Reliability Assessment Committee Proposal TSS Meeting

Slides:



Advertisements
Similar presentations
Strategic Planning Update For Board Meeting December 5, 2007.
Advertisements

WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Section 4.9 Review Work Group Update to Board of Directors March 11, 2015.
It’s Time to Talk About Risk and Control
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Keegan Moyer Manager, Transmission Expansion Planning TEPPC Update July 16, 2014 WECC - Salt Lake City, UT.
MAC Committee Update Robert Kondziolka, MAC Chair.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
WECC Section 4.9 Review Update Town Hall Meeting August 26, 2015.
Water Supply Planning Initiative State Water Commission November 22, 2004.
WECC Response to DOE Funding Opportunity on Regional Planning Northwest Wind Integration Forum Steering Committee January 6, 2010 Tom Schneider Managing.
Update: 4.9 Work Team on Committee Role, Scope and Structure Melanie Frye Vice President, Reliability Planning and Performance Analysis W ESTERN E LECTRICITY.
ERCOT Strategic Plan H.B. “Trip” Doggett President and Chief Executive Officer Technical Advisory Committee ERCOT Public December 3, 2013.
The role of the INTOSAI CBC in the INTOSAI value chain September 2015.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Section 4.9 Review Progress Report Standing Committees Meeting October 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Section 4.9 Review Report Request for MAC Approval December 1, 2015.
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Review Task Force Proposed Process W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RAC Implementation Status
Interchange Scheduling & Accounting Subcommittee
TEPPC Review Task Force Meeting February 4-5, 2016
Overview of U.S. Participation in ISO and IEC
Nick Hatton Associate Engineer March 9, 2017
Reliability Assessment Committee
Technical Advisory Subcommittee Process Improvement Discussion
IT Governance Planning Overview
MIC Committee Discussion
Scenario Scoping Process
Reliability Assessment Committee Reliability Workshop Priorities
ColumbiaGrid Planning Meeting WECC Update February 9, 2017
Overview of WMO Strategic Planning Initiative
Grace Anderson Chair, Budget Work Group April 19, 2017
Grace Anderson Chair, Budget Work Group April 19, 2017
ADS and WPR Seed Case Background
Transforming Scenario Narratives into Study Cases
RAC Implementation Status
Future Scenario Development
Context: Scenario Studies
Finance & Planning Committee of the San Francisco Health Commission
Strategic Planning Process
Long Term Grid Assessment – Preparing for 2018 Studies
Request for MAC Approval December 1, 2015
Strategic Planning Process
Context: Scenario Studies
Reliability Assessment Committee Reliability Workshop Priorities
Scenario Scoping Process
Grace Anderson Chair, Budget Work Group April 19, 2017
Portfolio, Programme and Project
Grace Anderson Chair, Budget Work Group April 19, 2017
Shelli Nyland Supervisor, Administrative Services and Support
Performance Measure Recommendations
WECC 2019 Scenarios – Scoping
ADS and WPR Seed Case Background
MIC Committee Discussion
Future Scenario Development
EUnetHTA Assembly May 2018.
MAC Input on Section 4.9 Review
Presentation transcript:

Reliability Assessment Committee Proposal TSS Meeting August 24-26, 2016 Philip Augustin/David Franklin

4.9 Review Scope Of Work Review the WECC committee structure that will include Board, Standing and other committees as well as supporting work groups and task forces.  An independent “clean sheet approach” will be utilized for the review.  The general objective of the process, and anticipated outcome, is to identify a WECC committee structure organization that is simpler, user friendly, more flexible, and cost effective for member interaction.  Board Committees Standing Committees Standing Committees Subcommittees Standing Committees’ Permanent Work Groups and Task Forces Coordination of WECC-Peak Reliability Assessments on Committees to ensure there are no gaps and to identify potential duplication

Reliability Assessment Committee Proposal The Joint PCC TEPPCC Review Task Force (JPTRTF) developed a recommendation to create the Reliability Assessment Committee (RAC) which would replace the PCC and TEPPC while continuing to produce all of the work products currently produced by the PCC and TEPPC. The JPTRTF recommends that the WECC Board of Directors create the Reliability Assessment Committee to replace the PCC and TEPPC. The following are key elements of the proposal to create the RAC. All work products currently produced by the PCC and TEPPC would continue to be produced by the RAC and its subcommittees. In addition, WECC would develop a new product, the Anchor Data Set, designed to promote consistency among the data used in the various WECC reliability assessment models.

RAC Goal The goal of the proposed Reliability Assessment Committee (RAC) is to create a single reliability assessment organization within WECC that will facilitate a unified approach to evaluating potential reliability risks, efficiently use the expertise of external stakeholders and ensure consistent collection, application and management of data used for reliability analyses. In this recommendation, “reliability assessment” is understood to mean any technical, economic or policy-related assessment that provides insight into potential future reliability risks and the ability to maintain uninterrupted electric service to customers in the Western Interconnection.

Benefits of Creating the RAC Reliability assessment expertise focused within a single committee. Unification of all reliability assessment activities under a single organization Reduced duplication in data collection Facilitate an accurate, consistent and complete data set for Western Interconnection reliability assessment Increased stakeholder buy-in Improved coordination between WECC’s near- and long-term reliability assessment activities Enhanced verification of data sources and modeling assumptions More focused stakeholder engagement and participation Improved efficiency and cost effectiveness Improved Alignment with WECC’s Three-Year Strategic Plans Better Coordination Between Committees

Proposed RAC Structure The proposed structure assigns the following responsibilities for addressing reliability assessment questions: Reliability Assessment Committee (RAC): What reliability risks might WECC face in the next 20 years? Scenario Development Subcommittee: What are the plausible futures in which potential reliability risks could arise? Studies Subcommittee: What studies should WECC perform to better understand potential reliability risks? Modeling Subcommittee: What models should WECC use to complete necessary reliability studies and to identify potential mitigation solutions? Data Subcommittee: What data will WECC need to complete necessary technical and economic reliability studies?

Proposed RAC Structure

RAC Governing Body The Reliability Assessment Committee (RAC) encompasses all of the stakeholders involved with WECC’s reliability assessment activities including subcommittee and work group activities.  All stakeholders are invited and welcome to participate in all of the RAC’s assessment discussions and analyses. The RAC Governing Body would be composed of the following members: RAC Chair Scenario Development Subcommittee Chair Studies Subcommittee Chair Modeling Subcommittee Chair Data Subcommittee Chair

Scenario Subcommittee Scenario planning develops narratives of these futures by reviewing drivers, such as economic growth, technological development, policy development and socio-political trends—that could affect the context in which planners will be expected to make decision affecting reliability. Following is the recommended Scenario Development Subcommittee Governing Body membership: Scenario Development Subcommittee Chair Studies Subcommittee Vice Chair Member Class Representative - Class 1 Member Class Representative - Class 2 Member Class Representative - Class 3 Member Class Representative - Class 4 Member Class Representative - Class 5 Planning Region Representative Consumer Advocate Environmental Advocates (2) Technology Advocates (2) International Government Representative Tribal/First Nations Representative

Studies Subcommittee The Studies Subcommittee would be responsible for developing, reviewing and approving an annual study program for reliability assessments. Reliability assessments could include power flow analyses, stability analyses, economic studies, resource adequacy assessments, policy-related analyses or any other studies needed to provide insight into potential future reliability risks and opportunities. Following is the recommended Scenario Development Subcommittee Governing Body membership: Studies Subcommittee Chair Scenario Development Subcommittee Vice-Chair Member Class Representative - Class 1 Member Class Representative - Class 2 Member Class Representative - Class 3 Member Class Representative - Class 4 Member Class Representative - Class 5 Five Individuals who collectively have a Variety of PCM, PF and Other Study Expertise Peak Reliability Representative

Modeling Subcommittee The Modeling Subcommittee (MS) would provide overall guidance for WECC’s models used in reliability assessment activities. Following is the recommended Scenario Development Subcommittee Governing Body membership: Modeling Subcommittee Chair Member Class Representative - Class 1 Member Class Representative - Class 2 Member Class Representative - Class 3 Member Class Representative - Class 4 Member Class Representative - Class 5 Member with power flow model expertise Member with production cost model expertise Member with long-term planning tool expertise Member with other model expertise Data Subcommittee vice chair PCM Modeling Work Group chair PF Modeling Work Group chair

Data Subcommittee The Data Subcommittee (DS) would provide overall guidance for gathering, refining and applying data to WECC’s models and stand-alone databases. Following is the recommended Scenario Development Subcommittee Governing Body membership: Data Subcommittee Chair Member Class Representative - Class 1 Member Class Representative - Class 2 Member Class Representative - Class 3 Member Class Representative - Class 4 Member Class Representative - Class 5 Member with power flow data expertise Member with production cost data expertise Member with capital cost data expertise Member with loads and resources data expertise Modeling Subcommittee vice chair PCM Data Work Group chair PF Data Work Group chair Environmental Data Work Group chair Peak Reliability Representative

Timeline August 24-September 13: Draft Recommendation – Stakeholder Comment Period (Closes at 5:00 pm) September 30: Recommendations – Posted November 4: Recommendations considered by PCC November 4-14: JPTRTF consider PCC input and decisions November 14: Final Recommendations posted for Board consideration December 7: Final Recommendations considered by Board January 2017: Committee will begin, but PCC and TEPPC will transition to RAC up to July