UPDATES on INSIDE MECHANICS

Slides:



Advertisements
Similar presentations
Engineered Isostatic Ceramics
Advertisements

CALICE - European DHCAL meeting Ciemat Mechanical Workshop and test of the Stainless steel plate machining for the CALICE-HCAL. Enrique Calvo Alamillo.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
SALES ORDER MANAGEMENT SYSTEM. According to the current global status, companies can't waste time sourcing suppliers or waiting for information on the.
INSIDE 15/ MECHANICS UPDATES CHARIOT - NEW DESIGN COOLING PET DETECTOR G. GIRAUDOTORINO 15/
1 Alan Bross MUTAC April 9, 2008 Lithium Hydride Absorber Program A. Bross for C. M. Lei.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
ICARUS Cold Vessels Thermal insulation Project progress report.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
THE VACUUM BOX FOR COMPASS CRYOSTAT MUNICH 23/10/2007 G. GIRAUDO I.N.F.N. TORINO 1.MECHANICS – OVERWIEV 2.WINDOWS 3.INTEGRATION WITH HODOSCOPE.
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Lithium Hydride Absorber Program Update Alan Bross.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax : PANDA.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
First Wall Panel - Overview
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
LCWS11 WG4 Fully featured accelerating structure engineering design
Profiler Mechanics Update
ATLAS Internal ID Service Integration
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
A PRELIMINARY THERMAL STUDY FOR L3 CGEM BOARD
Status of GASPARD mechanics
MECHANICAL FRAME OF THE MVD
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
FEE COOLING UPDATE CGEM Workshop - IHEP - June 13th 2017
Claudia Cecchi University of Perugia and INFN
Status of material tests
Impact of TIDVG problem on LSS5 dump design schedule
Flexible lines production and planning
Mauro Savrie' INFN Ferrara
Mini-drawers, FE-ASIC , Integrator
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Far Detector Activities Late 2017 – Early 2018
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Update on Junction Box Design
- chambers & absorbers -
Prototype cryomodule development
LARP Phase II Secondary Collimator RC-0 and RC-1
NPS mechanical design 01/31/2019 Jlab meeting
Teleconference ACS – FREIA 19th June 2017
WA105: Order Status IFAE Thorsten Lux.
UPPSALA UNIVERSITY_GERSEMI PROJECT
East Hall under construction
Presentation transcript:

UPDATES on INSIDE MECHANICS All design of mechanical parts of Inside are defined and frozen. Construction of mechanical parts started (Torino INFN workshop) Cooling panel  ready Chariot and shoulder  need external workshop (welded parts). Waiting for quotation. Heads  in progress Delivery of some commercial parts delayed due to the new invoicing method. Purchase of other commercial parts needs new market recognition. Regular suppliers reject the new invoicing method. B. Giraudo INFN torino

Disegno Globale Estensione corsa max ±400 mm Dimensione longitudinale Testa +5 mm Taglio sulla base G. Giraudo Roma 18/12/2014

Disegno Globale Posizionamento Profiler Minima Distanza tra le Teste G. Giraudo Roma 18/12/2014

Thermal heat exchanger Aluminium casting with stainless steel tube embedded. Pre-machining view. RX of the thermal heat exchanger. Survey of tube position.

Disegno Impianto di Raffreddamento G. Giraudo Roma 18/12/2014

In/Out manifolds Cooling panel parts ready Flowmeter Support panel Fittings and chiller delivery  end of June Polyurethane tubes delivery delayed (?) Ring-nut for tube transition

Profiler 6 X-Y fiber planes + 2 spares ready calorimeter structure almost ready waiting for electronics to finalize cooling system design (beginning July) 210x210x0,3 mm3 foil to be inserted here crystal fixation system thanks to MARCO MAGI

Profiler 0,25 mm phosphor bronze foil inserted calorimeter matrix assembly; multianode PMT will be pressed against it