Using project records to show delay and disruption

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
IX- CONSTRUCTION PLANNING
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
1. Introduction Time is of essence in basically every construction project Yet, delays of some sort are general rule, rather than the exception Consequence:
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Preliminary Project Descriptions/Outline Specifications
PROJECT PLANNING AND SCHEDULLING
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
Copyright 2013 Field Training Services Pre Job Planning Tim Faller Field Training Services
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
INCOME COMPUTATION & DISCLOSURE STANDARDS (ICDS).
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
Procurement and Contract Management Training
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Roles and responsibilities PM
The Design Team Carl James.
Procuring Professional Services
Maintenance Scheduling
Administration of a FIDIC Contract - Project Control
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Drawings Introduction to FIDIC - Drawings -.
JOHN DELANEY - FRICS, MSCSI, FCIArb ASSOCIATE DIRECTOR – HKA LONDON
Contractor’s Post-contract Cost Management Processes
TOPIC-8A- PROJECT TIME CONTROL
Costs and Economics of Construction
REVENUE AND EXPENSE RECOGNITION
Extension of time and how it is granted to a contractor (Referencing JCT 2005)
Chapter 5 :The Business Plan (Creating and Starting The) Venture
Project Planning and Scheduling
FUNDING MODEL
Temporary Works Co-ordination
ENGINEERING MANAGEMENT (GE 404)
MAINTENANCE PLANNING AND SCHEDULING
Lean thinking in EPC Projects
Engineering Project Tendering.
CONTRACT ADMINISTRATION
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
OF TECHNOLOGY & MANAGEMENT Advanced Diploma in Facilities Management
ARCH 435 PROJECT MANAGEMENT
General Foundry Example of PERT/CPM
Dennis Li - HKCIC Lecturer
Dennis Li - HKCIC Lecturer
PRESENTATION ON THE FINANCIAL MANAGEMENT INFORMATION 3rd QUARTER IRO 2007/ FEBRUARY 2008.
Customer Overview Pack – July 2018
Customer Overview Pack – July 2018
Construction Contract Administration
ENGINEERING MANAGEMENT (GE 404)
Directed Change Constructive Change
Bridge forms critical path (6 months to construct)
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Advancd Measurement and Contract Administration
Presentation transcript:

Using project records to show delay and disruption CMG CONFERENCE – DUN LAOGHAIRE DUBLIN 6 SEPTEMBER 2017 Using project records to show delay and disruption GEOFF BEWSEY PARTNER – HKA LONDON

TO SHOW DELAY CAUSITIVE EVENT - RECORDS DELAY TO PROGRESS – “work activities take longer than anticipated” “anticipated” = PROGRAMME “take longer” = RECORDS DELAY TO COMPLETION – “… Substantial Completion of the Works or any Section has been, is being or will be delayed beyond the Date for Substantial Completion …” DELAY TO PROGRESS plus ANALYSIS

Programme AND REVISIONS – CURRENT INTENTIONS Public Works Contract: 4.9.1 – “The programme shall be of a quality that will permit effective monitoring of the Works … ” 4.9.3 – “If the Contractor’s programme most recently submitted … does not correspond with actual or reasonably projected progress or the Contractor’s obligations, the Contractor shall … submit … a revised programme … ” NEC 3: 31.3 (implied): practicable show the information which the contract requires; represents the Contractor's plans realistically; comply with the Works Information 32.2 – “… a revised programme … at no longer interval than the interval stated in the Contract Data … “ (typically monthly or 28 days)

PLANNING METHOD STATEMENT Public Works Contract: 4.9.1 (2) - “the order in which and times at which the Contractor proposes to execute the Works, including details of procurement, manufacture, delivery, installation, construction, testing, commissioning and trial operation of Works Items and the sequencing and timing of inspections and of tests”

RECORDS Public Works Contract: 4.10.1 – “… monthly progress reports… ” – see 4.10.2 for content 4.10.2. (1) – “a detailed description of progress of each stage of the Works against the Contractor’s current programme” 9.3.1 – “… the Contractor shall give … full details of the delay and its effect on the progress of the Works.” 10.3.1 (1) – “… details of … all relevant facts about the claim.” NEC3: 32.1: the actual progress achieved on each operation and its effect upon the timing of the remaining work the effects of implemented compensation events and of notified early warning matters GENERIC: What happened, when and why

TO SHOW DISRUPTION DISRUPTION: “a disturbance, hindrance or interruption to a Contractor’s normal working methods, resulting in lower efficiency.” CAUSITIVE EVENT - “a disturbance, hindrance or interruption”: RECORDS LOSS OF PRODUCTIVITY - “normal working methods”: RESOURCED PROGRAMME, METHOD STATEMENTS, MEASURED MILE ANALYSIS (RECORDS) “lower efficiency”: EARNED VALUE PRODUCTIVITY ANALYSIS (RECORDS) DISRUPTION ANALYSIS – LOSS OF PRODUCTIVITY plus ANALYSIS - alignment of cause and effect, “balance of probability”

RESOURCED Programme Public Works Contract: 4.9.1 (4) – “the Contractor’s estimate of each category of Contractor’s Personnel and Contractor’s Things expected to be on Site for each period” 4.9.1 (6) – “… critical resources… ” NEC 3: 32.2 – “for each operation, a statement of how the Contractor plans to do the work identifying the principal Equipment and other resources which he plans to use” GENERIC: Per programme activity: Planned work quantities Planned resource – principal labour, plant and equipment

RECORDS Public Works Contract: 4.10.2 (2) – “the names of Specialists and the off-site suppliers of the main Works Items, and progress and location of the design, manufacture, fabrication, delivery, installation, testing and commissioning of Works Items” 4.10.2 (3) – “details of the Contractor’s Personnel and Contractor’s Things on the Site” GENERIC: Per programme activity: Work quantities achieved per week Daily labour allocations Daily plant and equipment allocations WBS / S-E-L-O programme and record system See next slide

STRUCTURE ELEMENT LOCATION OPERATION NEW BRIDGE POUR 2 POUR 1 POUR 3 PARAPET DECK WALL PIER WALL BASE BASE BASE NORTH ABUTMENT CENTRE SOUTH ABUTMENT REDUCE PILE EXCAVATE PILE BREAK BLIND STEELFIX FORMWORK CONCRETE FALSEWORK FINISHING DRAINAGE BACKFILL

RECORDS, Monitoring and Management GJB Quantity Surveyors Project Manager Site Manager 3 - General Foremen 350 operatives - 36 structures - 7 kilometres - 2 years The records 3 – Record Engineers

DISRUPTION ANALYSIS – LOSS OF PRODUCTIVITY - LABOUR

DISRUPTION ANALYSIS – EXTENDED EARNED VALUE ANALYSIS

DISRUPTION ANALYSIS – EXTENT OF DISRUPTION - HOURS

DISRUPTION ANALYSIS – EXTENT OF DISRUPTION - PERCENT

TO SHOW DISRUPTION DISRUPTION: “a disturbance, hindrance or interruption to a Contractor’s normal working methods, resulting in lower efficiency.” CAUSITIVE EVENT - “a disturbance, hindrance or interruption”: RECORDS LOSS OF PRODUCTIVITY - “normal working methods”: RESOURCED PROGRAMME, METHOD STATEMENTS, MEASURED MILE ANALYSIS (RECORDS) “lower efficiency”: EARNED VALUE PRODUCTIVITY ANALYSIS (RECORDS) DISRUPTION ANALYSIS – LOSS OF PRODUCTIVITY plus ANALYSIS - alignment of cause and effect, “balance of probability”

GEOFF BEWSEY Partner, HKA geoffbewsey@hka.com 06 September 2017 Questions? GEOFF BEWSEY Partner, HKA geoffbewsey@hka.com