FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.

Slides:



Advertisements
Similar presentations
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Advertisements

CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
CMS FPIX Cooling Prototype Phase One Estimate and Conceptual Design R. L. Schmitt 10/28/2009.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
13th April 2005R.Bates, QM Measurements of Barrel and EC HEX R. Bates, M. Olcese, B. Gorski, QM for prototype builds.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
VTCS overview 13 April 2006 NIKHEFBart Verlaat 1 NIKHEF involvement in VELO ~1 m module support CO 2 cooling detector "hood" kapton cables Vacuum vessel.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cooling System(s) for the Roman Pots of TOTEM experiment 1 V. Vacek AGENDA: 1.Scope of the Research activities (TFP and DAQ group at the Dept. of Applied.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 24/9/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
Oct. 9, 2008W. Bertl - PSI BPIX Cooling with CO2 Assuming 3 or 4 Layers.
30 th June 20111Enrico Da Riva, V. Rao Parametric study using Empirical Results June 30 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
LHCb VELO Meeting LHCb VELO Cooling System Bart Verlaat (NIKHEF) 25 February 2003.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
CO 2 Cooling: Overview over CMS activities Jennifer Merz RWTH Aachen University, 1. Physikalisches Institut B May CEC General Meeting, Karlsruhe.
UT cooling discussion 3 december 2014
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Phase 1 FPix Cooling Tube Testing Erik Voirin, C.M. Lei, Harry Cheung, Stefan Gruenendahl (FNAL) Kirk Arndt, Qiuguang Liu (Purdue) Phase 1 FPIX cooling.
Limits of CO 2 Cooling A clear explanation that anyone can understand (the goal) Hans Postema & Joao Noite PH-CMX-DS1.
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Krzysztof Śliwa 26 August, Krzysztof Śliwa 26 August, 2015  Tests done between 7th to 25th of August 2015  Circulation in by-pass over the manifold.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
A two-stage system for the future cooling system.
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
CMS Upgrade CERN April 27, 2010 W. Bertl PSI Power & Cooling: Design Status of BPIX.
CERN Cryolab CO 2 cooling for pixel detectors Investigation of heat transfer Christopher Franke, Torsten Köttig, Jihao Wu, Friedrich Haug TE-CRG-CI.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
FPIX Upgrade – Status of CO 2 Cooling Studies S.Grünendahl, FNAL for the FPIX Upgrade Mechanical Group H. Cheung, G. Derylo, S.G., S. Kwan, C.M. Lei, E.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
For the CMS Pixel detector
Feedback on transfer line sizing and flow calculations for UT
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
VELO Thermal Control System
For the CMS Pixel detector
Performance of a CO2 System with Four Parallel Pipes
Forum on Tracking Detector Mechanics - Bonn, May 2016
Pixel cooling specifications
Aachen Status Report: CO2 Cooling for the CMS Tracker
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
Progress at the large scale CO2 system,
Pixel CO2 Cooling Status
Detector Technology Group
Recirculating CO2 System
VELO Thermal Control System
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Aachen Status Report: CO2 Cooling for the CMS Tracker
Tests of Endcap capillary & Heat exchangers at CERN
For the CMS Pixel detector
Presentation transcript:

FPix Cooling Circuit

FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal = 2.2g/s FPix HD evaporators in series configuration. Inlet capillaries sized for 10bar show less flow variation when the other parallel HD is switched off. Flow varies from 2 to 2.4g/s due to heat load differences between parallel loops. Inlet capillary used has 0.8mm ID and 2m length but can be sized according to the available space. Based on the results, the total mass flow consumed by FPix is foreseen to be 30g/s.

Inlet capillary: ID=0.8mm Low margin wrt Dryout at maximum power FPix HD Tube ID 1.3mm Tmax = -12°C Inlet capillary: ID=0.8mm L=1.42m DC-DC Converter + PC Half Disk Boiling trigger Low margin wrt Dryout at maximum power

FPix HD Tube ID 1.4mm (baseline) Tmax = -13.5°C Inlet capillary: ID=0.8mm L=1.75m DC-DC Converter + PC Half Disk Good transition to boiling Ideal 2-Phase flow regime and good margin wrt Dryout

Inlet capillary: ID=0.8mm Optimum performance and large safety margin FPix HD Tube ID 1.6mm Tmax = -15.5°C Inlet capillary: ID=0.8mm L=2.08m DC-DC Converter + PC Half Disk Perfect transition Optimum performance and large safety margin

Inlet capillary: ID=0.8mm FPix HD at 15°C and Ready for Data Tmax = 17.3°C HD 1.4mm ID Inlet capillary: ID=0.8mm L=1.75m DC-DC Converter + PC Half Disk Small safety margin

BPix Parallel Loops Mockup Full -Z Layer #4 Circuit DAQ System Panels BPix –Z Layer 4# complete cooling circuit, all 4 parallel loops. Mockup designed and built to investigate the flow behavior of parallel loops under heat load imbalance conditions. Development of LabView integration together with MatLab and Refprop to be able to measure individual loop mass flow by using differential pressure across each inlet capillary.

BPix Flow Distribution Mockup Full -Z Layer #4 Circuit assembled at B158 BPIX DC-DC and PC Inlet Manifold and Capillary Area Outlet Manifold PT100 Instrumentation Ω Heating Method

YBO CO2 Transfer Line Sizing Concentric Tube HEX Transfer Line 30m line results into ΔPmax = 0.45bar ≈ 1°C Assembly example, tube length not to scale The CO2 transfer line regulates the detector inlet liquid temperature via internal heat exchange with the detector’s returning flow. Max required mass flow up to 10g/s at main transfer line from manifold to PP0. 2-Phase pressure drop models indicate a loss of 1°C. 16m experimental setup is being built at B158 to verify. Pixel Nominal Conditions