Evaluation of Suppliers of Critical Consumables, Supplies and Services Section 4.6.4 February 2016.

Slides:



Advertisements
Similar presentations
Transition from Q1- 8th to Q1- 9th edition
Advertisements

Grade “A” Laboratory Evaluation Program Ronald G. Brown Dairy Product Specialist/Laboratory Evaluation Officer NYS Department of Agriculture and Markets.
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
First Article Inspection Report
ISO Culture SHOQ Quiz 1. This program must be run in MS PowerPoint and requires sound. 2. Click “View” and then “Slide Show”. 3. Click “Continue”
The Islamic University of Gaza
1 Texas Multiple Award Schedule Presented by Richard San Jose.
Purchasing 101 A guide for department administrators presented by: Heidi Williams January, 2012.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
5.2 Personnel Use competent staff Supervise as necessary
Instructions and forms
E-rate Audits/Reviews Be prepared!! Prepared by Judy Jones, State Library of Iowa.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
MyFloridaMarketPlace Receiving Made Simple Commodities and Services Job Aid.
Introduction to ISO New and modified requirements.
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
Materials Management (MM)
OH 3-1 Receiving and Storing to Maintain Quality Food Production 3 OH 3-1.
E-Billing Payment Vouchers (VP9) Online Training.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
What Documentation Needs to be Submitted With an Approval Application?
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
Project management Topic 3 Quality.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
Best Practices for Inventory Control Patricia Hanson Biological Administrator I Florida Department of Agriculture and Consumer Services Food Microbiology.
Most Common Deficiencies Cheryl O. Morton Managing Director, AIHA Laboratory Accreditation Programs, LLC.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
ISO :2015 Documentation kit for Accreditation of Certifying Body - by Global Manager Group
Supplier Corrective Action Request (SCAR) Supplier Training
Inspection & Test Plan (ITP) / Manufacturing Process Quality Plan (MPQP) - training of suppliers to FMC Technologies, Norway QRL FMC Standard.
CHORI Purchasing Flow Chart
External Provider Control
Title I Equipment Inventory Requirements
Chapter 22 Procurement Cycle and Documents
Title I Equipment Inventory Requirements
Create a PO-Based Invoice
Make-to-Stock Scenario Overview
ISO/IEC
P2P Module: Ariba P2P REQUISITION AND APPROVAL
CONTRACT ADMINISTRATION
FSEP Year End Reminders
Module 3 – Create a Non-Catalog Requisition
OH 3-1 Receiving and Storing to Maintain Quality Food Production 3 OH 3-1.
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
UNIT V QUALITY SYSTEMS.
Make-to-Stock Scenario Overview
Department of Community Development
Audit Documentation and Administration
ISO 9001 Awareness Training.
Requisition Entry Guide
The Office of Procurement PURCHASING TRAINING MAY 2018
Create and Edit Item Records
Ch. 15: Accounting for Purchases and Cash Payments
CDRL E003 CFAT REPORT TEMPLATE
Clauses on MDA purchase orders
Management of Change Report Errors to Management.
SBS Vendor Management™
September 21, 2017 Carmen Connect Webinar
SQA01 Guidance Material: FAI Review
Reimbursement Training
SQA01 Supplier Guidance Material: Permission to Ship Forms
Requisition Overview Continued
Title I Equipment Inventory Requirements
ISO 9001:2008 Quality Management Systems
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Company X Process Mapping Training
What are they preserving?
Radiopharmaceutical Production
Diversity management system (DMS)
Presentation transcript:

Evaluation of Suppliers of Critical Consumables, Supplies and Services Section 4.6.4 February 2016

ISO 17025:2005 Section 4.6.4 The Laboratory shall evaluate suppliers of critical consumables, supplies and services which affect the quality of testing and calibration, and shall maintain records of these evaluations and list those approved.

ISO 17025:2005 Section 4.6.4 ALLAC also states: “Once a supplier has been evaluated and approved there shall be a program to ensure continued suitability of the supplier”.

Procurement at MDA prior to Accreditation State procurement was a Global system designed by accountants for accountants. Laboratory has a homegrown front end to this system that provides a catalog feature and captures data of interest to Laboratory Managers.

Filemaker Catalog Written in Filemaker Drop down menus

Section 4.6.4 Major Objectives of standard was to: Evaluate Suppliers Maintain Record of Evaluation Program of continued monitoring

Section 4.6.4 Some Questions and Concerns: State uses contract vendors One contract vendor provides many various critical consumables and supplies Where best to build system?

Contract Vendors

Contract Vendors Large Contract Vendors are only suppliers if they provide their own line of critical material. As problems arise you evaluate that individual supply or consumable. Disqualify the contract vendor for that commodity.

Contract Vendors

Contract Vendors Use the Vendor performance report stressing the requirements of the Standard. This has been and should be sufficient to go “off contract”

Where Best to Build System? Decided to build approved supplier list into our QMS Driven off a FORM which can be downloaded from our QMS document module. Completed form is attached to the vendor file in the approved supplier list. Supplier status is verified when entering orders. Process described in SOP.

When Ordering Requestor orders based on method/Work Instruction requirements. Determines if item can affect quality of result. Verifies if supplier is on the approved list.

When Ordering Items from suppliers not on the list must be evaluated after receipt. Certain suppliers of services that hold accreditation to ISO17043, ISO17025 or ISO Guide 34 are generally considered acceptable.

Upon Receipt of Supplies Item is inspected for package integrity. Contents are verified against purchase order and shipping paperwork is initialed and dated by lab staff. Added to unit inventory following established procedures.

Evaluations Checks are performed per the method or specific work instructions. Findings are documented in lab technical records. Unsatisfactory materials are reported to superviser who has supplier removed from the approved supplier list and Filemaker system.

All vendors in Front End Purchasing System were evaluated. Evaluation Form 5 Pages All vendors in Front End Purchasing System were evaluated. New Vendors are recorded after commodity is received and evaluated. Detailed list of consumable, supply or services covered. Section on PT providers. Applicable Pages are completed as necessary.

.

Evaluation

Evaluation

Evaluation

LAB SOP 0085

Minnesota Department of Agriculture For Copies of SOP, Forms contact, Gary Horvath Gary.Horvath@state.mn.us 651-201-6563