LP cosmic Trigger Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G. De Lentdecker, S. Hervé, X. Janssen, D. Jourde, Y. Kato, H. Kuroiwa, Y. Kudenko,

Slides:



Advertisements
Similar presentations
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
Advertisements

MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
60 Hz Variations in Pins Plugged probe into temperature controller output pins: pins 1, 2, 3, 4 all show 1V p-p variations Plugged probe into pins at other.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
6mm 【 Development of Readout Electronics for MPPC 】 We report the read out electronics of MPPC( Multi-Pixel Photon Counter ). MPPC is a new photodetector.
Zeuthen, January 16, 2008 P. Colas - LP cosmic trigger 1 The cosmic trigger for the Large Prototype Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
Resistive bulk Micromegas panels for the TPC D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Introduction Status.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Status of NA62 straw electronics Webs Covers Services Readout.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design.
The Design of an Electronic Bicycle Monitor (EBM) Team P118: Gary Berglund Andrew Gardner Emrys Maier Ammar Mohammad.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Gain stability and the LYSO beam radiation monitor measurements
December 5, 2007 P. Colas - LP cosmic trigger 1 The cosmic trigger for the Large Prototype Th. Chaminade, P. Colas, K. Dehmelt, G. De Lentdecker, X. Janssen,
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
FEE Electronics progress PCB layout 18th March 2009.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
FUNCTION GENERATOR.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range.
Bill Raynor Naval Research Lab
Solid State Amplifier Development at PSI
ELG4135: Electronics III (Fall 2005)
Large Area Endplate Prototype for the LC TPC
T1 Electronic status Conclusions Electronics Cards:
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Amplitude Modulation Circuits
10/month is the present production rate 2 FTE + sporadic contributions
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
MicroMegas Mechanical Meeting --- Cern April 2014
WP02 PRR: Master Oscillator and RF Reference Distribution
Christophe Beigbeder PID meeting
TPC Large Prototype Toward 7 Micromegas modules
Status Brussels GANTRY
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Assembly order PCB design
UK ECAL Hardware Status
BESIII EMC electronics
EVLA Advisory Committee Meeting System Status
7-PMT cluster + Slow control + DRS4 readout system ver.3 by Dragon
UK CMS Oversight Committee Mtg
TSF Upgrade Project Overview Resources Plans and Timetable
FEE Electronics progress
The cosmic trigger for the Large Prototype
ELENA / AD Pick-ups and Schottky
FIT detector as Luminometer for RUN3
Presentation transcript:

LP cosmic Trigger Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G. De Lentdecker, S. Hervé, X. Janssen, D. Jourde, Y. Kato, H. Kuroiwa, Y. Kudenko, T. Matsuda, F. Pierre, J.M. Reymond, M. Riallot, F. Senée, S. Turnbull

Support mechanics and wrapping ready since Feb-March 1 module has been assembled (3 slabs) Warsaw, June 12, 2008 P. Colas, LP trigger

Thermics (J.M. Reymond) Based on thermoelectric coolers (TEC) (Peltier devices) and hybrid HYTEK controller HY5610 controller: 12v, +/- 2Amps, Stability 0,01°C Proportional / Integral Control Upper Copper Thermic gel Lower Copper Al Support

The thermo-mechanics and card support is designed. The supplies and cables are delivered. The final delivery of mechanical pieces is due to June 26. Warsaw, June 12, 2008 P. Colas, LP trigger

Decision to go for a clean card Status as of early May 2008, with test PCB: not perfect (oscillation of the amplifiers), but works Decision to go for a clean card 10 mV Warsaw, June 12, 2008 P. Colas, LP trigger

The first final card arrived and was tested yesterday Excellent result: 40 mV/photo-electron, stable signals Other cards to be delivered tomorrow Analogic sum of 2 MPPCs 40 p.e. : expect 1.6 V output 40 mV Warsaw, June 12, 2008 P. Colas, LP trigger

Later on the logic should be programmed on a FPGA. The trigger system will be soon ready for mounting. Will use standard logic modules at the beginning, maybe TLU when available. Later on the logic should be programmed on a FPGA. Warsaw, June 12, 2008 P. Colas, LP trigger