Catania Jan ’14 KM3NET Italy Marine Operations CTF change out

Slides:



Advertisements
Similar presentations
HOW SIFA WORKS. Step 1 Plans are given to Restaurant & Bar Solutions These can be on CAD, or even hand drawn, with dimensions and ideal layout.
Advertisements

Source One Source One Network and Building Solutions.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
KM3NeT-IT The Capo Passero Infrastructure M.Anghinolfi –INFN-Genova.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Claire Gibson, Wave Hub General Manager 19 February 2013
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
Impacting Your Kitchen Carbon Footprint June 2009.
Talent Dynamics Pathway. 12 month Talent Dynamics Pathway for a Performance Consultant - March 2012 Outcomes Generate additional business (min £35,000.
1 CRITICAL ROTATING EQUIPMENT CRITICAL ROTATING EQUIPMENT PACKAGES – 12 FOR POWER GENERATION INCLUDING STEAM TURBINES and 14 FOR GAS COMPRESSION.
Subsea Connectivity and Distribution Will Mudge - Teledyne ODI October 2009.
LLU Update Elizabeth Wilks-Wood Compliance Directorate.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
The NEMO Project: Toward a km 3 Neutrino Telescope in the Mediterranean Sea M. Circella, INFN Bari NUPPAC-05, Nov The NEMO Project (NEutrino Mediterranean.
 NEMO The NEMO Status Report M.Taiuti on behalf of the NEMO Collaboration Merida, Yucatan, Mexico 30th International Cosmic Ray Conference.
Rudan ltd. For efficient energy management. Our Vision With efficient management and application of new technologies, to become a leading company in the.
Rachael Ellis Director Ocurem. Typical tender questions... & how to answer them!
Connecticut Education Network “Forum” June 14, 2001.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
DIT Campus Network Final Presentation Team Members Honoratha Shayo Vincent Jacob Ivan Masue Fredrik Andersson Ombeni Mnzava Sylvester Kimbi.
Our Success in Procurement Tenders David Noone Managing Director, WMS.
1 Office Interactions with Physicians’ Offices Physician Offices.
G. Riccobene, INFN-LNS Nikhef, May 24-25, 2012 Giorgio Riccobene INFN-Laboratori Nazionali del Sud Abyssal undular vortices in the Eastern Mediterranean.
What? Deployment of the first full KM3NeT string, a.k.a Detection Unit. Thanks to Aart Heijboer for the nice drawings!
Maintenance Delivery Peter Beasley Maintenance Delivery Manager Property Business Services Surrey County Council Tel:
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
教育卡(电子卡) 身份信息认证指导 (学生). 身份信息认证渠道 教育卡管理中心为学生提供了 “ 教育卡官方网站 ” 和 “ 教育人人通客户端 ” 两种认证渠道。 1 教育人人通客户端 2 ●● 您可以在教育卡网站的 “ 人人通客户端 ” 版块下载江苏教育人人通客户端。
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
Euromed October 2010 A Flexible Desalination Solution.
Servelite - Complete IT Solutions. Servelite IT solutions specialize in providing Home solutions and Business solutions. We focus upon delivering quality.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
WPH goals: prepare the specifications for the main components of the deep-sea infrastructure: - Main electro-optical cable (MEOC); - Power transmission.
Marseille 30 Dec ’13 KM3NET Marine Operations Catania - Status Klaus Leismüller.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
Ability To Deliver E2E Turnkey Solution 03 of 30.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Operational Stakeholder Engagement Forum ESA Health and Work Conversation and Claimant Commitment 6 March 2017 Presented by: Ian Anderson and Matt.
Technical Review Organization, Strategy and Report Klaus Leismüller
Data Center Stabilization
Subcontracting funding rules: scenarios
Digital Campus: Foundation Projects
Status Optical System KM3NeT
Career Mentoring Program
Award Contract.
Els de Wolf 20 February 2012, Catania
Strategic Alliance Contract Northern Improvement
Junction Boxes for KM3NeT
SC of KM3 Vidyo meeting of Thursday, February 18
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Catania 20 Feb ’13 KM3NET Marine Operations Catania - Status
TECHjOSH.COM TechJosh.com.
How to Install an old version of Adobe Reader on Mac OS.
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
THE ANTARES SITE SECONDARY JUNCTION BOX
Housing Rehabilitation (Remodeling)
How to install hotspot server in stand-alone pc
Lecture 10 PROCUREMENT Ferdinand FASSA.
KEY ACE OPERATIONS INFORMATION
Make Ten Example: Name: ______________________
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
= x 2 = = 20 4 x 5 = = 16 4 x 4 = = 18 6 x 3 = = 12 2 x 6 = 12.
CLASSROOM PROJECTION SYSTEM
Use the ten frames to help solve the problems
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Catania Jan ’14 KM3NET Italy Marine Operations CTF change out Klaus Leismüller

CTF change out – L3 feedback Turn key solution/Technical requirements “AS IS” (see drawing) INFN MVC L3 splitter box and CTA L3 Frame In: INFN subsea cable Out: ODI hybrid NRH 4 fiber, 2 electrical, PC type, key alignment: facing down Extensive qualification experience Tested and proven solution with reference projects. INFN is not the ‘test’ client. L3 has broad experience building sea bed networks Delivery 9 months after contract award

CTF

Capo Passero Site Condition

Installation sequenze

Installation sequenze

Thank You!

Marine Operations Tender has been answered. Evaluation 20/21.01.2014 Marine Operations Window March to October 2014 Equipment to be delivered to Malta minimum1 week prior to deployment Testing of equipment onshore mandatory