Transmission Planning Update October 20, 2010

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
NTTG Report to TEPPC BiennialTransmission Plan.
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
1. SCG Members AESO Alberta Electric System Operator BCTC British Columbia Transmission Corporation.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1. SCG Members AESO Alberta Electric System Operator BCTC British Columbia Transmission Corporation.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
Page 1 PCC Meeting October 25, 2007 PCC and TEPPC Coordination of Roles and Responsibilities in Regional Planning Brian Silverstein and Robert Kondziolka.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 26 th, 2014 Salt Lake City, UT.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Montana Energy Summit Transmission Planning Process April 22, 2008.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
RASRS Report to Operating Committee July 15, 2015 Milt Patzkowski, Vice-Chair Remedial Action Scheme W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
Energy Gateway Gateway West Project Gateway South Project
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Transmission Expansion in the Western U.S. Transmission Policy, Incentives, and Expansions in the Western States Marcus Wood Stoel Rives LLP 900 SW Fifth.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
CCTA Process Review TAS Update – Feb 12th 2016
ColumbiaGrid EIM Analysis Work Group (AWG) Meeting July 5, 2011 Methodology, Results and Benefits.
Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
4/23/2018 Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration 1 - Define Congestion.
WestConnect Joint Sub-Regional Planning Group Meeting August 18, 2016
Eleanor Ewry Base Case Coordination Subgroup Chair
I-5 Corridor Reinforcement Project
Keegan Moyer Interim Manager, Transmission Expansion Planning
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Planning Committee- Map
Planning Coordinator Gap Update March 25, 2014
CCTA Process Review TAS Update – Feb 12th 2016
RPCG – 2026 CCTA Results and Next Steps
Planning Meeting November 4, 2010 Marv Landauer.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
AESO Update to PCC October 7, 2014.
Common Case Transmission Assumptions
Presentation transcript:

Transmission Planning Update October 20, 2010

Contents 2011 Biennial Transmission Expansion Plan Northwest Area Coordinator Study Team Activities Puget Sound Area Study Team Northern Mid-C Study Team Cross Cascades Study Team Wind Integration Study Team Development of WECC Plan

2011 Biennial Transmission Expansion Plan Draft report to be completed by the end of 2010 Board approval scheduled for February Current focus is on completing sensitivity studies Low Puget Sound Area Generation Closure of Centralia – Initial investigation only Further analysis of voltage stability issues Study Northern Mid-C area Transmission Plans 5-year light load case rerun with lower loads Effect of PSE’s Sammamish-Lakeside-Talbot upgrade

Northwest Area Coordinator A primary function of WECC is to create system models that are used for the planning and operation of the power grid 11 models per year WECC depends on “Area Coordinators” to develop portions of the overall WECC model. ColumbiaGrid officially began performing this function for the Northwest area on March 5, 2010 Previously performed by BPA BPA’s residual role ended on August 6 with the approval and posting of the final case that they had started WECC Base Case Coordination System to be implemented in 2012 will likely change the role of Area Coordinators

Northwest Area Coordinator –Activities to date Case development performance metrics (March-Oct) Four cases approved and posted on the WECC website Three additional cases under development CG web conferences with sub area coordinator participation Four previous web conferences Upcoming web conference November 9 Future web conferences to be held following each WECC SRWG meeting Under Discussion: CG to update already approved cases Prevent Northwest system model obsolescence Post updated data under the System Assessment website CG will perform system assessments for each new WECC planning case with updated data

Study Team Activities Puget Sound Area Study Team Northern Mid-C Study Team Cross Cascades Study Team Wind Integration Study Team

Area Plans – Puget Sound Area

Area Plans – Wenatchee Area Preferred Plan

Existing or Under Construction and Proposed Wind Resources

New Study Team Cross Cascades

Wind Integration Study Team Held a meeting on 10/14 Two main items Initiation of a task force to work on increasing dynamic transfer capability limits Request went out for technical support Several meetings planned with a Phase 1 report due in February Agree on how to calculate dynamic transfer limits Develop short and long-term ways to raise limits Completion of the report “Relative Northwest Benefits of Local vs. Remote Wind Generation”

Regional Transmission Expansion Planning Project (RTEP)

WECC Regional Transmission Expansion Planning (RTEP) project First interconnection-wide 10-year plan is on schedule to be completed in 2011 First 20-year plan is to be completed in 2013 WECC will not endorse specific projects or be involved in siting or cost allocation ColumbiaGrid supports this effort through participation on: TEPPC – Transmission Expansion Planning Policy Committee Responsible for developing the Plan - Jeff is a member and on the Steering Committee TAS – Technical Advisory Subcommittee Advises TEPPC - Marv is a member SWG - Studies Work Group Oversees completion of the studies - Marv is Chair Subregional Planning Group Coordination Group (SCG) Provides input to WECC from the subregional planning groups - Jeff is Chair

Subregional Planning Group Coordination Group (SCG)

FOUNDATIONAL PROJECTS BY 2020 Ver 1.0 - March 16, 2010 FOUNDATIONAL PROJECTS BY 2020 NTTG NTTG01 Gateway South Phase 1 NTTG02 Gateway Central Phase 1 NTTG03 Gateway West Phase 1 NTTG05 Hemingway – Boardman NTTG06 Cascade Crossing CG CG01 I-5 Corridor CG02 West McNary CG03 Big Eddy – Knight CG04 Little Goose Area Reinforcement BCH BCH01 Nicola – Meridian BCH03 BC-US Intertie Alberta AESO AESO03 1202L Conversion AESO04 Heartland AESO05 West HVDC AESO06 East HVDC AESO07 Fort McMurray - East Line AESO08 Fort McMurray - West Line CAISO CAISO02 Sunrise CAISO03 Blythe-Devers CAISO04 Tehachapi Upgrade SSPG SSPG02 SWIP South SSPG05 TCP Harry Allen - Northwest SSPG06 TCP Northwest – Amargosa SWAT SWAT01 PV-NG#2 SWAT06 Pinal Central – Tortolita SWAT07 Southeast Valley (SEV) SWAT08 PV - Morgan CCPG CCPG02 Pawnee – Smoky Hill CCPG03 Waterton- Midway CCPG04 San Luis Valley Alberta British Columbia AESO07 AESO08 Heartland AESO03 AESO04 Genesee Ellerslie AESO06 AESO05 Langdon Nicola Meridian BCH01 West Brooks Ingledow BCH03 Custer Washington CG02 CG04 Montana Castle Rock Lower Monumental Central Ferry CG01 Big Eddy CG03 Knight Troutdale McNary John Day Coyote Spgs Bethel NTTG06 Boardman NTTG05 Idaho Oregon Hemingway Midpoint Wyoming NTTG03 Populus Aeolus NTTG03 NTTG02 Bridger Terminal NTTG01 Oquirrh Pawnee Nevada Limber CCPG02 Robinson Mona NTTG01 Waterton Smoky Hill Sigurd CCPG03 California SSPG02 Midway Utah Colorado Amargosa SSPG05 Red Butte Comanche Legend 500 kV Single Circuit Line 345 kV Single Circuit Line 500 kV Double Circuit Line 345 kV Double Circuit Line DC Circuit (various voltage) Termination Substations Intermediate Substations Calumet Highwind SSPG06 CCPG04 Northwest Harry Allen CAISO04 Antelope Windhub Eldorado Arizona Pardee Vincent Devers SWAT08 Morgan Blythe CAISO03 Browning SWAT07 New Mexico Peňesquitos Imperial SWAT01 CAISO02 Palo Verde North Gila II Pinal Central SWAT06 Tortolita Final - Ver. 7.0, July 22, 2010 (1) Map does not reflect 230 or 240 kV lines that are included in the Foundational Transmission Project List. (2) Internal reinforcements projects not shown for clarity. (3) Lines shown are for illustrative purposes only and may not reflect final line routing. Draft Document

Future SCG Activities Coordinate activities between SPG’s More formal review of neighboring SPG Plans Assist WECC by populating the Transmission Project Information Portal http://www.wecc.biz/planning/transmissionexpansion/transmission/Pages/default.aspx Assist WECC with the reliability analysis of the 10-year plan

Questions?