Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Advertisements

Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Summary of Accelerator Systems Collimation Parallel Session 19 October 2007 LARP CM#9 - SLAC Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
LARP Rotatable Collimators for LHC Phase II Collimation 18 April 2007 LARP Collaboration Meeting – Fermilab Tom Markiewicz/SLAC Representing Gene Anzalone,
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 24 April 2008 LARP CM#10 Tom Markiewicz/SLAC BNL - FNAL-
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
Sergio Calatroni TS/MMETS Workshop, Archamps RF Fingers for Secondary Collimators What is that? Constraints for design Choice of materials:
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
News and Introduction from CERN June 15th, 2005
LARP Contributions to LHC Phase II Collimation
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
LARP Phase II Secondary Collimator RC1
Review on collimator movement with stepping motors
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
SLAC RC Status Report US LHC Accelerator Research Program
Review on collimator movement with stepping motors
Terry Cotter LO/IF Group Leader
Recommendations of 12/16/05 review committee & SLAC response
LARP Phase II Secondary Rotatable Collimator
23 April 2012 Tom Markiewicz/SLAC
¼ meshed models for Omega3P calculations
LARP Phase II Secondary Collimator RC1
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
US LHC Accelerator Research Program
RC1 Prototype Conceptual Design Review 15 December, 2005
LHC Collimator – RF Contact Concept (180o wrap)
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
SNS PPU Cryomodule Thermal Shield
US-HiLumi – Shipping Post Assembly Status
Presentation transcript:

LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status Revised 3/07/07 LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 1 /15

Winding and Misc. Tests update Braze Test plan forward Outline Winding and Misc. Tests update Braze Test plan forward Thermal Test (Prototype Hardware) and Test Lab update RC1 progress and near term plans LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 2 /15

Winding and Misc Tests update In progress now (second 200mm lg Winding Test Mandrel) : Slight modification to drive cog is required due to machining error at Mandrel upstream end. Winding of cooling lines onto Mandrel will then proceed. Up Next: Brazing of the above completed assy. Lower priority, but still on the list: Twist a length of actual cross-section to failure for a measure of the margin of safety and maximum torque requirements. Bend samples of actual cross-section into required configurations. Section samples to inspect for internal distortion shapes and smoothness of transitions. LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 3 /15

New 200mm long Mandrel (upstream end) LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 4 /15

New 200mm long Mandrel (down stream end) LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 5 /15

New 200mm long Mandrel (up stream end) Larger opening here prevented drive pins from engaging in slots LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 6 /15

Braze Test update and plan forward In the Queue at the Braze Shop: Cu-Mo Hub-Shaft Brazing is next up for the braze shop (minor modifications are anticipated for proper braze clearances). Should have brazing completed by next week. Assy. will be sectioned for microscopic inspection of the copper grain boundaries at joint. Still waiting: 1st Braze Test Assembly has been re-scheduled to late March for the vacuum bake and pump down testing. Will section the Assy. and inspect braze joint voids after above test is complete. LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 7 /15

Cut-away of Cu-Mo Hub CAD Model #1 #2 #3 #4 #1 - Mandrel Dummy #2 - Mo Shaft Dummy #3 - Mo Backing Ring #4 - Cu Hub with braze wire grooves LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 8 /15

Cu-Mo Hub Braze Test parts #2 #1 - Mandrel Dummy (not shown) #2 - Mo Shaft Dummy #3 - Mo Backing Ring #4 - Cu Hub with braze wire grooves #3 #4 LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 9 /15

Full Size Single Jaw Thermal Test Hardware Progress Jaw 1/4 sections (qty 24) now at SLAC require slight modifications for braze gap requirements. Full length Mandrel in fabrication at local vendor. Due 07 March 07. Central bore machining of Mandrel on hold pending Mo-Cu Hub braze test results. Power Supplies and Ground Fault equipment is mounted in rack. Interconnect wiring completion awaiting manpower availability. LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 10 /15

Work continuing on Collimator mounting/rotation system: RC1 Design progress Work continuing on Collimator mounting/rotation system: U-Joint Drive Axle Assembly. Detail drawings are complete. End Support and Rotator mechanism. Detail drawings are in work. Plan to release drawings as a Drive/Support Assy. package for fabrication by 16 Mar 07. LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 11 /15

RC1 Design progress cont’d Image Current Plate Design. Present RF spring loading requirements of a few 10s of grams per finger cause excessive deflection of the tie-rod portions of the Image Current Plate. Tie-Rods LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 12 /15

RC1 Design progress cont’d Challenges we face are the complexity of water cooling the tie-rods and dealing with the magnitude of above deflections. Pre-machining the opposite curvature into the part may work but other options could be less difficult/costly to implement. Reducing spring loading, if possible, in areas farther from the beam would help. Different RF spring configurations are being explored. A tie-rod less design is proposed. Original transition configuration (hourglass shape) is being re-considered as well. As a result some RF and Image Current questions arise so.. expert advice is needed. LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 13 /15

Revised RF Spring configuration Double Wedge Adapters mount across Tank ceiling & floor Jaw facet RF springs mount on Tank ceiling & floor 2 RF springs mount to each Adapter Shorter length springs also mount to Tank ceiling & floor Note: Jaw facet springs are wide enough for line contact thru full transverse travel range LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 14 /15

Alternate Sheet Metal Transition configuration NORMAL CONTACTS TO TANK CEILING & FLOOR RETRACTED 22.5MM HOURGLASS Note: Not all Jaw facets are shown RECTANGULAR ROUND LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 07 Mar 2007 No 15 /15