Arlington Traffic Management Plan

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
OVERVIEW AND SCRUTINY COMMITTEE SCRUTINY OF 20MPH SPEED LIMITS Rupert Thacker Team Leader – Forward Planning and Rail Liaison.
Arlington Traffic Management Plan Presentation to Arlington Parish AGM 19 th April 2012.
Adur & Worthing Services working in partnership IMPROVING THE STREET SCENE WEST SUSSEX COUNTY COUNCIL CONFERENCE Wednesday 7 th June 2006 PRESENTATION.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Southall Traffic Congestion and Parking Provision Specialist Scrutiny Panel 21 November 2006 Transport Planning for Southall.
20 mph - The Cambridge Experience John Richards Acting Project Delivery & Environment Manager.
16 October London Borough of Merton Transport Liaison Robert Pontin.
Scrutiny Presentation Local Transport Plan and Active Travel Strategy 24 th October 2013 Andy Summers and David Burt.
Shenstone Neighbourhood Plan Working Groups launch event 18 th June 2013.
21st October 2015 Stillorgan Village Area Movement Framework Plan PUBLIC CONSULTATION INFORMATION PERIOD DOCUMENT.
Neighbourhood Development Plan December 1 st, 2013.
Neighbourhood Development Plan Parishioner Update & Consultation April 6 th, 2014.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Brownfield Register Making Data Standards Work Kevin Flanagan April 2016.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
Kensington and parts of west Kinsgford PAMP Workshop: 22 nd June 2010.
Moloto Road (R573) Safety Investigations
Scenic Highway – Public Meeting
#YDF2017.
East Sussex Strategic Partnership Transport Update 25 April 2017
Feedback – key themes : Traffic
Community Speed Watch (CSW)
Cambridgeshire Homelessness Trailblazer MoU workshop
Bristol’s 20 mph experience Peter Mann Service Director, Transport
Making a Plan Creating a Vision Ensuring a Positive Future
Sources of Road Danger and a Vision Zero approach
I-280 Corridor Study and I-280/Winchester Blvd Project
Introduction to the Victorian state disability plan 2013–2016
Safeguarding Adults in Sport
Simon Williams Footprint Futures 2 November 2015
M1 J32-35a 60mph through Roadworks trial
Concept Plan for Proposed Park Near Hopewell School
The Plan - Information Stage 1
A Vision For Camberwell – Improving Streets and Public Spaces In SE5
Ministry of Transport Viet Nam
Neighbourhood Traffic Calming Open House
SIZEWELL C: STAGE 2 CONSULTATION
The Regeneration of Swanley
JMP EDA Transport Study South Marston Samantha Howell Principal Transport Planner Strategic Growth and Regeneration Team.
Module 1 A Nationally Emerging Practice
Future Village development key requirements
Shaping the future of Laverstock and Ford Parish
KEYNOTE STAGE SPONSOR.
Stockport Work and Skills Commission
City of Wilmington Bike Plan Update
YOUR PLAN, YOUR FUTURE, OUR UNION 2023
Winkleigh Neighbourhood Plan What is the Neighbourhood Plan?
Public Consultation on Traffic Calming in Gifford
Promoting Walking in Bermondsey
Bicycle and Pedestrian Update to City Council
Your Neighbourhood Consultation on changes to local services
Windshield and Walking Surveys
Strategic Plan Implementation July 18, 2018
Building Statistical Capacity UNSD perspective
Review of Auckland’s Signage Bylaw 2015
Simon Hairsnape Chair – Burghill Parish Council
WHY A NEIGHBOURHOOD PLAN?
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Agenda – What we will be covering today
Woodstock Community and Infrastructure Delivery Plan
Do Roads Connect or Divide? The Other Side of the Road
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Suffolk Chamber of Commerce Transport & Infrastructure Group
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Histon Road LLF Resolutions and Programme
Presentation transcript:

Arlington Traffic Management Plan Presentation to Arlington Parish AGM 19th April 2012 Good Evening, and it is very good to see everyone here. Some of you have participated greatly in the process of developing this Arlington Traffic Management Plan, and I think most of you will have seen our updates on Dicker Links, been part of our consultation and be at the presentation of the Interim Report on January 20th of this year. I do want to thank, very sincerely, all of you who worked on the survey last May, and in particular the members of the Traffic Management Plan Action Group who have contributed their huge local knowledge and personal skills. We have a certain amount of information to communicate to you in the next 15 minutes, so that we can understand, and then agree on a way forward to implement our Arlington Parish Traffic Management Plan. My name is Jenny Holland, facilitator of the TMP – Traffic Management Plan, and my colleague here with me is Ray Collins who has made all the data analysis for the TMP. His help has been invaluable. Thank you for your attention, and off we go .....

Why we have developed a TMP History of traffic management issues Noticeable increase in traffic volume Arlington Parish Plan 2008-2009 - “to tackle traffic, transport & speeding problems to ensure safety” in the Parish An aim to create a 40-30-20 mph speed limit throughout the Parish Before my time, Parish members and Councillors were concerned about increasing traffic flows, but in recent years, with the expansion of St. Bede’s and increased traffic volumes on the A 27 & A22, our Parish, and Berwick have become subject to an increased volume of THROUGH traffic from Drusilla’s Roundabout on the A27 to Coldharbour Road and the A22. Also, from the A22 coming through Arlington Road West and Michelham Priory Road to the Dicker and down to the A27 have been a cause for concern. This concern was chrystalised in the Arlington Parish Plan of 2008 -2009 which stated the need ‘to tackle traffic, transport and speeding problems to ensure safety’ in the Parish, and to establish the aim to create a 40-30-20 mph speed limit throughout the Parish

Kick-starting the TMP & its progress from 2011 - 2012 St. Bede’s Sports Fields’ & Boarding House developments – DRA Clause 16 Wealden District Council’s demand for a St. Bede’s Master Plan Arlington Parish Plan Action Group (APP AG) agreed to initiate a TMP process, begun in January 2011, resulting in an Interim Report in January 2012, & today’s Parish agreement of our way forward in implementing our TMP The consultation on St. Bede’s Sports Fields’ planning permission – adjacent to Michelham Priory Rd -

The TMP’s Strategic Aim To reduce traffic volume and manage what traffic does travel through the Parish Traffic that comes INTO, & uses our facilities, & creates economic development is acceptable, BUT traffic that goes THROUGH the Parish & does not give us positive economic development, but rather, a negative environmental impact is not acceptable

How we developed this TMP process Implementing a Data Survey process to assess the volume & direction of traffic through the Parish – 10th May 2011 Data Survey Analysis – Summer 2011 Implementing a Stakeholder Consultation process – June – December 2011 TMP AG meetings to discuss research & develop TMP proposals

Survey Data Analysis Ray Collins presents his summary 1. TMP Survey – 10th May 2011 2. ESCC TMT – 14th – 23rd May 2011 3. St. Bede’s (the Dicker) School – 15th & 18th June 2011

Headline results 5800+ vehicles per day in / out Parish 3 points represent 76% each way. A27 - Berwick, A22 / Lower Dicker and the A22 / Arlington Road West 48,000 vehicle movements in 9 days = 3.69 movements per minute (MPM) There is an average of 2,456 vehicles per day where the speed limit is exceeded. Arlington Village is being used as a rat run Some 4,000 pedestrian movements take place across Coldharbour Road. No measurement has taken place of the pedestrian movements between the school and the playing fields.

Stakeholder Consultation Discussions with St. Bede’s, Park Mead School, ESCC Highways, the Police, Upper Dicker Village Shop, Berwick Parish & among members of the TMP AG centred on the key traffic management issues of – Speed of traffic Volume of traffic Parking

Speed The TMP Aim is to campaign for a 20-30-40 mph speed limit throughout the Parish – 20 mph – around our schools & centre of Arlington Village 30 mph – in our wider settlements 40 – in remaining Parish

Challenges to our aim ‘C’ Roads – No government review until 2014 Accidents & casualties make a difference No funding from ESCC Highways Reducing through traffic from A27 to A22 & A22 to A 27

Volume Traffic Surveys demonstrate level of traffic traversing our Parish Reducing speed can reduce volume of traffic “Barriers” to traffic – calming measures, signage, gates

Parking Park Mead and St. Bede’s Schools The WISE site Coldharbour Road & Upper Dicker Village Shop/Village Green

Parish Agreement on Way Forward (1) Overall TMP Principle Proposals – Manage traffic to reduce traffic volume & its speed Work in partnership to achieve overall specific aims – APC, adjacent parishes, ESCC, WDC & St. Bede’s School Beware that a solution at one point can negatively impact at another point

Parish Agreement on Way Forward (2) Specific Speed Reduction Proposals are – Institute a 20 mph limit in school areas & the centre of Arlington Village Institute a 30 mph limit instead of 40 mph from brow on Michelham Priory Road (East of Park Mead to current 40 mph sign on the East side of the single file bridge Institute a 40 mph limit in particular at Lower Dicker/Coldharbour Road & at Wick Street

Parish Agreement on Way Forward (3) Specific Proposals continued – Institute ‘calming measures’ (shared space, signage, coloured road junctions) to achieve speed limits and volume reduction Increase clear space either side of Upper Dicker Village Green exit to increase visibility Change road layout at Lower Dicker/A22 exit

The Dicker Crossing - present

The Dicker Crossing - 2013

It can be done! Ringmer Hartfield

Next & Future Action Campaign for our TMP aims by taking the agreed TMP Action Proposals to – APC, ESCC, WDC – Autumn 2012 & beyond Work with our adjacent Parishes – Berwick, Hellingly & Alfriston to achieve our common aims – June 2012 & beyond Build a partnership with the APC & St. Bede’s Trust to implement an agreed TMP