FONT Meeting 10th February 2011

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
D. R. BettFONT Meeting 30 Jan Summary of FONT Studies Jan 2014 D. R. Bett.
D. R. BettFONT Meeting 10 Feb Summary of FONT Studies Jan 2014 D. R. Bett.
Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1,
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing ns.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
D. R. BettFONT Meeting 5 th May Current DAQ State D. R. Bett.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
1 DAQ Update. 2 DAQ Status DAQ was running successfully and stably in ’07 beam time Trigger bus scheme has proven to be very flexible – Added additional.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
02/02/ S. Baron RF-Experiments Timing Meeting - Feb RF CMS ATLAS ALICE LHCb BTPX Status.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
November 15 Timing is Everything A software approach for a generalized profilometer Dr. John B. Ferris Stephen Chappell Cameron Rainey.
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1Ben Constance7 th January 2010 FONT5 December 2009 feedback results During the final shift we ran K1-to-P2 position feedback 151.2ns bunch spacing, quadrupoles.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
1Ben ConstanceFONT Meeting 1st August 2008 ATF2 digital feedback board 9 channel board with replaceable daughter board (RS232 etc.) − Board will log data.
Fermilab February 17, 2003Recycler BPM Front-end1 Duane C. Voy
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
FONT5 digital feedback boards
N. Blaskovic, T. Bromwich, R. Ramjiawan
FACET Tests Update A. Latina, J. Pfingstner, D. Schulte,
Roundup of Week at ATF Mikey Davis 19 April /26.
RF acceleration and transverse damper systems
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
Level-zero trigger status
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
Monitoring glitches in the frequency divider
Firmware Update 29/03/2017 Rebecca Ramjiawan.
Status of the Beam Phase and Intensity Monitor for LHCb
N. Blaskovic, T. Bromwich & G. Christian
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Summary of Week 11: 14 – 21 March
CSC Trigger Primitives Test Beam Studies
University of California Los Angeles
Beam Position Measurements in TTF Cavities
VELA BPMs Alex Brynes.
J. Rutherfoord & P. Schacht 17 May 2004
Extraction kicker scan & feedback results
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Wednesday h18: 228b fill lost just before start of ramp.
Tuesday
Presentation transcript:

FONT Meeting 10th February 2011 Results Dec 2011 D. R. Bett D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Feedback Flags Two issues: Feedback flags for interleaved data do not report the true state No readback flags from the non-feedback board in any case How to analyse the data? D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Some example data FB flag reports FB ON state 1 trigger early DAC reflects true state stuck on FB ON (glitch) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 DAQ modification PRE-DEC 2011 DEC 2011 Trigger ADC data readbacks ADC data readbacks 1 [164x9] [1x49] [164x9] [] 2 [164x9] [1x49] [164x9] [1x49] . . . . . N [164x9] [] [164x9] [1x49] N+1 [] [] [] [1x49] ____________________________________________________ Triggers N N-1 N N → restore order by ignoring first entry of ADC file, last entry of readback file D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 FB flags 7/12 Bunch 2 in FONTP2 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 FB flags 13/12 Bunch 2 in FONTP2 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 FB flags 14/12 Bunch 2 in FONTP2 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 FB flags: Conclusion Feedback flags accurate if one discards: First entry from the .dat file Last entry from the .rb file Given this, should be possible to analyse Board #2 data by aligning with Board #1 using the trigger timestamps D. R. Bett FONT Meeting 10th February 2011

Board Synchronization Analyse timestamps from both boards Discard non-concurrent triggers Write new data files keeping only the simultaneous triggers, duplicating board #1 feedback flags to the board #2 .rb file Analyse as if it were board #1 data D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Synch. 7/12 Bunch 2 in FONTP2 Bunch 2 in MQF15X fbRun17_board2 D. R. Bett FONT Meeting 10th February 2011

Timestamp glitching (I) → implement more robust checks on timestamps D. R. Bett FONT Meeting 10th February 2011

Timestamp glitching (II) DAQ “buffering” issues DAQTest1 FIRMWARE D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Synch. 7/12 (2) Bunch 2 in FONTP2 Bunch 2 in MQF15X D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Synch. 13/12 Bunch 2 in FONTP2 Bunch 2 in MQF15X D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Synch. 14/12 Bunch 2 in FONTP2 Bunch 2 in MQF15X D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Overview of data D. R. Bett FONT Meeting 10th February 2011

Part I: BPM Calibrations D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 BPM Calibrations D. R. Bett FONT Meeting 10th February 2011

Analysis of LO phase scans zero point drift overall offset original adjusted SETTING -10 +10 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 LO phase scans D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 LO phase scans D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Feedback All feedback runs, except: 07/12 (I) Run 1 (no board #2 data) 07/12 (II) Run 6 (no beam for latter half of run) 13/12 Run 1 & Run 2 (no bunch 2 in MFB1FF) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun2 gain500 07/12 (I) N ~ 100 D. R. Bett FONT Meeting 10th February 2011

fbRun1 singleLoopK1 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun2 singleLoopK2 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun3 doubleLoop 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun4 singleLoopK1 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun5 coupleLoop 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun8 coupledLoop 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun9 coupledLoop 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun10 coupledLoop 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun11 coupledLoop 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun22 coupledLoop 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

fbRun23 coupledLoop 07/12 (II) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun3 skewOn 13/12 N ~ 100 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun4 skewOff 13/12 N ~ 100 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun5 skewOff 13/12 N ~ 100 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun6 QSskewOff 13/12 N ~ 100 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun7 QSskewOff 13/12 N ~ 100 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun8 QD10 57.009A 13/12 N ~ 100 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun9 QD10 57.009A 13/12 N ~ 100 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 FbRun1 coupled 14/12 N ~ 50 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 FbRun2 coupled 14/12 N ~ 50 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 FbRun3 coupled 14/12 N ~ 50 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 FbRun4 coupled 14/12 N ~ 50 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 FbRun5 coupled 14/12 N ~ 50 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun6 coupled 14/12 N ~ 250 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun7 coupled 14/12 N ~ 250 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun8 coupled 14/12 N ~ 250 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun9 coupled 14/12 N ~ 100 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun10 coupled 14/12 N ~ 75 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 fbRun11 coupled 14/12 N ~ 50 D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Gain Scans D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Single K1 07/12 (Board #1) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Single K2 07/12 (Board #1) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Coupled K1 07/12 (Board #1) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Coupled K2 07/12 (Board #1) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Single K1 14/12 (Board #1) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Single K2 14/12 (Board #1) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Coupled K1 14/12 (Board #1) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Coupled K2 14/12 (Board #1) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Single K1 07/12 (Board #2) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Single K2 07/12 (Board #2) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Coupled K1 07/12 (Board #2) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Coupled K2 07/12 (Board #2) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Single K1 14/12 (Board #2) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Single K2 14/12 (Board #2) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Coupled K1 14/12 (Board #2) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Coupled K2 14/12 (Board #2) D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 Other D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 P3-K1 latency scan Bunch spacing 187.6 ns → latency ~ 154 ns D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 P2 TShirt D. R. Bett FONT Meeting 10th February 2011

FONT Meeting 10th February 2011 P3 TShirt D. R. Bett FONT Meeting 10th February 2011