Progress & Activity Plan Machining Chip Improvement

Slides:



Advertisements
Similar presentations
ENGINES, TRANSMISSIONS, FINAL DRIVES, TRAVEL/SWING MOTORS & HYDRAULICS: IMPROVE LIFE BY 2X TO 3X STRATEGIES TO INCREASE LIFE OF COMPONENTS AND EQUIPMENT.
Advertisements

Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
PB - Dialysis Review1 DIALYSIS MACHINES REVIEW OF PLUMBING INSTALLATION REQUIREMENTS.
Mini Jet Sample Dyeing M/C Daelim Starlet Co., Ltd.
BEE SME Program in Jamnagar Brass Cluster November 19, 2009.
MILK PASTEURIZER. One milk pasteuriser with a capacity of litres of milk for hours, HTST type with an operate range from 75° to 95°C, including.
Production of aggregates. Where does gravel come from Mines – rivers, banks, quarries Rivers – use dragline to mine gravel from river Banks – veins of.
Butch G. Bataller Lecture on ChE 192
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Emulsion Coolant Recovery System-InstaPure for Recovery and Reuse of water soluble coolants. Pure Tech India, A-5, Trec step, Thuvakudi, Trichy
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
TCV2000A High Performance Traveling Column Vertical Machining Center.
1 AFPC Norm Decontamination Facility Plant (NDF) 1.Introduction - The passage of produced water through pipe work and plants leads to the built up of Norm.
Air conditioning – Refreshes your life Mini-Chiller Applied Systems Sales1 EWA(Y)Q-AAV3P Residential Mini-Chiller Heating EWAQ - AA3VP EWYQ - AAV3P Cooling.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Progress Report – Week 9 Section AC, Group 2 Presented by Andrew Amodei Teammates: David Bergsman, Michael Huang, Elizabeth Lam May 24 th, 2012.
Maintenance of Machine tools
THE HYDROFLOW STAR FILTER
VisiMix Pipe Line VisiMix Ltd, PO Box 45170, Jerusalem, 91450, Israel Tel: Fax:
Flexible Manufacturing Hazardous Materials in Metal Manufacturing Copyright © Texas Education Agency, All rights reserved.
Pure Tech India InstaPure Coolant Recovery System for recovery and reuse of water soluble coolants Uniqueness defined a green technology.
CORK GLASS LTD. Introduction Cork Glass have 8 machines that use either fresh or recycled water as a coolant as part of the production process. This created.
1. SIVA By Prof. Dr. Attaullah Shah 2 Fine and Coarse aggregates.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
DAS Dynamic Assembly System FEATURES OF DYNAMIC ASSEMBLY SYSTEM Name of Dynamic Assembly System (DAS) is pointing out system adaptability to needs of production.
Spray Booths Follow safe operating instructions. Spray-finishing operations  Organic materials  Inorganic materials  Dispersed form  Deposited to.
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
LEADER® MULTICHAMBER MEDICAL TUNNEL WASHER LEADER is a professional manufacturer Backed up by 30 years experience in the Asia area of laboratory, pharmaceutical.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
Using 5S to Start Your Lean Journey Presented by: Brian D Krichbaum Process Coaching Incorporated.
Pulp Mill Operator Training Class 3
TRUMAN MIDDLE SCHOOL Presented by Counsilman ▪ Hunsaker Facility Audit.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
无锡凯夫制药有限公司 Wuxi Kaifu Pharmaceutical Co., Ltd. 无锡风光 Beautiful Wuxi 厂区环境 Plant view 办公场所 Offices 设施设备 Facilities & Equipment 证书 Certificates.
J. K. Industries © All Rights Reserved Manufacturer of Filtration Equipment.
INNOVATION FILTER SYSTEMS (P) LTD Give the best Filtration Solutions Pune.
Copyright ⓒ ECOSIAN. All right reserved. Biogas Purification and Compression System Training Program in Kathmandu University January 03, 2010 Dharma K.C.
WP 2 – Valorisation of Sludge
Robert Greenwald, P.Eng, MBA February 26, 2004
Update on the PSB Cooling and Ventilation Systems
PNEUMATICS Chapter 5 Secondary Air Treatment
REVERSE OSMOSIS PLANTS 5-35kl/day
St. George Infrastructure
PT AKEBONO BRAKE ASTRA INDONESIA
Investment Proposal for New Line Piston Wheel Cylinder Machining
Eliminate Lost Time When Charging Process at Gravity Casting Line
PT . Akebono Brake Astra Indonesia
Add 2 Zinc Stations + Tank Relayout Need to confirm the space with PTI
REVERSE OSMOSIS PLANTS kl/day
In-Line – Cleaning Systems
KYC-3000EX KYC Machine Industry Co., Ltd..
Green initiatives in ceramic tile manufacturing
Stop Valves High Quality Product Manufactured by Maniks
Electrical Gas Plumbing Heating & Cooling
LEADER ULTRASONIC CO., LTD
1A iAquaMax™ Kidney / water removal system
Bream Plus lid closing problem
Before After Problem - Improvement -
SNS Cryoplant Commissioning Past Experiences
Observation on Trials at TAFE Doddaballapur
PT/ED LINE MODERNIZATION PROJECT PROPOSAL
9, Nauki ave., Kharkiv, Ukraine, 61166
Spray Booths Follow safe operating instructions
New HEBEFIX.
Presentation transcript:

Progress & Activity Plan Machining Chip Improvement Report to: Board of Directors Progress & Activity Plan Machining Chip Improvement PT. Akebono Brake Astra Indonesia Mar 20, 2017 Copyright Akebono Brake Industry Co., Ltd. All Rights Reserved.

Current AAIJ condition Chip stuck at machine walls, jig & fixtures because of small flow and pressure of coolant : Low power pumps  AAIJ 0.75 kW, ACG 7 kW Small volume chip conveyor Small drum filter No magnet to catch fine chips & body casting carbon Capacity of drum only 230 litre/min if use high volume pumps flooding chip conveyor

Activity Plan Permanent countermeasures Based on ACG benchmark, to clean up machine room inside (jig, tables, tools, walls) we need to replace all machining pumps with bigger size from 0,75 kW to 7 kW for each machine. We also need to increase chip conveyor size from 500 – 600 litres to 2,000 litres for 4 machines equipped with magnet scraper and magnet separator Option 1 (chip conveyor with 3 drum filter with magnet separator)

Activity Plan Permanent countermeasures Option 2 (chip conveyor with no drum filter with magnet scraper & separator) : ACG Investment needed (estimation) 1 chip conveyor : IDR 200,000,000 (new) – local supplier IDR 100,000,000 (modification) – local supplier Lead time : 3 weeks

Activity Plan Additional body shower inside machine Permanent countermeasures Additional body shower inside machine Replace washing machine Investment needed

Activity Plan Temporary countermeasures For non thru coolant machines, remove the drum filter replace it with mesh plate and connect it with high flow pumps

Activity Plan Temporary countermeasures For thru coolant machines, make buffer tank with bag filter and cyclone and equipped it. Coolant supplied from chip conveyor before drum filter. Buffer tank : 300 litre

Equipment list to improve Matrix what each line needed Line Chip Conveyor Body washer Washing machine Magnet scraper Sel 2 4 (New) 10 units X Sel 4 4 (modify) 15 units 1 unit 4 units Sel 5 Sel 3 Sel 7 Sel 8 Sel 9 3 (modify) 3 units Sel 6 2 (new) 13 units 5 units MWC1 2 (modify) 2 units MWC2 MWC3 6 units PWC

Equipment investment Equipment Investment/unit Qty Total Chip conveyor In IDR millions Equipment Investment/unit Qty Total Chip conveyor (modify) 100 22 units 2,200 (new) 200 10 units 2,000 Washing machine 250 6 units 1,250 Buffer tank with filter bag & cyclone 60 4 units 240 Body shower (piping) 10 101 units 1,010 Pumps & accessories 30 202 units 6,060 TOTAL 12,760

Schedule (short term)