When the river runs high:

Slides:



Advertisements
Similar presentations
RIVER DRAINAGE BASINS.
Advertisements

Native Vegetation Act operation in practice and biodiversity protection in fire prone areas Craig Whisson Department of Water Land and Biodiversity Conservation.
Partnership Acknowledgment
Reconfiguring the River The 4 th Annual Water Symposium, 20 February 2009, Darling Harbour, Sydney Prof Mike Young, Executive Director Research Chair,
1. 2 Montlhy and biannually, USA provides information about forecast and status of Colorado River Basin. Since 2000, drought in the basin caused low levels.
IAL Conference, June 2012 Irrigation Modernisation: A Partnership Approach in the SA Murray-Darling Basin Region Brenton Fenwick 1 and Michael Cutting.
Gabriela Aguiar & Maria Fernanda Suarez. Is converting salty seawater to freshwater the answer? Chapter 13 Section 5 We can convert salty ocean water.
Unimpaired connectivity between active channel and floodplain Eliminated connectivity between active channel and floodplain Impaired connectivity between.
DRAFT MURRAY DARLING BASIN PLAN. Where is the Murray–Darling Basin? Large system in south-eastern Australia 1 million km 2 1/7 area of Australia Contains.
Management of Commonwealth environmental water in the Murray-Darling Basin, Australia David Papps, Commonwealth Environmental Water Holder Environmental.
1/38 Urban Flood & Climate Change ----information from APWMF and SIWW Jinping LIU Hydrologist Typhoon Committee Secretariat.
Balancing water use for food and the environment: Looking to the North based on lessons from the South Gary Jones Chief Executive, eWater Adjunct Professor,
Australia, an academic perspective Associate Professor Garry Middle, Head Department of Urban and Regional Planning, Curtin University, Western Australia.
Tools to Inform Protection, Restoration, and Resilience in the Hudson River Estuary The North Atlantic Landscape Conservation Cooperative (LCC)
Run of the River Introducing a healthy rivers board game Proudly presented by: Swap with Regional WW logo.
Sharon Starick Presiding Member, SA Murray Darling Basin Natural Resources Management Board.
 The Living Murray. What is The Living Murray?  The Living Murray is one of Australia’s most significant river restoration programs. It aims to improve.
Environmental water requirements Surface water. From Guide to Plan Guide proposed reduction in diversions from 3000 to 4000 GL Reductions based on simplified.
Colorado River Management. Examine the competing demands for water in a specific river basin. Evaluate the strategies that have been adopted to meet these.
Environmental watering – How is it the same or different from floods? Denis Flett Chairperson, Victorian Environmental Water Holder Friday 14 November.
“THERE IS NOT ENOUGH WATER IN THE SYSTEM TO DO EVERYTHING WE WANT” CONFLICTS.
Bow Basin Watershed Management Plan Revised Terms of Reference
environmental water management framework
Top Five Reasons Three Valleys Needs WaterFix
Rare Cliffs and Alvars.
When the river runs high:
Clayton Cox, AAAS Science & Technology Policy US EPA
NARI NARI TRIBAL COUNCIL
Environmental watering – CEWH 2016
NSW Wetland Recovery Program
Modelling environmental flows in Source River System models
Making a big difference for a little fish (Murray hardyhead)
What are the solutions for the water crisis?
Commonwealth Environmental Water Holder
Perin Davey, Corporate Affairs, Murray Irrigation Limited
River Conwy - flood management
Climate and Green Plan Town Hall Toolkit
Save Maryland’s Forests: Forest Conservation Act (FCA) Bill
Using Models to Explore Options for Middle Oconee River Management
Place your logo here WERRIBEE RIVER
Blue-Green Cities, Urban Flood Resilience and Learning and Action Alliances Emily O’Donnell Urban.
36 CAs across Ontario (mainly in the south)
Murray-Darling Basin, Australia
FIRES IN RIPARIAN AREAS AND WETLANDS
Year 8 – Summer Term Knowledge booklet Knowledge checker
Innovate. Improve. Grow. WEAVER: HEXAPOD ROBOT WITH 5DOF LIMBS FOR NAVIGATING ON UNSTRUCTURED TERRAIN.
Understanding cultural flows:
Sustainability in a Challenging Climate NRM Regions Queensland
Last test… WATER! Chapter 9 – Surface Water Chapter 10 – Groundwater
Top Five Reasons San Gabriel Valley Needs WaterFix
4.2 What is inland water?.
Navigating the waters towards greater support for environmental flows:
Making every drop count Optimising outcomes through coordination
Top Five Reasons Three Valleys Needs WaterFix
Nadine Kilsby, Michael Field, James Peters
Water Resources.
Intro to yourself and the North Central CMA
Verde River Flow Restoration Initiative Colorado River Program
Good practice from Australia
Delivering Conservation
Water Use.
Climate Resilience and Transportation Planning in KC
Novel evapotranspiration model to inform future water management using past riparian vegetation trends Tanya Doody, Micah Davies, Garth Warren, Martin.
Springsnail Conservation in Nevada and the Great Basin
Item 2.2 Guidance Document on RBM in a Changing Climate
Water Prof. Mike Young Research Chair, Water Economics and Management The University of Adelaide Some Like it Hot, Renmark, 6th November 2008.
Consumer Conversations and Aged Care Standards
Health Impact Assessment in NSW
Meg Strang & Peter Verwey
UK experience of Programmes of Measures
Presentation transcript:

When the river runs high: Two case studies illustrating how an environmental water program responds to a high river Acknowledge Traditional Owners past and present, and their continuing connection with the land we meet on today. Acknowledge: Anne Jensen Ian Atkinson I am not an ecologist or hydrologist. Natalie Stalenberg, Program Manager Water for Nature BRISBANE, AUSTRALIA | 18 - 20 SEPTEMBER 2017 MANAGED BY

Murray-Darling Basin

We have delivered 6.22 Gigalitres since 2013 SA River Murray Valley – boasts 1100 wetlands and floodplains Government agencies – focus on icon sites and big projects Nature Foundation SA’s Water for Nature program: Work with community & focus on smaller sites Focus on mainly native vegetation i.e. Black box Eucalyptus largiflorens and river red gum Eucalyptus camaldulensis Focuses on sustaining benefits of past natural floods Partnership with Commonwealth Environmental Water Holder Nature Foundation SA is an environmental charity – 36 years old - came about from a recognition that governments alone cannot save, protect or restore all of nature The Water for Nature program adopts this same attitude We work with local landholders on private land, but also some local and state government sites Started in 2008 during the millennium drought when we purchased a small 34 ML of water to water trees at Hogwash Bend Focus on native vegetation – river red gum, black box trees and lignum shrublands 2012 Agreement with Commonwealth Environmental Water Holder to deliver up to 10 Gigalitres per year of environmental water Since 2013 we have delivered 6.22 Gigalitres – or 6.22 billion litres of environmental water to around 50 sites We have delivered 6.22 Gigalitres since 2013

Riverland sites Locks and weirs along sections all along the river – that means the river cannot run its natural course or to its natural extent Our sites rarely get wet unless you physically pump water to them Each site has a water regime based on its objectives and the needs of those objectives – those objectives help in meeting the broader and higher level Murray Darling Basin Plan environmental objectives and the objectives of the CEWH

2016 High River In June 2016, we planned to deliver up to 6,440 megalitres of water for use across 50 sites River Murray of 95,000 ML at the SA border in December 2016. Many watering sites naturally inundated, or access restricted due to water covering tracks and culverts Total environmental water delivered 1,657.26 ML to 16 sites in the SA River Murray Valley. In June 2016 no one was expecting a flood and South Australian irrigators had a reduced water allocation. It wasn’t until September that we realised that we may end up with more rainfall in the Murray-Darling Basin than expected, and that good flows were expected for SA. Irrigators ended up with 100% allocation, and many of our lower wetlands were naturally inundated. However, after much uncertainty it turned out to be a short lived high river – not really a flood in SA as it was in parts of the eastern states It was a very dynamic time – and our program was required to adapt to it. Our program when from 6.5 Gigalitres across 50 sites to 1.6 Gigalitres to 16 sites This about adaptivity!

Natural high river flows 80-90,000 Megalitres a day When there is a high river / flood - some wetlands and floodplains higher up in the river system may still miss out – we adopt a ‘natural cues’ approach and target these ones to get water to stressed native trees and wetlands. Why water at all during a high river? Take advantage of the flood to get water to higher sites Prolong the benefits of the high river event Extend the reach of the high river River channel Natural high river flows 80-90,000 Megalitres a day Diagram adapted from Department Water, Land and Biodiversity Conservation (SA)

Case study 1: Woolpolool Swamp An ephemeral swamp that had not flooded since the 1980s. Objectives: water fringing black box trees, replenish the freshwater lens, flush accumulated salt and provide a temporary wetland for waterbirds and frogs. Lake Meretti Lake Woolpolool Partner with Australian Landscape Trust This site wasn’t initially on our list to water in 2016-17 but in adapting to the high river we realised we could get water to it and give it its first decent drink since the 1980s. Note where the site is and the distance from the river (about 3km ) – naturally the swamp was connected to the lakes on either side. We had approximately 2-3 weeks to mobilise the site State and commonwealth government approvals Assess the environmental objectives Assess the logistics Murray River

574.40 Megalitres environmental water delivered in December 2016 BEFORE AFTER Had planned to deliver 2000 ML to the site, but the high river cut off access to the water pump – so 574 ML It’s a bit early to make a full assessment on the environmental response, given the trees have had a long time without water – but some trees have shown a response with extra foliage and flowering, and some trees have not shown any improvement. Maybe differences in where the trees are getting water from in terms of groundwater, or salinity So this is a watch and see site 574.40 Megalitres environmental water delivered in December 2016 Result: Some trees showed good improvement others showed only increased flowering, while some trees showed no improvement at all. This has been a valuable exercise for assessing effect of e-watering on trees in different locations.

Case study 2: Lyrup Lagoon Lyrup Lagoon lies at the upstream end of the Gurra Gurra wetlands complex, which covers 3000 ha of floodplain between Lyrup and Bookpurnong. Objectives to water May-June 2017: Prolong benefits of high river Habitat for waterbirds Freshening of saline lagoon Prime site for spring/summer natural event or follow up watering Lyrup Lagoon River Murray This site did get water at the peak of the high river for a short period of time, the lagoon filled and then started to recede. We wanted to prolong the benefits of that high river – or piggy back onto it to top up the lagoon. Acting in partnership with Central Irrigation Trust, we use irrigation infrastructure to deliver Commonwealth environmental water to the site. The network of existing pipes is enabling us to deliver water to sites we wouldn’t normally be able to get to. We watered Lyrup Lagoon in May-June 2017 to prime the lagoon for spring/summer natural event or follow up watering.

Results: Salinity readings were taken by CIT staff at Lyrup Lagoon towards the end of the priming event. Readings show a significant freshening of the lagoon itself, with readings at Tortoise Crossing within normal range for this site. Pumping ceased at 110 ML of the expected 150ML goal so as to prevent water covering a nearby culvert We ended up delivering 110 ML into the lagoon. hundreds of waterbirds were observed at the lagoon during May and June. Including pelicans, grey teal, and welcome swallows. Salinity readings: Water flowing in at the outlet was 369 EC 200m south of outlet was 7,980 EC Approximately half way to Tortoise crossing 8,890 EC At Tortoise crossing 14,230 E (Electrical conductivity – intensity of dissolved salts in the water)

Challenges Predicting the extent, timing and duration of the high river and the impact on potential watering sites Logistical issues: Landholder permission (public or private) Government approvals for new sites Heavy equipment River peaks and then retreats quickly Inundation of third-party roads etc Monitoring watering events to prevent loss of access to locals

Solutions Working with local community organisations and irrigators: Local knowledge & people networks Use existing infrastructure Seeking technical advice from government High rivers can provide opportunities to water higher and thirsty sites with good ecological benefits Pays to develop a ‘library’ of watering sites for a dry, moderate, wet year Now have a draft five year environmental watering strategy – that Dr Anne Jense has helped us to develop. This means that in future years as the river changes we can adapt to it a lot quicker and a lot easier by simply identifying which our sites we should water as conditions change. Much like a library of books, we can select which book we want take off the shelf. (not my analogy)

Partners/Sponsors Thank you