LSST Commissioning Kevin Reil LSST Commissioning Camera Rep

Slides:



Advertisements
Similar presentations
Plans for LSE-130 through CD-2 Gregory Dubois-Felsmann SLAC National Accelerator Laboratory.
Advertisements

CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
1 Aurélien Barrau LPSC-Grenoble (CNRS / UJF) A few words on the LPSC The LPSC in few words: The scientific environment : Grenoble 4 Universities.
Integration and Test 14 October 2008 Martin Nordby.
LSST Camera Performance and Safety Assurance Plan and Safety Overview Joe Kenny Camera Safety Manager LSST Safety Council Review 18 August 2015.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Telescope Integration and Tests Tuesday Afternoon.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
The Active Optics System S. Thomas and the AO team.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
Documenting Camera Base Facility Needs P Hascall.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
LSST SLAC Office of Communications August 8, 2016 Communications Roadmap.
GLAST Large Area Telescope:
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Status Update & Overview Charles (Chuck) Claver LSST System Scientist SAC Meeting March 5, 2017.
LSST External Communications Suzanne Jacoby, Andrew Gordon Communications Leads at LSST and SLAC August 17,
Resource Loaded Schedule and Budget Profile
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Refrigeration System Status and Plans
Jim Fast Pacific Northwest National Laboratory
Camera Maintenance and Access
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Refrigeration System Status and Plans
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
ComCam Interfaces Travis Lange ComCam TDR May 10, 2017
Systems Engineering, Verification, and Commissioning for LSST George Z
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning: FY18 Planning
ComCam Utilities Travis Lange Scott Newbry Camera I&T Mar. 6, 2017
Alistair Walker Version 3 December
Integration & Commissioning
Prime Focus Imaging Spectrograph Status
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
DECam Filter/Shutter Installation and Filters Installation
Chuck F Claver LSST System Scientist & Commissioning Lead
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
Proton Source and LEBT Luigi Celona & Lorenzo Neri
GLAST Large Area Telescope:
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Management Breakout: DOE Budget Summary Vincent Riot LSST Camera Interim Project Manager LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
LSST Control Software Integration Francisco Delgado OCS Software Manager LSST Commissioning Plan Review January 24-26, 2017.
Software & Hardware for Wavefront Estimation Pipeline Development Te-Wei Tsai Software Engineer Joint Technical Meeting March 6, 2017.
Launch and On-orbit Checkout
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Overview of Science Verification Plan Keith Bechtol and Zeljko Ivezic LSST Commissioning Plan Review January 24-26, 2017.
GLAST Large Area Telescope
Integration and Test Organization Chart
Introduction and Overview
PSS verification and validation
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Question 1: Contingency for “extra” year
Commissioning Data – Who and Why?
Presentation transcript:

LSST Commissioning Kevin Reil LSST Commissioning Camera Rep LSST Commissioning Kevin Reil LSST Commissioning Camera Rep. August 15, 2016

LSST Commissioning: Camera Commissioning Planning Time Frame Camera Team Input Initial Plans Logistics Discussion

LSST Commissioning: Camera Time Frame

Commissioning Planning Time Frame: Camera Camera commissioning scope estimate - non-MIE (2*) Camera shipping plan (1) Camera on summit re-verification plan (2) Camera summit facility build-out plan (2) Detail tests with ComCam for Early System AI&T (same 2) Detail Science Camera tests for Full System AI&T (3) Non-MIE Camera supplied hardware design, costing and BOEs (10 in parallel with above) This is list from Chuck with number of weeks allotted to get it done in parenthesis

Commissioning Planning Time Frame: Camera Camera commissioning scope estimate - non-MIE (2*) Camera shipping plan (1) Camera on summit re-verification plan (2) Camera summit facility build-out plan (2) Detail tests with ComCam for Early System AI&T (same 2) Detail Science Camera tests for Full System AI&T (3) Non-MIE Camera supplied hardware design, costing and BOEs (10 in parallel with above) Bold is fairly well covered in I&T scope (but full team feedback needed) Regular is maybe covered at some level by I&T and SE Faint is covered no where in MIE as far as I can tell.

LSST Commissioning: Camera Team

3.01 3.02 3.08 LSST Camera 3.06.05 Utility Trunk 3.04.02 Corner Raft Tower 3.04.01 Science Raft Tower 3.03 Sensors 3.01 3.02 3.08 3.07.02 Aux Electronics 3.06.04 Cryostat 3.05.04 L3 Lens Assembly 3.06.01 Camera Body 3.05.02 Filters (6) I show this quickly to remind people we are a big team and I need input from everyone. (I’ve started collecting info but have a lot more to do). 3.06.03 Filter Exchange System 3.06.02 Shutter 3.07.02 DAQ 3.05.03 L1-L2 Lens Assembly 3.07.01 Camera Control System

I&T -> Commissioning I&T planning summarized: LCA-40 Integration and Test Plan LCA-283 Camera Verification Test Plan LCA-10148 Survey and Alignment Plan Documentation eTraveler summaries, NCRs, as built docs, etc Characteristics Data Delivered with the Camera Information delivered to Data Management Iterated several times and under change control, LSE-130 Details of vendor test data will be added as they are determined Includes: As-built position information from I&T FEA distortion models Sensor and optics characteristics (from test plans) Filter and lens vendor test results Optical model as-built inputs/updates to support integrated observatory modeling Shutter motion profiles and shadowing model as a function of position measurements Thermal model to interpolate temperature measurements Configuration

Summary of inputs from camera team Camera Management Need to clearly understand colors of money ($$$) and properly manage boundaries. Create BOEs and resource loaded schedule. Camera Systems Engineering While camera fully verified at camera preship review questions will (almost certainly) come up during commissioning What role is needed from camera SE during commissioning? eTraveler transfer of knowledge? NCR handling? Sensors/Science RAFTs Transfer of fixtures from BNL to LSST? Transfer/maintenance of knowledge? On sky sensor data/performance evaluation. Handling colors of money is very important to get right.

Summary of inputs from camera team Corner RAFT* Like SR only digital access at commissioning Wavefront data and guide data! Optics All the filters will be fully characterized by the vendor by direct measurements on the actual optics across the entire aperture. r-filter, at least, also well tested at SLAC. Float indicates all filters tested at SLAC but possible summit work needed (CCOB thin beam at summit is currently planned) Optics handling expertise at LLNL needs transfer to camera I&T and commissioning (not just a piece of paper with procedure) L3 integrated at delivery L1/L2 assembly (likely) reintegrated and aligned in Chile

Summary of inputs from camera team Shutter Well tested at I&T prior to delivery Shutter swaps at summit during commissioning? On sky performance input/feedback First shutter refurbish as part of commissioning? Filter exchange* Autochanger swaps at summit during commissioning? On sky/telescope input/feedback First autochanger refurbish as part of commissioning? Cryostat/refrigeration* Pathfinders during ComCam Commissioning systems (2) at summit

Summary of inputs from camera team CCS Pathfinders Need CCS prior to ComCam More than any subsystem (I think) CCS will be asked to add many things not in their original list of requirements. Significant manpower needs during commissioning. Calibration telescope ? DAQ Need DAQ prior to ComCam Calibration telescope? Network issues/boundaries (summit, summit to base, etc)

Summary of verbal inputs from camera team I&T I&T ends with camera ready to ship I&T has scope (3.08.05) to design, build or design/build shipping container for camera But not all the other things that need to ship. Nominal plan has been to reuse the L1/L2 shipping container from Optics/Ball Aerospace and ship rest of camera as one piece Filters back in their shipping containers Commissioning must cover shipping costs All of camera I&T goes to Chile Fixtures and a-frame crane for clean room in I&T budget Alumalift, RAFT level test stands, computers Everything else? (tools, clean room gear, etc) are not.

LSST Commissioning: Camera Time FrameS

Time Frames: Camera Perspective Pathfinders for CCS and DAQ ~2018 ComCam era Early 2019, merge T&S/Cam hardware Mid 2019 to early 2020 – On telescope Refrigeration pathfinders Camera Ready at SLAC Feb. 14, 2020 Camera on summit (camera maintenance area) Spring/Summer 2020 Camera on telescope! Fall/Winter 2020 (Dates approx. from gantt charts) What did I miss? These are mine based on my vision (with a lot of discussion with others)

Time Frames: Camera Perspective Pathfinders for CCS and DAQ Needed before ComCam arrives Discussion Note to discuss more

Time Frames: Camera Perspective ComCam era Add missing scope in LSE-199 Or at least clarification of scope and responsibilities @SLAC I&T scope @ SLAC Union of I&T scope and T&S scope @ SLAC Unified testing @ SLAC Shipping On Summit Testing on floor before going on telescope In mass simulator on telescope Parallel refrigeration pathfinder in mass simulator What did I miss?

Time Frames: Camera Perspective Camera Ready at SLAC Camera I&T done Pre-ship/Acceptance review (3.08.04) Camera into/next to shipping container (3.08.05) Camera project (DOE MIE) done! Ship camera Ship fixtures Ship test stands, tools, etc Transfer verification data, procedures, etc “Commissioning activities involving the Camera begins with shipping from SLAC to Chile and re-verification on the Cerro Pachon summit. Re-verification activities of the Camera will be lead (led) by DOE personnel, but coordinated through the Commissioning team and plan. These activities are currently scheduled to start February 14, 2020 with a Camera Pre-Ship Acceptance review at SLAC.” What did I miss?

LSST Commissioning: Logistics and Existing Plans

9 3? Logistics of shipping I&T fixtures prior to camera indicates that some fixtures arrive with camera thus requiring time to install fixture before reassembling camera.

Receiving the Camera from SLAC Camera Shroud installed as protection for auto changer L1-L2 removed These slides from Joint Technical Meeting: Santa Cruz 2016. Thanks: Travis Lange

Telescope 3rd Floor Camera Staging and Test Area White Room Clean Room Utility Area Walkway Mirror Coating Facility

Equipment Flow Diagram—Receiving the Camera “Camera I&T needs to be repeatable at summit” requirement has required real work already.

Receiving the Camera and Prepping for Install Raft Integration Camera Integration Stand BOT Camera Staging and Test Area Clean Room (class 10,000) White Room (class 100,000)

Time Frames: Camera Perspective Camera on summit (camera staging/test area) Camera on camera integration stand (install that first) Is nominal shipping plan of L1/L2 + rest of camera the right plan? Re-align L1/L2 assembly with camera CCOB thin beam tests Refrigeration at Camera Maintenance area How much throughput testing? Under CCS control here Camera in front end assembly Move to OCS control Pump down/cool down Flat field, darks, etc What did I miss?

Camera Staging and Test Area Camera Integration Stand

Receive Camera from SLAC on Saddle Stand Camera Saddle Stand

Move Camera Into White Room

Camera in White Room (Rotated 180°) Camera in Saddle Stand L1-L2 Support Stand

Bring L1-L2 Container into White Room L1-L2 Shipping Container L1-L2 Support Stand

Prep L1-L2 L1-L2 Shipping Container L1-L2 on Support Stand

Remove L1-L2 Shipping Container

Integrate L1-L2 and Shroud to Camera

Move Camera into Staging Area

Prep Camera for Move to Integration Stand

Camera Testing & Alignment Utilities Needed: Camera Power 380V, 3 phase 44A Integration Stand Power 230V, 3 phase 30A Refrigeration DAQ Fibers Glycol Nitrogen gas Compressed dry air

Prep Hexapod/Rotator Assembly Camera Support Assembly Stand Camera Support Assembly

Integrate Camera on Hexapod/Rotator Assembly Complete Camera Support Assembly ready for integration on telescope

CAD Image of Facility The CAD model of Camera Equipment in the Camera Maintenance Facility is a WIP Camera Saddle Stand Camera Integration Stand

See JTM talk by Travis Lange More plans in place See JTM talk by Travis Lange Cryostat level work on summit support RAFT replacement, for example

Time Frames: Camera Perspective Camera on telescope! Full verification of all systems Mini surveys Data flowing What did I miss?

Camera: Conclusions

Camera Commissioning: Conclusions I have no conclusions, we are just getting started We need your help! Let’s talk!