Machine-Experiment Interface

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

Simulation priorities for 2015 R. Bruce for task 5.2.
24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Requirements from the experiments D. Macina (EN/MEF) Conceptual Design Review LHC Phase II Collimation, CERN April Many thanks for input and discussion.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
Background Simulations for the LHCb Beam Condition Monitor Overview: ● The LHCb Beam Condition Monitor (BCM) – Purpose, Design and Function – Implementation.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
LHC Interaction Region Upgrades and the Machine- Experiment Interface Emmanuel Tsesmelis CERN TS/LEA CARE-HHH-APD Mini-Workshop IR'07 Frascati 8 November.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
Backgrounds at FP420 Henri Kowalski DESY 18 th of May 2006.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
ENERGY DEPOSITION AND TAS DIAMETER
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
Operating IP8 at high luminosity in the HL-LHC era
S. Roesler (on behalf of DGS-RP)
TAXS and TAXN ABSORBERS - OVERVIEW
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Impact of running with LHCf and early Totem 90 m optics
ATLAS-MUON Trigger hardware developments
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
A.-L. Perrot, TS/LEA-int LEMIC A.L. Perrot – TS/LEA/int LEMIC
Workshop format and scope Expected write-up's Follow-up actions
Components for the Machine-Interface Regions
LHC Experimental Vacuum Systems Status October ‘07
Long Shutdown for the LHC: Vacuum Beam Pipes
Vacuum chamber for the CMS forward region
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Progress with Experimental Vacuum Chambers
Accelerator and Experiment Interface Session: LS2, LS3
Follow-up of HL-LHC Annual meeting
Upgrade Strategy for the Experimental Vacuum Systems
CLIC-ILC BDS & MDI work.
Upgrade phase 1: Energy deposition in the triplet
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Interaction Region Design Options e+e- Factories Workshop
Wednesday Summary of Working Group I
SLHC Non-Inner Detector Upgrades
Collimation margins and *
HL-LHC operations with LHCb at high luminosity
Beam Loss Simulations LHC
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
Large emittance scenario for the Phase II Upgrade of the LHC
Presentation transcript:

Machine-Experiment Interface Emmanuel Tsesmelis / CERN CARE-HHH-Workshop 24 November 2008

Contents LHC Experiments – Requirements Experimental Vacuum System Collimation System Schedule and Final Remarks Conclusions

The LHC Experiments

ATLAS Spare Beam Pipe The ATLAS B-Layer Task Force review realised that the ATLAS beam pipe cannot be replaced in a reasonable time. For example, in event of accident that would spoil the LHC vacuum. ATLAS proposes to make a new spare beam pipe which can be inserted without removing the Pixel. Would include Be for the central pipe and SS elsewhere. This should be pursued as a matter of urgency.

ATLAS Beam Pipe Intermediate step from SS to Al

Machine Elements in ATLAS D0a near ID and inside calorimeter. D0b just behind calorimeter. Best performance with both, but D0b alone is significant help. Q0 and TAS in JT/JF shielding.

Machine Elements in ATLAS D0a 50% background increase in the Inner Detector. Destroys forward calorimetry measurement. D0b Raises Muon System background by ~30% for the 300 evt/BC scenario. Could be acceptable, although many engineering issues to be resolved. Q0 and TAS Gives a significant increase of background in Muon System as the TAS has moved outside the heavy JF shielding into the toroid shielding JT See https://edms.cern.ch/document/932316

ATLAS Insertable B-Layer (IBL)

CMS - Detector The Tracker would need to be replaced

CMS – Minimum Bias Events

ALICE - Requirements

ALICE - Requirements ALICE will run at least a few weeks low-luminosity pp every year (before heavy ion runs) Other LHC upgrades would need to allow for this. ALICE is considering a possible heavy-ion luminosity upgrade To be discussed after the first heavy-ion run.

LHCb - Requirements Running Conditions LHC Baseline – run at 2 – 5 x 1032 cm-2s-1 Integrated luminosity 9 fb-1 Limitation is hadron triggger Phase-I – run at 10 x 1032 cm-2s-1 Integrated luminosity 25 fb-1 Limitation is tracking efficiency (radiation) Phase-II – run at 50 x 1032 cm-2s-1 Integrated luminosity 110 fb-1 Limitation is probably upgraded tracking

LHCb - Requirements Phase-I and Phase-II luminosity limits due to number of pp interactions per crossing. Limited to a few interactions per bunch crossing by trigger and tracking. Therefore, LHCb want as many crossings/sec. (25 ns.) as possible. Doubling the bunch spacing (50 ns) will half the integrated luminosity. Additional requests Luminosity leveling for high luminosities (10 x 1032 cm-2s-1) Longer luminous region

Experiment Vacuum System (© Ray Veness)

Consolidation ATLAS: Replace stainless steel chambers VA (& VT) and bellows with aluminium for background and ALARA reasons, prepare spare central Be beam pipe. LHCb: Replace defective UX85/3 Be chamber, optimise UX85/2 supports, replace stainless steel bellows with aluminium. CMS: Re-evaluate forward vacuum chamber supports and gas injection system operation for magnetic fields.

Upgrade Phase-1 Upgrade: New forward chambers in ATLAS and CMS, new TAS and/or TAS chambers, new VAX region (TAS-Q1). ATLAS: New Insertable B-Layer, Tracker upgrade (Be) beam pipe. CMS: Tracker upgrade (Be) beam pipe. New materials and manufacturing methods for transparent chambers. FP420-type forward physics moving beam pipes. LHC Phase–2 Upgrade concepts.

Apertures LHC Upgrade Beam Pipes History ATLAS requested a smaller beam pipe diameter in Z ±3.5m for B-layer and PIXEL upgrades. Presentation to ATLAS Tracker Upgrade Workshop in 2006 based on aperture requirement at injection (which was the limit for the current beam pipe radius). A number of open questions remained to be answered (e.g., future optics and collimation) with final value expected some time after machine start-up. Information required from ATLAS and CMS Formal statement needed on range of β* in IRs 1 and 5 required for physics TOTEM or other high β* optics required after LHC Phase-1 Upgrade? Latest information on structural stability of experiment caverns. Next steps Calculate baseline aperture of beam pipe in cavern, taking into account new information on triplet and collimation. Make detailed simulations based on beam loss, background and machine protection before agreeing final value.

Collimation System (© R. Assmann)

Collimation System Phase-1 graphite collimators have large contribution to machine impedance. Phase-2 Additional Cu scrapers & collimators. Overall smaller impedance & 10x better cleaning. Phase-2 Collimators remain unchanged for LHC Triplet Upgrade.

Prediction of Beam-1 (H) Halo Losses IR Phase I (Perfect) Phase I (Imperfect) Phase II IR1 4.9 × 10-4 1.0 × 10-3 7.7 × 10-6 IR2 1.3 × 10-4 2.1 × 10-4 2.2 × 10-6 IR5 6.5 × 10-6 5.7 × 10-5 2.9 × 10-6 IR8 3.0 × 10-4 7.5 × 10-4 5.6 × 10-5 Numbers show fraction of overall loss that is intercepted at horizontal tertiary collimators in the various insertions (collimation halo load). Phase-2 collimation upgrade reduces losses in IRs by a factor up to 60! Beam-2 has opposite direction  more losses in IR5 and less in IR1!

Consequences of Phase-1 Triplet Upgrade After the Phase-1 Triplet Upgrade we will have the same tertiary collimation. Losses can still be very different: Combination of collimation halo (collimation settings), optics and detailed aperture variation. Loss studies and background studies must be redone (collimators can be opened, potential losses before D2 or at TAN, more passing through Triplet, change of loss distribution between experiments, …).

Required Beam Loss Studies for Phase-1 Triplet Upgrade Detailed loss studies must be performed in order to qualify the performance of any new insertion layout. Important workload, but we know about HERA problems with beam losses and background after the IR upgrade. For example, procedure for experimental beam pipe: Phase-1 Triplet Upgrade: Define study optics and aperture model for Phase-1 Triplet Upgrade. Experiments: Define required range of b* for each IR after upgrade (need for high b* optics?); Propose baseline for experimental beam pipe. Machine: Determine maximum beam size (optics), required normalized gap (collimation) and required machine margins (optics, beam-beam, …). This gives minimum acceptable beam pipe aperture. Machine & experiments: Qualify beam loss and aperture with new baseline.

Additional Issues Carry out complete simulation Collimation for ions? Proton loss map → shower simulation → experiment background Collimation for ions? Interplay between collimation around experiments (e.g. ALICE – ATLAS)

Schedule & Final Remarks

Schedule

Schedule

Final Remarks Need an agreed and coherent schedule between experiments and machine. Need to find/create optimum forums to discuss LHC Upgrade machine-experiment interface issues. e.g. LEMIC’, LEB’. To cover – schedule, luminosity scenarios, beam structure/conditions, machine elements in the experiments, experiment beam pipes, collimation system.

Final Remarks Although it may still be necessary to consider several options towards the LHC Upgrade, doing so has a cost. 25 ns. is worst case for experiment read-out electronics (L1 latency buffers, shapers). 400 events/bunch crossing is very challenging. Requires higher detector granularity. Luminosity leveling remains very attractive. The experiments are designing for the worst case, even if the above combination is not proposed.

Conclusions Interchange between machine and experiments is advancing the LHC Upgrade and must continue. Strengthening of the forums to discuss machine-experiment interface issues for the LHC Upgrade is needed as a matter of urgency. Timescales for the submission of the respective Letters of Intent, Technical Proposals and Technical Design Reports of the experiments is being determined.