropriate technologies, management practices and production methods. Sustainable water resources development and utilization projects. Research for natural resources development and management.

SHORT TERM STRATEGY Implementation of catalytic strategic projects Formulation of complementary studies Actions to catalyze long-term projects and programs

IMPLEMENTED CATALYTIC STRATEGIC PROJECTS LA TABLADA and MENA BASINS Small dams for sediment retention and consolidation of water beds with benefits to local communities

Fruit tree plantations AGRO FORESTRY PRACTICES BENEFICIARIES PARTICIPATION IS ESSENTIAL FOR SUCCES RÍO MENA BASIN Contour borders Barriers with vegetation Fruit tree plantations Forestry Plantations Enclosures

IRRIGATION CANNALS- RIVER MENA BASIN

SEDIMENT CONTROL CATALYTIC STRATEGIC PROJECT IN THE MENA RIVER BASIN Twelve dams for sediment retention, with 387.000 m3 of total reservoir capacity with an useful life of 12 to 15 years. The cost of retained sediment is 0,8 $us/m3, lower than the of value of benefits (0,95 $us) of 1 m3 of reservoir of the project San Jacinto. The Project has a capacity of retention of sediments of 33.400 m3/year; representing 5% of the sediments that enter to the reservoir of San Jacinto (730.000 m3/year) These dams were complemented with small irrigation systems and agro forestry practices, designed and implemented with beneficiaries participation. These projects are transferred to beneficiaries for operation and maintenance.

Control works in the Huasamayo and Iruya rivers Defensive works at Iruya

Iruya and Huasamayo Catalytic Strategic Projects The initial objective of erosion mitigation was enlarged to incorporate local cultural particularities. In the Huasamayo river sub basin were incorporated: Risk reduction to people and its goods, Local population training, Territorial classification, and Promotion of sustainable development.

IRUYA RIVER MANAGEMENT CATALYTIC STRATEGIC PROJECT Control dams: 6 with 1.200 m3. Defensive dams, 150 m in the Milmahuasi river Rainfall drainage canals in Iruya. Sediment retention of 232.000 m3 was estimated, once the enlargements of dams are completed.

CATALYTIC STRATEGIC MANAGEMENT OF HUASAMAYO SUB-BASIN 64 small sediment retention and protection dams. Cleaning of river bed from Tilcara to the union with the río Grande Non structural messeaures: Nursery of native plants Training and environmental awareness. Environmental zoning and land use regulation.

LESSONS LEARNED It is fundamental that sediment control projects secure strong long-term local benefits, such as irrigation and water for human and animal consumption, to guaranty global impact and benefits at the Plata basin level. Protection enclosures and tree plantations, have good results when made in individual property. In communal lands it is difficult to guaranty sustainability. Small dams are an effective way to control sediment transport and to prolong useful life of down stream dams. Once filled up, the small reservoirs stabilize the river bed, diminish the collapse of its sides and provide stabilized areas with good soil for cultivation. These small reservoirs, should be located in basins that produce grater quantity of sediments per unit of area . Peasant's permanent orientation for the operation and maintenance of the projects, must be provided. In the Tolomosa basin in Tarija Central Valley this quantity is 5 times greater in the fluviolacustrine formation ( 8.500 m3/km2/year) than the average of the basin (1.700 m3/km2/año).

LOCAL BENEFITS Decrease of soil degradation and sediment production and transport. Increase of reservoirs useful life Safety improvement in river margins. Vegetation cover recuperation, water supply for human and animal consumption and irrigation. Protection of headwaters, water quality & quantity. Public participation increase. Increase environmental awareness and education.

GLOBAL BENEFITS AND ITS LINKAGE TO THE PLATA BASIN The “Study of Sediments of the Bermejo Basin and their Impact in the Plata Basin” made at request of the Inter-Governmental Committee of the Plata basin (CIC) will provide up to date information on the generation, transport and discharge of sediments, representing a real contribution from SAP Bermejo to the Plata basin. The above mentioned study will contribute to the knowledge base for the construction of the Cambarí dam in the Tarija River, which will be implemented by Argentina and Bolivia trough the Bermejo Bi National Commission and will retain an estimated 8 million tons per year of sediment representing around 6 % of the total annual sediments discharged in the Plata basin, according to current estimates. The retention of sediments will improve the functioning of the Plata basin, diminishing sediment deposits, the amount of drainage needed in the navigation canals of the Buenos Aires port (with an estimated total cost of 30 million dollars per year) and diminishing the cost of maintenance in irrigation systems. The cost of drainage of navigation canals in the Port of Buenos Aires was estimated in “Cuenca del Río de la Plata – Estudio para su Planificación Desarrollo –I – Alta Cuenca del Río Bermejo – O.E.A. 1.974”

GLOBAL BENEFITS AND ITS LINKAGE TO THE PLATA BASIN The implementation of a Hydro meteorological Network in the bi national basin that will include sediment monitoring is a contribution to the permanent up dating and analysis of the transport of sediments in the Plata basin. Generation of information useful for replication at the Plata Basin level and other basins (pilot project results, thematic charts, water course classification, carbon sequestration, biodiversity studies, and others) The sediment control demonstrative projects implemented in the two countries could be replicated in larger scales in the Bermejo, the Plata and other basins with similar conditions. A replication example of the demonstrative projects of the basins of Tablada (13 km2) and Mena (65 km2) is the “Study for the Control of Sediments in the Tolomosa basin” (432 km2) currently under way. Availability of projects for replication in La Plata river basin and other basins whose lessons learned and selected practices are already been used in the design of a Master Plan for the development of the Pilcomayo basin shared by Argentina, Bolivia and Paraguay.

GLOBAL BENEFITS AND ITS LINKAGE TO THE PLATA BASIN The consolidation of protected areas (Sama, Tariquía, Baritú Calilegua), the implementation of an environmental corridor among the last three, and a biosphere reservation, will diminish the degradation of soils and production of sediment and contribute to the maintenance of the headwaters in the upper Plata basin & protect biodiversity in the Yungas ecosystem. The establishment and functioning of a Regional Coordinating Committee with representatives of provincial administrations of Argentina and the Prefecture and Municipalities of Tarija; and the Regional Advisory Committee, with representatives of NGOs, academic institutions, scientific and technical organizations, the private sector, citizens and corporations, builds confidence among stakeholders and countries and allow scaling up to the Plata basin.

GLOBAL BENEFITS AND ITS LINKAGE TO THE PLATA BASIN Incorporation of SAP Bermejo projects in the planning of regional institutions and establishment of agreements with public and academic institutions. The methodological focuses, outputs, learned lessons, arisen recommendations and experiences of the Bermejo basin have been presented in the preparatory meetings of the Inter-Governmental Committee of the Plata basin (CIC) for the preparation of the Frame Program of the Plata basin, and they have served as basis for their formulation. The signing of a Collaboration Agreement between the Bermejo Binational Commission and the Committee of the Plata basin (CIC), with specific reference to de SAP Bermejo, establishes a permanent coordination and collaboration among the SAP Bermejo and the Plata Basin.

COMPREHENSIVE STRATEGY In addition to the catalytic strategic projects explained, others, for which there is no time to inform, have been implemented in different areas such as: Institutional Strengthening Public awareness and participation Environmental education. Strengthening of national parks and establishment of corridors between them. Carbon sequestration. Biodiversity protection and conservation. Information about these projects is shown in the PEA Bermejo stand.