Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
LARP Rotatable Collimators for LHC Phase II Collimation 18 April 2007 LARP Collaboration Meeting – Fermilab Tom Markiewicz/SLAC Representing Gene Anzalone,
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
1 IST development status  Seattle  Composite Design.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
Procurement Status Miao Yu 11/19/2013.
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
LARP Phase II Secondary Collimator RC1
Complementary ISTC Projects #3888, 3889p
LARP Phase II Secondary Collimator RC1
Status report on MQYY (Q4)
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Joint Meeting SPS Upgrade Study Group and SPS Task Force
LARP Phase II Secondary Collimator RC-1
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
2th EuCard Col/Mat WP Meeting
MICE Coupling Coil Update
Recommendations of 12/16/05 review committee & SLAC response
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Collimator RC1
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
Injector / Linac Installation Current Status
RC1 Prototype Conceptual Design Review 15 December, 2005
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Status of SF Model Dipole Contract with TAMU
Production Cryo HL-LHC BPMs
Presentation transcript:

LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status Revised 12/11/06 LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 1 /17

Winding and Misc Tests update Braze Test plan forward Outline Winding and Misc Tests update Braze Test plan forward Thermal Test (Prototype Hardware) and Test Lab update RC1 progress Near term development and test plans Image Current Plate and Jaw Solid Model LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 2 /17

1m long Coil Winder LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 3 /17

Coil Winder Close-up LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 4 /17

Tubing Bender for sample tests and production LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 5 /17

Braze Test update and plan forward Test Mandrel has been machined for the braze wire groove and the OD reduced (~0.4mm diameter) to eliminate tubing distortions. QC department has measured the 4 Quarter Jaw IDs and the Test Mandrel and determined modifications to the Jaws are necessary. Jaws are being modified by shop. Promise completion date 12/12/06 Klystron Manufacturing Braze Shop will then perform Jaw brazing on 200mm long Assy. Promise completion date 12/19/06 Assembly will then be sectioned for braze joint inspection. LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 6 /17

Mandrel and Coil ready for braze wire groove and clean-up machining LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 7 /17

More Braze development tests planned A second 200mm long Copper mandrel will be fabricated for more Jaw braze technique development and winding practice before the full size Heater Test Mandrel is attempted. Molybdenum to copper braze tests are in the planning stages. LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 8 /17

Single Jaw Thermal Test Hardware Progress Clean Tent infrastructure upgrades nearing completion. The room is filling up with equipment Molybdenum Shaft completed and in house on 11/28/2006 Jaw 1/4 sections qty 22 released to vendor (includes 2 spares and 4 for additional Short Mandrel Tests) Late January anticipated Improved/Revised Mandrel design released to vendor for fabrication Mid January date promised LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 9 /17

Completed Molybdenum Shaft LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 10 /17

RC1 near term plans Bending 10mm sq. OD/ 7mm sq. ID copper samples into design configurations to check for distortions (internal and external) Samples are being fabricated from 11mm sq. CDA101 conductor Interested in knowing how much the tube deforms inward (relative to Mandrel OD) as a result of winding If deformation is unacceptable may need to bulge it back out by over-pressurizing the tube after brazing Still on the list: Twist a few samples to failure for a measure of the margin of safety and to determine actual torque required Starting detail work on: Collimator End Supports and Bellows Assy Prototype “Rotator” design for proof-of-concept testing U-Joint for initial deflection tests Fabrication of appropriate CERN hardware Drawing Trees and Lists for this are in work LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 11 /17

RC1 longer term plans Beginning to think about a Dummy Collimator for use in beam tests in 2007/2008 before final prototype is delivered for damage tests: no rotation no cooling one jaw 2 jaw steppers For impedence tests: 2 Jaws 4 steppers Image Current Plate with RF springs no water cooling ??? What tests are really possible in 2007? Should we be preparing this hardware? LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 12 /17

Image Current Plate and Jaw Solid Model The next few slides show the Image Current Plate and RF Contact options in the Solid Edge Prototype Model recently emailed to Ralph Assmann. Try to open the Solid Edge model. Review the designs Your comments will be greatly appreciated Advise us as to which option, if any, best meets the project goals Incompatible software interface? How can we provide a better transfer for this and future more complicated models? LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 13 /17

Image Current Plate with RF Contacts LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 14 /17

RF Contacts at Jaw Ends LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 15 /17

Longitudinal Contact Options Top and Bottom are CERN existing design Alternate Options also use CERN contacts Favorite Option uses Omega Co. contacts LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 16 /17

Inside detail Possible Option ? LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 11 Dec 2006 No 17 /17