EVLA Basic Operations Jim Ulvestad

Slides:



Advertisements
Similar presentations
WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Advertisements

National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
School of something FACULTY OF OTHER School of Physics & Astronomy FACULTY OF MATHEMATICS & PHYSICAL SCIENCES The Cornish Survey Workshop.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers & Jim Ulvestad NRAO 15 Oct 2009 USSKA Consortium Meeting.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Rick PerleyEVLA Phase II Definition Meeting Aug 23 – 25, The Expanded Very Large Array Phase II Baseline Plan and Constraints.
Jim Ulvestad Division Director, AST May 6, 2011 Division of Astronomical Sciences.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
Page 1 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Operating the Observatories Mark Coles.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers NRAO 14 May 2009 USSKA Consortium Meeting Washington,
Imaging issues Full beam, full bandwidth, full Stokes noise limited imaging Algorithmic Requirements: –PB corrections: Rotation, Freq. & Poln. dependence,
EVLA Spectral-Line Science Below 1200 MHz
S. Likhachev (1), L, Kogan(2), E. Fomalont(2), F. Owen(2)
EVLA Availability - or - When Can I Use It?
Computing Architecture
S. Bhatnagar: ASTRON, Dwingeloo, June 29th 2010
EVLA Project Peter Napier
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
Committee Charge Fred K.Y. Lo
Information Technology
EVLA Computing Software Overview.
Budget, Schedule, Contingency
Atacama Large Millimeter Array
Software Requirements
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
EVLA Advisory Committee Meeting
VLA to EVLA Transition Plan
Some Illustrative Use Cases
EVLA Advisory Committee Meeting
Science Commissioning
Software Requirements
Software Requirements
Shared Risk Science with the EVLA
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
Joint Finance Committee/ Council May 21, 2018
Mark McKinnon EVLA Project Manager
EVLA Advisory Committee Meeting, March 19-20, 2009
Observatory Science Operations
EVLA Operations Jim Ulvestad
Observatory Science Operations
Correlator Growth Path
EVLA Construction Status
VLA EXPANSION PROJECT Correlator Issues.
EVLA Advisory Panel Mtg. System Overview
Rick Perley NRAO - Socorro
Presentation transcript:

EVLA Basic Operations Jim Ulvestad Operations Concept Staffing and Cost Plans

EVLA Operations Concept Enhanced data delivery and science support desired for all astronomers, but depends on available funding See following Chandler talk on Array Science Center Day-to-day infrastructure maintenance relatively unchanged Robust maintenance of aging infrastructure (buildings, antennas, railroad) is required Economies of scale by sharing personnel with VLBA and possibly with ALMA Detailed staffing requirements in EVLA/VLBA Ops Plan, Version 5 Compared to 2000, staffing shifts from maintenance to science support SAGE meeting, May 22-23, 2007

Routine Operations Requirements Operate both EVLA and VLBA, with associated gains in cost efficiency Maintain EVLA capability until 2030 Retain all 7 configurations (A,B,C,D + hybrids) 95% reliability in scheduled antenna-hours 70% of hours in year for peer-reviewed science 1-50 GHz and 327 MHz bands available year-round Primary dynamic scheduling, with fixed observations also possible Array Science Center requirements/drivers in Chandler talk SAGE meeting, May 22-23, 2007

Annual Ops/Infrastructure Costs Function Cost (2005) Cost (2012) M&S, Facilities, Travel $3.2M $3.9M EVLA Power $0.6M $1.6M AOC Power $0.3M $0.5M VLBA Power $0.4M $0.7M Added VLA-AOC Bandwidth $0.0M $0.1M TOTAL $4.5M $6.8M All costs in dollars of year (FY05$ for 2005, FY12$ for 2012 costs) Assumes 3.5% inflation per year Additional power requirements of EVLA (WIDAR, cryogenics) 7% annual cost increase per kilowatt-hr FY05 cost included pro-rated share of long-term infrastructure augmentations SAGE meeting, May 22-23, 2007

Operations Personnel Requirements--FTEs Division 2000 2007 2008 2009 2010 2011 2012 Assistant Director’s Office 5 3 4 Business Services 9.5 10 Array Operations 26 22 21 20 19 Electronics 73 64 66 68 69 Engineering Services 52 42 43 44 Computing Infrastructure Ops S/W (EVLA Comp) 9 11 15 16 18 ASC (core/full) 29 27+1 31/33 33/35 35/44 39/62 TOTAL (core/full ASC) 213 188.5 195/ 197 201/ 203 207/ 216 212/ 235 213/ 236 2012 needs, including Core ASC, equal to 2000 Personnel shift from maintenance to science support No guarantee of funding to support this plan SAGE meeting, May 22-23, 2007