STOP CARD, an Operational Tool to Change Safety Behavior

Slides:



Advertisements
Similar presentations
Behavior Based Safety The following slides provide an example of a (basic) Behavior Based HSE Observation Program Note: the Safety Plus card used as an.
Advertisements

The Role of the Regulator Session 5 Presentation 2.
MOL GROUP CONTRACTOR HSE MANAGEMENT New Elements of Contractor Safety BÉLA CSEH – MOL Group HSE Director Supplier Forum - Budapest, 14 th November 2007.
Guidance and Discipline for Infants and Toddlers November 10, 2011.
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Risk Assessment – An Essential Standard
1-2 Training of Process FacilitatorsTraining of Coordinators 4-1.
Designed Exclusively for the NCASFAA Fall Conference November, 2007 Presented by Terry D. Everson Senior Vice President of Training & Sales Making Meetings.
Learning Objectives 2 2 Explain the role of the senior executive in addressing technical and adaptive work Identify characteristics to search for when.
WEEKLY SAFETY MEETING July 8th, IRI 600 OGEC rig JOBI-3
Welcome to the SEED Facilitator Workshop Tyumen, Siberia, Russia October 7-8, 2006 Tom Lough and Svetlana Belova.
Click to edit Master title style Click to edit Master text styles Second level TOOLBOX TALK MANAGING AIRSIDE SAFETY.
WEEKLY SAFETY MEETING September 02nd, OGEC RIG RR 600 JOBI-4
WEEKLY SAFETY MEETING July 15th, IRI 750 OGEC rig N’Giri - 3
OSHA Safety and Health Program Management Guidelines
Health & Safety Management “and a few other things for your consideration”
PotashCorp.com Fall Safety Reset Aurora Focusing on a Strong 2015 Finish October 2015.
Trainer Contact Information Wes Horton, CET, STS – – –
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Reflective Learning An Overview.
HSE Leadership On The Front Line
Incident Reporting What is an Incident? Should I report Incidents?
STOP CARD, Step up, step in for everyone’s safety
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Simplification – What does it mean?
TRAINING YOUR EMPLOYEES FOR SUCCESS
January 2009 Update Site Waste Management Plans
Safety Accountabilities
Project Management.
Corporate program to build Safety culture
Overview – Guide to Developing Safety Improvement Plan
Safety at work TOTAL'S GOLDEN RULES.
Reflective Learning.
#GoldenRules THEME-BASED CAMPAIGNS to ensure lasting awareness of the Golden Rules Accompanying deployment - July 2017.
#Goldenrules THEME-BASED CAMPAIGNS to ensure lasting awareness of the Golden Rules Accompanying deployment – February 2018.
#GoldenRules THEME-BASED CAMPAIGNS to ensure lasting awareness of the Golden Rules Accompanying deployment - July 2017.
Reflective Learning.
Behavior-based Safety (BBS)
Safety+ A tool to support the recognition of significant actions for safety DG/PSR/HSE.
Lesson 6: Evaluating Performance
Overview – Guide to Developing Safety Improvement Plan
TRAINING YOUR EMPLOYEES FOR SUCCESS
Safety training for new recruits
Safety training for new recruits
New Employee Orientation
#SafeDriver ROAD SAFETY, A MAJOR PRIORITY FOR TOTAL “I don't drive under the influence of alcohol and take regular breaks” Awareness Meetings,
Safety training for new recruits
STFC Safety, Health and Environment (SHE) Codes
STFC Safety, Health and Environment (SHE) Codes
Reflective Learning.
Incident Reporting What is an Incident? Should I report Incidents?
Roadmap to COR.
STFC Safety, Health and Environment (SHE) Codes
Behaviour Based Safety (BBS): Increasing safety awareness,
Incident Reporting What is an Incident? Should I report Incidents?
Safety Hour Discussion Pack
Safety Hour Discussion Pack
Shell Appalachia Core Contractor Meeting
Topic Leader Training 2012.
CLICK TO SHOW ANIMATION
12 Safe Maintenance Rules
CLICK TO SHOW ANIMATION
CLICK TO SHOW ANIMATION
CLICK TO SHOW ANIMATION
Behavior-based Safety (BBS)
The Role of the Regulator
Project Management Essentials
Safety Hour Discussion Pack
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

STOP CARD, an Operational Tool to Change Safety Behavior Summary Presentation, September 2015

WHY INTRODUCE THE STOP CARD? Give everyone the means to intervene and encourage people to do so, to improve safety. Change safety behavior by encouraging everyone to step in while operations are in progress, heightening shared vigilance. Take a participatory approach to identify situations in which the rules are not being followed. Highlight the important role of managers in recognizing and resolving problems raised. Make it easier for the originator and contractors to address safety issues together. Step Up, Step In 2012 | "Step up, step in!": theme of the World Day for Safety 2013 | Group-wide tagline, Total Commitment, followed by the promise of “Safety For Me, For You, For All" 2015 | Stop Card, a tool that lets everyone get involved Stop Card 2015 – Summary Presentation (Practical Information Sheet 3)

WHAT IS THE STOP CARD? The Stop Card is a tool that gives all Total and contractor employees the authority to step in and stop ongoing work if they feel that an action or situation is unsafe or could lead to an accident. There will be no sanctions for users, either by Total or contractor managers, even in the event of incorrect use. The program involves a physical card signed by the unit's manager and cosigned by the contractor's local managers for their employees Stop Card 2015 – Summary Presentation (Practical Information Sheet 3)

SUCCESS FACTORS Five key success factors identified based on operational experience and internal and external benchmarking, including input from contractors Manager involvement, engagement and personal example, to legitimize the program. Involving operational managers, who: - Encourage people to report situations in which the rules are not being followed. - Support efforts to resolve the situation through a participatory process. Involving contractor managers in the program as soon as it is deployed. Providing employees with simple, positive, practical information. Integrating the Stop Card into existing processes and showcasing and applauding its use. Stop Card 2015 – Summary Presentation (Practical Information Sheet 3)

HOW DOES THE STOP CARD WORK? Simplified process and role of the various people involved All employees Identify the hazard and alert management. Stop the work or step in so that others do so. Participate in analyzing the perceived risks. Help resolve the problem. Operational managers Coordinate the problem's resolution. Make changes to work procedures as needed. Unit managers Make sure no sanctions are applied. Make the definitive call if the problem could not be resolved. Set up a system to log Stop Card use. Stop Card 2015 – Summary Presentation (Practical Information Sheet 3)

KEYS TO SUCCESSFUL DEPLOYMENT Cascading deployment of the program by managers, carried out jointly with contractors. Proves their commitment to safety and legitimizes the system. Drives the process and encourages Stop Card use. Demonstrates a joint initiative with contractors. Buy-in by local Total and contractor managers. Encouragement to intervene with or without a Stop Card: A local recognition system. A clear understanding that there are no sanctions for using the card. HSE support. Stop Card 2015 – Summary Presentation (Practical Information Sheet 3)

WHEN AND HOW TO DEPLOY THE STOP CARD PROGRAM – 1/2 Prepare deployment for a launch in mid-November 2015 Main Steps Prepare deployment in liaison with contractor managers Integrate Stop Cards into existing processes Educate and train Total and contractor middle managers Educate and train all Total and contractor employees September - October Starting in mid-September November Starting in mid-November Prepare deployment Launch and monitor Stop Card 2015 – Summary Presentation (Practical Information Sheet 3)

WHEN AND HOW TO DEPLOY THE STOP CARD PROGRAM – 2/2 Materials to support and help with the launch A card featuring the same design for everyone, both contractor and Total personnel, adapted and produced locally. A deployment kit*, tested by a panel of sites and affiliates during the design phase, including: Talking points for deploying and integrating the Stop Card into existing processes. A booklet and practical information sheets describing the program and everyone's role. Video tutorials for meetings and training sessions: Illustrating the Stop Card's use in five work situations: simultaneous operations, lifting, work at height, excavation work and traffic in a parking lot. Materials for facilitators of meetings and training sessions. * Cascading deployment: around one hour of meeting/training time per Total or contractor employee. Stop Card 2015 – Summary Presentation (Practical Information Sheet 3)