Milestone/Task/Activity List out People or Department Names

Slides:



Advertisements
Similar presentations
Spreadsheet Vocabulary
Advertisements

Spreadsheet Vocabulary Split the screen so you can see the words AND the crossword puzzle AND the quiz at the same time.
Guide to Benefits Analysis.
RACI chart overview.
3-1 Planning the Project. 3-2 If a Problem Occurs During a Project Is It Most Likely Due to: 4 A) Poor Execution 4 B Poor Planning.
MEM 612 Project Management Chapter 3 Planning the Project.
Project Management Tools Utilized in Tech Transfers Morning Session #1 Robert Beall, PMP.
ICT Homework Zak Barwell. Spreadsheets A computer program used chiefly for accounting, in which figures are arranged in the rows and columns of a grid.
Project Management 3. Project Management Plans. Week 3.
Organizing for Advertising and Promotion: The Role of Agencies and Other Marketing Communication Organizations.
Total Operational Excellence 18/09/ Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust.
Project Roles & Responsibilities Katy Koenen 05/07/2013.
Driving empowerment, accountability and teamwork.
Creating a Large Poster from a PowerPoint Presentation Margy Ingram Learning Technology Services University of Wisconsin-Stout Margy Ingram Learning Technology.
Tables 4 th grade. Lesson and Behavioral Objectives.
STRATEGIC MANAGEMENT ACCOUNTING Organizing Basics for Structure Organizations are comprised of individuals who work together in GROUPS: teams, taskforces,
Business Consulting Services Engagement Proposal & Letter of Agreement Project Management Timelines/GANNT Chart.
Responsibility Charting
Step 1: Place x 2 term and constant into the box 2x 2 2 PROBLEM: 2x 2 + 5x + 2.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
Simple-use Tutorial How to Process a Credit Card POST-AUTH Transaction in PCCharge.
Integrated Business Software and Project Management: One Company’s Perspective H.W. Lochner, Inc. Doug Burton, PE, PMP Michael Galbraith, AICP, PMP PMI.
Practical IT Research that Drives Measurable Results 1Info-Tech Research Group Establish an Effective IT Steering Committee.
WILY MANAGER Just-in-Time Management Advice RACI Analysis Responsibility Charting.
Contents ARCI basics What does ARCI mean? How to read an ARCI chart Understanding the context and integration of an example ARCI (using an R&D function)
MULTIPLICATION 5 Multiplicand X 3 Multiplier 15 Product LET’S LEARN
International Computer Driving Licence Syllabus version 5.0
Organizational Chart Template
How to Run a Successful RFP
Spreadsheets.
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
Graphing Linear Equations
Home Show Marketing Guide
Welcome.
The Line Graph.
Sales Force Automation
(Global / All Markets View)
HR Business Partner Individual Development Plans
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
DoD Issuances Portal System (DoDIPS) User Guide – Focal Point
© 2016, 2017 Change Healthcare Solutions, LLC. All Rights Reserved.
A Step-By-Step Tutorial for the Discipline Data Reporting Tool The Delaware Positive Behavior Support Project Slide 1:   Welcome to.
A Step-By-Step Tutorial for the Discipline Data Reporting Tool The Delaware Positive Behavior Support Project Slide 1:   Welcome to.
Micro Design Workstream Name Subgroup / Function Name 1 Activity/Task
Responsible, Accountable, Consulted, Informed
STAR Element Current State Future State Gap
Marketing the Results of SPDG Initiatives
Document Custodian of the Drop Safe Log
Successful Information Security Governance
Workforce Timekeeper™
الحد من المشاكل السلوكية في رياض الاطفال
Do Now: Misc. Activities
[Project Name] Project Gating Presentation
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Project proposal for ISO 14001:2004 implementation
Communication Plan PPT Template
Applications of Matrices
Core Competencies of a World Class Customer Advisory Board
UNIVERSITY PRESENTATION GUIDANCE AND ADVICE
Detailed Definitions – R-A-C-I
Company Registration Instructions
4 + (-5) = A. Start at zero B. Move ______ spaces ___________ to get to the first number. C. From there, move _____ spaces __________ D. My final answer.
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
Wily .com.
Tasks and responsibility sharing in the KA Team
LEARNING OBJECTIVE: TO BE ABLE TO HAVE A CONVERSATION IN A PHARMACY.
Satoko Saito Customer Engagement, Japan
Kim Price Practice Leader, VP
Functions and Their Graphs
Presentation transcript:

Milestone/Task/Activity List out People or Department Names RACI Chart Milestone/Task/Activity List out People or Department Names Name R = RESPONSIBLE Performs tasks in support of effort; responsible for doing the work A = ACCOUNTABLE Accountable to be sure task is carried out and achieves the intended results; initiates, follows through, manages task C = Consulted Needs to provide input, review, advice, go/no go or technical support I = INFORMED Needs to be kept current, but does not have decision input © 2016, 2017 Change Healthcare Solutions, LLC. All Rights Reserved.

RACI Chart Instructions: The RACI chart is a tool used for identifying who will do what allowing you as the change sponsor or manager to ensure accountability for all tasks. To complete the grid: List your milestones, tasks, or activities in the column to the far left. Next list either specific people or departments in the space across the top of the graph. Finally, identify who is: Responsible by placing an R in the corresponding box that aligns to the task. There must be one “R” for each row (no more and no less). Accountable by placing an A in the corresponding box that aligns to the task. There can be zero to one A’s in each row but no more than one. Not every task needs a key decision or approver. Consulted by placing a C in the corresponding box that aligns to the task. There can be as many “C’s” as necessary. Informed by placing an I in the corresponding box that aligns to the task. There can be as many “I’s” as necessary. Milestone/Task/Activity List Out People Names or Departments Sales Marketing Account Mgmt Legal Design booth space for exhibit A R C Order new giveaways for event I Invite clients to come to booth prior to event Order material for event