Flood Information and Notification System (FINS)

Slides:



Advertisements
Similar presentations
Bexar Regional Watershed Management Program Bexar Regional Watershed Management Partnership Pre-Proposal Meeting for Bexar County Program Management of.
Advertisements

Real-time Data Collection in Flood Warning Systems
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Ernie Wells Hydrologic Services Division NOAA National Weather Service May.
Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Workshop Module 4: Data Management Solutions for a Modernized HIS.
Benefits of a Flood Warning Network to Findlay, Ohio Brian C. Hurt, P.E. – Former City Engineer Findlay, Ohio.
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Dr. Thomas Graziano Acting Chief, Hydrologic Services Division Office of.
Tropical Storm Allison & its impact on Harris County
One Corps Serving The Army and the Nation Tulsa District The Tulsa District Corps of Engineers and Its Cooperative Partners.
USGS Streamflow Monitoring in Georgia NIDIS Early Warning System Development Workshop May 18-19, 2010 Callaway Gardens, GA.
INFORMATION SYSTEMS Overview
National Flood Conference April 22, 2009 Victor Hom Hydrologic Services Division Office of Climate, Water and Weather NOAA’s National Weather Service National.
MARFC River Ice Briefing Friday, January 31, 2014 NWS Middle Atlantic River Forecast Center Hackensack River at I-80 Bridge, NJ January 30, 2014 Photo.
FLASH FLOOD PREDICTION James McDonald 4/29/08. Introduction - Relevance  90% of all national disasters are weather and flood related  Central Texas.
Radar stage sensors and other instrumentation issues from the ICOM (Instrumentation Committee) November 14, 2006 James Fallon Annual COE-NWS-USGS Mississippi.
CEOS WGISS, Hanoi May OSCAR Prototyping the sensor web Wyn Cudlip BNSC/QinetiQ Presentation to WGISS Hanoi May 2007 (Slides.
CONFIDENTIAL. Reliable Resilient Real-time Flood Warning Network James Logan, OneRain,
USGS Overview Workshop on Improved Quality of Data and Data Exchange for Climate Research and Analysis NOAA National Climatic Data Center Bill Hazell,
The IEM-KCCI-NWS Partnership: Working Together to Save Lives and Increase Weather Data Distribution.
Mike McMahon Senior Hydro-meteorologist Flood Forecasting – A Whole New Level of Guidance 2012 ASFPM Annual Conference – San Antonio, TX.
The U. S. Geological Survey Streamgaging Network Supporting Society’s Water-Resource Decisions Presented by: Bob Hainly, Assistant Director USGS-PA Water.
Automated Flash Flood Forecasting Systems ¿Fact or Fantasy? International Workshop on Flash Flood Forecasting San Jose, Costa Rica, March 2006 Session.
Report number: Project Cost: $32,922 Project Duration: 12 months
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Peter Gabrielsen Chief, Hydrologic Services Division Eastern Region NOAA’s.
OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA Rene Vermeeren, P.E., D.WRE Chief, Hydrology and Hydraulics Branch Los Angeles.
IS3220 Information Technology Infrastructure Security
Unit 4 Lesson 5 Weather Maps and Weather Prediction
Vital Signs Monitoring system
Connect Collaborate Innovate End to end video solutions.
A Division of Group of Companies
IOT – Firefighting Example
UST Inspection Program
Information and documentation media systems.
Connected Living Connected Living What to look for Architecture
Discovering Computers 2010: Living in a Digital World Chapter 14
NCJA ZoomGrants Overview Presented by: Lindsey Johnson
Integrating ArcHydro and HEC Models by David R
Information Technology 2016 Budget Presentation
Presented by Jon Pastuszynski, Lead M&D Engineer
North Carolina Lumber River Basin Plan
Peggy M. Jackson, DPA, CPCU Peg Jackson & Associates
Connected Living Connected Living What to look for Architecture
Data Management Solutions for a Modernized HIS
Real Time Flood Event Modeling Program
Pack Your Park by Modernizing Your Business Online
Creating User Interfaces
Flood Monitoring Tools 2011 OFMA Annual Conference
Impact Based Forecast and Warnings in Curacao
Common Alerting Protocol in a Early Flood Warning Project
Mission To deliver quality in-home support, using technology while becoming a valuable and meaningful part of people’s lives… …offering independence with.
IS3440 Linux Security Unit 8 Software Management
Pack Your Park by Modernizing Your Business Online
Hydrologic Information System
Introduction Location Tracker management system ensures substantial productivity, gains including greater efficiency of fleet operations,higher field workforce.
Information Systems General Information.
Pubic Safety Radio System Paging System Operation Overview
Order Processing and Requisition Accelerator
MDE’s Phase III WIP Inventory 2018 Fall Regional WIP Meetings
Earthquake and Tsunami Program Governor’s Office of Emergency Services
Maintaining order and safety in a city is no small task
Status and Plan of Regional WIGOS Center (West Asia) in
Continuity of Operations Planning
Introducing Citilabs’ Scenario Based Master Network Data Model
Lesson 14 - Expert Reference and Disaster Management Tools
Information Systems General Information.
Disaster Recovery Operations
Flood Modeling Tools for Response and Alerting
Situational Awareness for Flash Flooding
Monitoring for Flood and Water Supply Forecasting
Hidden Risks of Faster Payments
Presentation transcript:

Flood Information and Notification System (FINS) History, Current, and Future of the Flood Information and Notification System (FINS) of Mecklenburg County, North Carolina Josh McSwain Charlotte-Mecklenburg Storm Water Services First time giving this presentation, so may rely on cheat sheet to keep me on track and on time. Since we have two projects on the Trustees current agenda that will not be discussing, I will be focusing on the larger initiatives underway in Charlotte and Mecklenburg County and the magnitude of those efforts.

FINS History: Why is a flood warning system needed? Bottom line, flooding is a threat to human life. Flood warning became one part of the Strategic Floodplain Guidance Document developed in the late 90’s. David Ford Consulting Engineers was hired to study the different methods of detecting possible floods (Ex. Forecasting, Modeling, Real-time Analysis). Our best option was Real-time Analysis

Flood System Requirements Real-time rain and stream data Gages and instruments to measure data Method to report the measured data Maintenance of field equipment and computers A plan to receive the data, monitor, and issue warnings Funding Staffing for a 24hr 7day system Particular sites to protect (warning sites) =

USGS Partnership Mecklenburg County has had a working relationship with the USGS for 30+ years and rain and stream gages have been in place for 40+ years. 1960's        4 1970's        6 1980's        7 1990's        24 2000's        51 Currently Mecklenburg County pays approximately $260,000 as part of the partnership to manage FINS. Overall operation budget of just under $1 million (split between the city of Charlotte, Mecklenburg County, and the USGS). USGS maintains all gage equipment (installation and routine maintenance) along with the radio equipment used to transmit and receive the alert and polling data. Also, they capture, post process, and store all of the alert and polling data within our network of gages.

Receive Alert Data Alert data is transmitted (from the gage) using a protocol called ALERT. This data is recognized by our radio equipment, decoded, then passed to DIADvisor and Contrail where it is written to a database. FINSLIVE and DIADvisor then displays the rain and stream.

Monitor Alert Data and send out Warnings Threat recognition rules developed for 12 vulnerable sites in the county. Each site has 3 levels of threat status: alert, investigate, emergency. Total of 59 unique precipitation and stage rules (some with as many as 35 threats) also we have 48 system component rules. Precipitation and stage threats are based on water level, rate of rise, rainfall, and mean areal precipitation (MAP). Example of Precipitation Rule

Gage Network 51 Streamgages – 2.5 to 92 sq. mi. 73 Raingages (1 per 7.5 sq. mi.) 4 Base Stations Receiving Data Routine (Polling) Data - Fixed Interval (USGS) ALERT Data – True Real-Time, Event Driven

Aviso FS – HEC HMS

Streamgages Pressure Transducers / Stilling Wells / Radars Water Level Checked Every Minute (once threshold is exceeded) Alert transmits every few seconds Routine (Polling) Data Recorded Every 5 Minutes ALERT Data Based on Predetermined Water Level Threshold and/or Rate of Change

Benefits of the System True Real-Time Data as Opposed to Near Real-Time (Flood Warning vs. 911 call) Two-Way Communication / Data Verification Redundancy to Cover Catastrophic Failures Cooperation between Federal, County, and City Governments, and the Private Sector Timely Response by Emergency Managers

FINS Room

FINS Future Enhancements Webcams

Advancements Will Allow… On-call staff and emergency service members to access data from anywhere with an internet connection More than one user to access the data at anytime User interaction with a GIS mapping application Provide additional redundancy for system security and reliability

Additional plans for the Future of FINS Update phase 2 of AvisoFS live Hec-HMS modeling Explore the Alert2 protocol. Questions?