A.-L. Perrot, TS/LEA-int LEMIC A.L. Perrot – TS/LEA/int LEMIC

Slides:



Advertisements
Similar presentations
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
Advertisements

Impact of LHCf on BRAN and beam monitoring Y.Itow, H.Menjo (Nagoya University) The 1 st TAN integration workshop Mar10, 2006.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
The performance of LHCf calorimeter was tested at CERN SPS in For electron of GeV, the energy resolution is < 5% and the position resolution.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Contents of talk May 2 nd 2006 Y. Muraki on behalf of the LHCf 1. Physics goal 2. The BRAN detector 3. The particle distribution inside the BRAN 4. In.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
Detectors installation in the TAN at IR1 and IR5: status and planning A. L. Perrot (TS/LEA-Int) Joint LHC Machine Experiments Workshop on very forward.
CERN, July 7 th, 2010 LHCf status report Oscar Adriani Università degli Studi di Firenze INFN Sezione di Firenze On behalf of the LHCf Collaboration.
H. Matis, M. Placidi, A. Ratti, W. Turner [+ several students including S. Hedges] (LBNL) E. Bravin (CERN), R. Miyamoto (BNL – now at ESSS) H. Matis -
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Transport & Handling of Detectors TAN Workshop S. Prodon –
P. 1K. Eggert – Early TOTEM Running with the  * =90m Optics Karsten Eggert on behalf of the TOTEM Collaboration Politecnico di Bari and Sezione INFN Bari,
Luminosity measurement at LHC (The machine point of view) Enrico Bravin AB/BDI Large part of the material presented here has been produced by the LBNL.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
LHC forward detectors EN/MEF roles & responsibilities MEF group meeting, 24 th November 2010 A. L. Perrot- EN/MEF-LE.
M. Gilchriese LHC Startup Luminosity Planning July 29, 2005.
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
Gas detectors in a ZDC (at LHC) Edwin Norbeck and Yasar Onel University of Iowa For7 th CMS Heavy-Ion meeting at Delphi June 2003.
Radiation Protection: How (radio)active are we going to be? S. Roesler (on behalf of DGS-RP) Chamonix 2011 LHC Performance Workshop January 24-28, 2011.
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
LHCf collaboration meeting, Nagoya, January 2009A. L. Perrot LHC news A. L. Perrot CERN, EN/MEF-LE LHCf collaboration meeting, Catania, 6 th July 2009.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Joint LHC Machine-Experiments Workshop on Very Forward Detectors Summary D. Macina (CERN) Joint LHC Machine-Experiment Worshop on the Luminosity Monitoring.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
LHCf: Integration and compatibility with the luminosity monitor
Luminosity monitor and LHC operation
S. Roesler (on behalf of DGS-RP)
TAXS and TAXN ABSORBERS - OVERVIEW
Impact of running with LHCf and early Totem 90 m optics
The ATLAS Zero Degree Calorimeter Brookhaven National Laboratory, USA
MPI-ATL Calor Meeting 7-Sep-2009 H. Oberlack MPI für Physik, Munich
LHC schedule.
Radiation Protection Issues After 20 Years of LHC Operation
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Short review of physics topics and detector design Status.
Machine-Experiment Interface
Machine Coordinators: G. Arduini, J. Wenninger
Emmanuel Tsesmelis TS/LEA 26 January 2007
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Accelerator and Experiment Interface Session: LS2, LS3
Review of the MQW and MBW lifetime taking into account results from the reading of the dosimeters collecting data in the 2016 RUN Dosimeter (installation,
Follow-up of HL-LHC Annual meeting
Present coverage Possible upgrade projects Slogan: Q C D HERA for LHC
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
Machine plans - Alignment workshop
Beam-Induced Energy Deposition Studies in IR Magnets
Equipment of experiments directly interfering with the beam operation
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Luminosity measurement at LHC (The machine point of view)
Overall commissioning strategy for protons (estd. 2005)
LHC Beam Operations Past, Present and Future
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Monday 152 bunch operation summary
Presentation transcript:

Installation, storage and removal of the TAN detectors during the LHC operation A.-L. Perrot, TS/LEA-int LEMIC A.L. Perrot – TS/LEA/int LEMIC 20/03/2007

Installation – e.g. LHCf on 15 January 2007 Holding of the detector towards the TAN slot Insertion inside the slot ( guide lines) Insertion inside the slot Removal of the threaded rod A.-L. Perrot, TS/LEA-int LEMIC

Installation – e.g. BRAN housing on 22 January 2007 Holding of the detector towards the TAN slot Removal of the threaded rod Insertion inside the slot A.-L. Perrot, TS/LEA-int LEMIC

Comments of Radioprotection team - SC/RP agreed use of forklift for start-up installation and low luminosity run (L<1030 cm-2 s-1) - for higher doses rates => - study to optimise the intervention - remote procedure study Contact with TS/IC/IS (K.Kershaw) in charge of the remote handling for the LHC element 120 A.-L. Perrot, TS/LEA-int LEMIC

Installation of the detectors - run scenario Point 1 LHCf : Phase-1: Parasitic running during LHC commissioning at L< 1030 cm-2 s-1 (radiation hardness => LHCf removed when L=1030 cm-2 s-1) Phase 2: Parasitic running with TOTEM (L=10 28 cm-2 s-1) (radiation hardness => LHCf removed at the end of the run) BRAN: Installation before LHC closure - run during all LHC lifetime ATLAS ZDC: Low L pp runs (“removed for pp run at L>1033 cm-2 s-1 “) + heavy ions runs Point 5 CMS ZDC: Low L pp runs (1033 cm-2 s-1) + heavy ions runs LHCf, ATLAS ZDC, CMS ZDC => installs./removals during LHC runs BRAN= always in the TANs A.-L. Perrot, TS/LEA-int LEMIC

Parameter evolution and rates All values for nominal emittance, 7TeV and 10m * in points 2 and 8 Parameters Beam levels Rates in 1 and 5 Rates in 2 (and 8) kb N * 1,5 (m) Ibeam proton Ebeam (MJ) Luminosity (cm-2s-1) Events/ crossing 43 4 1010 11 1.7 1012 2 1.1 1030 << 1 1.2 1030 0.15 6.1 1030 0.76 156 6.2 1012 7 2.2 1031 4.4 1030 9 1010 1.4 1013 16 1.1 1032 3.9 0.77 936 3.7 1013 42 2.4 1031 2.6 1031 1.3 1032 0.73 6 1010 5.6 1013 63 2.9 1032 1.6 6.0 1031 0.34 1 8.4 1013 94 1.2 1033 2808 1.1 1014 126 7.2 1031 7.9 1031 3.8 1032 0.72 5 1010 1.4 1014 157 1.1 1033 2.1 1.2 1032 0.24 0.55 1.9 1033 3.6 A.-L. Perrot, TS/LEA-int LEMIC R. Bailey talk at the ‘joint LHC Machine – Experiments workshop on very forward detectors’, CERN, 25/01/2007

LHC run scenarios considered in our studies (conservative scenarios from the point of view of the radiation environment) First year (scenario 1) Lpeak=2.9x1032 cm-2 s-1 (b*=2m, 75ns operation, Np/bunch=6x1010); 133 days of collisions e for physics =40% (LEP data) If everything is going well: 25 ns operation, b*=1m and Np/bunch=5x1010 => Lmax = 1.1x1033 cm-2 s-1 at the end of the run 2nd year (scenario 2) Lpeak=1.9x1033 cm-2 s-1 ( (b*=0.55m, 25ns operation, Np/bunch=5x1010); 160 days of collisions e for physics =40% After the collimators phase II and the completion of the dump syst. (scenario 3) Lpeak= Lnominal= 1034 cm-2 s-1 => 53 days of physics => 64 days of physics => 64 days of physics A.-L. Perrot, TS/LEA-int LEMIC

Detectors removal/insertion from the TAN - Radiation hardness: ATLAS and CMS : confirmation that ZDCs can stand the 2nd year scenario for pp and HI =>ZDCs not removed until we switch to scenario 3 - Bake-out: for all detectors removal / storage underground? - LHC machine at nominal conditions: At ~ L=1033 cm-2 s-1, removal of ZDCs => Cu bars in for runs at L≥1033 cm-2 s-1 Heavy ions runs: ZDCs inserted inside TAN => removal of Cu bars - Obviously: if any problem happens with the ZDC it will have to be removed. A.-L. Perrot, TS/LEA-int LEMIC

Radiation environment - Detectors average residual dose vs time Averaged over tungsten LHCf Simulations by N. Mokhov 100days 100days ZDC L=1030 cm-2 s-1 L=1033 cm-2 s-1 mSv/h mSv/h!! A.-L. Perrot, TS/LEA-int LEMIC

Radiation environment at the TAN during LHC runs Averaged over copper bars mSv/h!! 100 days 30 days A.-L. Perrot, TS/LEA-int LEMIC

Installation foreseen with CERN forklift Point 1 (RI132-RI171) - Access by Pt1: Shielding between UJ13-UJ14, and between UJ16-UJ17 => forklift too large to pass - Access by Pt 2 and Pt8: =>Travel underground until TANS (study by O. Choisnet TS/MME) Courtesy of O. Choisnet (TS/MME) Pt5 (UJ53 –R571) - Access by Pt5: only a ‘normal persons’ lift => forklift too large to pass - Access by Pt4 and Pt6: =>Travel underground until TANS Forklift Detectors: via PMs? A.-L. Perrot, TS/LEA-int LEMIC

Summary and open issues - ZDCs & Cu bars need to be installed and removed - Dose rates according to operational scenarios : up to mSv/h => remote handling needed to reduce the dose to the personnel. Logistic: - installation foreseen with a forklift (at Pt1 lowering via pit =possible; at Pt5 not such a possibility) - long travel along cold machine and in radioactive environment - storage of detectors / Cu bars underground (where, how long time)? - possible storage of dedicated forklift in UJs/ access with detectors by Pt1 &5? A.-L. Perrot, TS/LEA-int LEMIC