THEMIS Mission Assurance Mission PDR Ron Jackson University of California – Berkeley (510) 643-2625 rjackson@ssl.berkeley.edu
Status of PAIP UCB At GSFC for approval - TUBS (FGM) At GSFC for approval - CETP (SCM) At GSFC for approval - SWALES (Probe) At GSFC for approval
QA Requirements and Documentation Performance Assurance Implementation Plan (PAIP) THM_pa_001A.doc Version A-2003-Sept 30
Responsibilities of Mission Assurance Flow-Down of PA Requirements - FGM / TUBS - SCM / CETP - Probe / Swales Use of Previously Flown Hardware - Will be subject to PA requirements Comply with EWR127-1 requirements for safety Establish and support spacecraft system safety plan Perform Preliminary Hazard Analysis (PHA) Maintain hazard control verification log - Conduct daily tailgate meeting during I&T - All RED TAG and/or GREEN TAG items shall be removed or added prior to system test - All RED TAG items shall be removed prior to flight - All GREEN TAG items shall be added before Flight Develop safety noncompliance reports as required
Responsibilities of Mission Assurance EEE Parts Requirements - GSFC-311-INST-001 - Parts Derating - Radiation tolerance - Alerts - Parts age control - Parts Control board Materials and Processes Controls - Hazardous materials requirements - Vacuum outgassing requirements - Materials lists
Responsibilities of Mission Assurance Procurement and Subcontractor Controls Receiving Inspection Clean Room Controls Manufacturing and ESD Controls Calibration Controls Personnel Training and Certification to NASA Standards
Quality Standards Manufacturing, Assembly, and Quality Control of Electronic System will be in compliance to the following NASA technical standards: NASA-STD-8739.1 Workmanship Standards for Staking and Conformal Coating of Printed Wiring Boards and Electronic Assemblies NASA-STD-8739.2 Workmanship Standard for Surface Mount Technology NASA-STD-8739.3 Soldered Electrical Connections NASA-STD-8739.4 Crimping, Interconnecting Cables, Harness, and Wiring NASA-STD-8739.7 Electrostatic Discharge Control
Training Instrument Technician Certification Status
Inspections, Tests & Reports In-process Inspection and Test Monitoring During Manufacturing Integration and Testing Readiness Review / Test Witness Verification and Environmental Test Review Final Acceptance Data Package Problem Failure Reporting and Review - Failure verification testing prior to PFR closure Configuration Management and Data Control - QA shall verify and sign off on changes Internal and External Auditing - inprocess and vendors Support Test Readiness Reviews and Pre-Ship Reviews Contamination Control Plan Software Assurance Plan - Revision control and test verification by QA - Problem reporting and retest verification by QA
Supplier Audit Status CETP C Swales P University of Colorado P ICS Radiation Tech P Valley Circuits A Speedy Circuits A Wyle Labs A Corwil A Maxwell A ECR Labs A Golden Altos Inc. A UTMC A Sierra Circuits A Rigiflex Tech A TUBS C Notes: Approved = A Pending = P Conditional = C