Open Access Pune Power Development Pvt. Ltd.. Contents:  Terminology  Open Access  Requirements for Open Access  Provisions made in Electricity Act.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Settlement system of Bilateral transactions under Open Access
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Open Access and Trading. Trading “Trading" means purchase of electricity for resale thereof” Any person is allowed to undertake trading in electricity.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Power Exchanges in India
Presentation Outline Indian Electricity Market
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “Open access” means the non-discriminatory provision.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
CERC Paper on Open Access Presentation by the MPERC Bhopal At New Delhi 25 September 2003.
Open Access In Interstate Transmission system
Power Exchanges in India. Power exchange ? A Power exchange facilitates equitable, transparent and efficient trading of power. Bridges the demand supply.
CERC (Power System Development Fund) Regulations 2010.
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
11/27/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
Sharing of Inter-State Transmission Losses 11/29/
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
12/7/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 WSPP EC SLIDES FOR AGENDA ITEMS 3 AND 4 WSPP SERVICE SCHEDULE C WSPP Service Schedule C includes a provision allowing interruption “to meet Seller’s.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
PROCEDURE FOR PROCESSING POWER EXCHANGE TRANSACTIONS AT NLDC CONTROL ROOM 1.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Settlement system for Collective Transactions (Power Exchange)
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
Point of connection Mechanism
Workshop on Open Access in Maharashtra Nagpur 14 th May 2016 For Public Use.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Open Access Power Purchase
Interstate Transmission system
Electronic Way Bill 1. Information to be furnished prior to commencement of movement of goods and generation of e-way bill.
Open Access.
Open Access.
The New Texas Wholesale/Retail Market
“ Open access / Power Exchange Regulations/experiences of SR ”
Sharing of Inter-State Transmission Losses
Congestion regulations
IN INTER-STATE TRANSMISSION
Pseudo-tie business procedure
Transfer of shares to Investor Education and Protection Fund
E-bidding for Short Term Open Access by – S
Settlement system under Open Access
Pseudo-tie business procedure
OPEN ACCES IN INTER-STATE TRANSMISSION.
Presentation transcript:

Scheduling of Collective Transactions Through Power Exchange

Presentation Outline Background General Steps involved in Scheduling Proposed Time Line Treatment of loss Congestion Management Commercial Conditions

Background CERC Regulations on Open Access in inter-State Transmissions, 2008 CTU to issue Detailed Procedure (Para 4) Prior Approval of Commission To cover relevant and residual matters

General NODAL Agency (at Regional Level) - NLDC All buyers within a State shall be clubbed together and all sellers within a State shall be clubbed together Each group considered as a single entity for the purpose of scheduling and operating charges at Regional Level SLDC shall count each point of drawal / injection separately for the purpose of Scheduling and operating charges Information Exchange Dedicated Communication Channel between NLDC and PX, NLDC and RLDCs PX to ensure Necessary infrastructure for information exchange with NLDC/RLDCs/SLDCs PX to indemnify all SLDCs/RLDCs/NLDC at all times

Eligibility Conditions Entities scheduled by RLDCs Deemed Regional Entity Entities whose metering and energy accounting done by RLDCs/RPCs New Entities To Satisfy conditions as laid down in CERC Order 58/2008 dated 07.05.2008 Obtain Prior Approval from RLDCs/RPCs Entities scheduled by SLDCs SLDCs to assess TTC/ATC for their State system Prior Consent from respective SLDCs Standing Clearance / NOC As per format in detailed procedure

Scheduling Process - Steps Involved NLDC to indicate interfaces/control areas/ regions likely to face congestion, if any Power Exchange to submit flows on interfaces, control areas, regions based on unconstrained solution. NLDC shall check provisional solution for congestion at any of the interface/control area/regions. In case of congestion, NLDC shall intimate to Power Exchange Duration (Time blocks) during which congestion is there Available Margins on different transmission system during the period of congestion

Scheduling Process - Steps Involved Power Exchange to honour all the constraints and send Request for Scheduling of Collective Transaction NLDC will once again check if the constrained solution is within the margin intimated NLDC shall inform Power Exchange about acceptance of the Scheduling Request. After acceptance, NLDC will send the file to RLDCs for scheduling. Power Exchange to send files directly to the SLDCs for scheduling (intra-state entities/state utilities) with detailed break up of each point of injection and drawal.

Information exchanged over leased line between NLDC and PX Power Exchange SLDCs Constraints, if any Acceptance by NLDC Information exchanged over leased line between NLDC and PX Final Trade Results for State Utilities & Intra State Entities to be sent by PX directly to SLDCs Provisional Solution Request for Scheduling N L D C Trades Schedules Trades Schedules Trades Schedules Trades Schedules Trades Schedules Over WAN SRLDC WRLDC NRLDC ERLDC NERLDC Over Internet (RLDC Website) Schedules Schedules Schedules Schedules Schedules Constituents Constituents Constituents Constituents Constituents

Time Line Time Line of Collective Transaction through PX To be dovetailed with the existing time line of Scheduling by RLDCs/SLDCs

Present Time Line for Scheduling 09:00 10:00 15:00 18:00 22:00 23:00 Availability Declaration Entitlements Requisition & Bilateral Agreements Injection Schedule Drawal Schedule Revision in DC Revision in Requisition Final Injection Schedule Final Drawal Schedule 0 to 24 hours Revisions during Current day Revisions during Current day 23-Jun-18 POWERGRID - NRLDC 10

Proposed Time Line for scheduling of Collective Transaction 10:00 12:00 12:30 13:30 14:30 15:00 18:00 RLDCs/SLDCs to incorporate Collective Transactions in the Daily Schedule NLDC to confirm acceptance. PX to send files to SLDCs for scheduling Market Participants to place their Bid NLDC to check for congestion. In case of congestion shall intimate PX regarding to the period for congestion and available margins PX to send provisional unconstrained solution to NLDC and flow on TS as informed by NLDC PX to send Scheduling Request to NLDC based on margin specified by NLDC/SLDCs

SUBMISSION/PROCESSING OF APPLICATION Application for scheduling : Format-PX-II Summary of Collective Transaction Declarations Scheduling Request: Format- PX-III Each Region IR corridor At Regional entity Periphery Other Bid Area, Sub-Bid Area – if required.

TREATMENT OF LOSSES Both Buyers and Sellers to absorb losses Buyer draw less than Contracted Power (Contracted Power – losses) Seller inject more than Contracted Power (Contracted Power + Losses) Average Transmission Losses of the Region where the Entity is geographically located Additional Losses for Wheeling, if necessary To be notified in advance by NLDC Only for Injection

Real Time Congestion Management During Transmission Constraint Curtailment to relieve the transmission constraint Curtailment by - NLDCs/RLDCs At Regional Entity Periphery Within State boundary – SLDCs to decide Refund in Case of Curtailment Pro-rata ( only Transmission Charge) Settlement Directly between PX and Participants No Role of NLDC/RLDCs

COMMERCIAL CONDITIONS All Open Access Charges known upfront Application Fee – Rs. 5000/- per Application Payable along with the application Transmission Charge For ISTS – Rs.30/MWh to NLDC For State Network - directly to State Operating Charge Rs. 5000/ per transaction to NLDC ( for All RLDCs) Buyers & Sellers in a State to be clubbed separately Each Group to be counted as One Transaction by NLDC Each point of injection and drawal to be counted separately by SLDCs Payment by PX to NLDC By next working day To NLDC for use of ISTS – Electronic Transfer