Disaster Resilience: Pre-Event Planning for Recovery

Slides:



Advertisements
Similar presentations
International Course on Development and Disasters with Special Focus on Health February 10 – 21, 2003: St Anns, Jamaica CDERA Experience in Institutional.
Advertisements

Synthosys, LLC URS November 2012
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
FEMA’s mission is to support our citizens and first responders to ensure that as a nation we work together to build, sustain, and improve our capability.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
Update Training Meeting
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Alachua County Post-Disaster Redevelopment Plan Alachua County Board of County Commissioners Meeting April 27, 2010.
PROCEDURES FOR SELECTING THE CONTRACTOR
Understanding Multiagency Coordination IS-701.A – February 2010 Visual 2.1 Unit 2: Understanding Multiagency Coordination.
Crisis Management Planning Employee Health Safety and Security Expertise Panel · Presenter Name · 2008.
EASTERN MICHIGAN UNIVERSITY Continuity of Operations Planning (COOP)
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
National Disaster Recovery Framework. National Disaster Recovery Framework Reasons for establishing the Framework Past large-scale recovery efforts revealed.
Part of a Broader Strategy
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
ISA 562 Internet Security Theory & Practice
Planning for Resiliency. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster and.
Partnership Analysis & Enhancement Tool Kit Cindy S. Soloe Research Triangle Institute (RTI) April Y. Vance Centers for Disease Control and Prevention.
Streamlining – The Need: Costs Saved and Lessons Learned Facilitating Disaster Preparedness, Response & Recovery.
NFPA 1600 Disaster/Emergency Management and Business Continuity Programs.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
CDERA The Caribbean Disaster Emergency Response Agency INSTITUTIONAL CAPACITY/REFORM Presentation by Mr Jeremy Collymore Coordinator, Caribbean Disaster.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Ricardo Zapata ECLAC 1 Quality and methods of field data collection: Presentation of ECLAC methodology: why it works and when it does not Expert consultation.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Introduction to the Emergency Operations Center City of Santa Cruz 2011 EOC Training and Exercise.
Healthcare Coalitions. John Heywood English Writer
Bill Hubbard Southern Regional Extension Forester taking the urban forest to the next level.
Maximising Risk Reduction and Resilience throughout the Disaster Management Cycle Bill Thomson, Associate Director, QLD October, 2012.
Community Resilience Jill J Artzberger, MPH 2011 Texas Emergency Management Conference Thursday, April 28, 2011.
Pipeline Safety Management Systems
Operationalizing the National Disaster Recovery Framework Resources for State Governments Andrew O’Neil, Interagency Coordination, FEMA
Community Health Centers of Arkansas Hazard Vulnerability Assessment Workshop August 11, 2017 Mark Fuller.
Article by Caroline Moser
Oregon State Rail Plan Update
John Deere Supply Chain Risk Management
Understanding Transportation Resilience: A Roadmap
Emergency Operations Planning
5 OCTOBER 2015 MANILA, PHILIPPINES
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Why Special Events are Special
Draft Transportation Element September 6, 2017
Unit 2: Recovery Pre-Disaster Planning Guidance for Local Governments
COMPREHENSIVE SCHOOL SAFETY MONITORING TOOL
The Urban Forest Management Plan
“The Link” - Continuity of Operations and Emergency Management
Accreditation Update Regional Municipality of Durham March 15, 2018.
2017 Health care Preparedness and Response Draft Capabilities
The present scenario Disaster management-primarily responsibility of the States Central assistance to the affected State as per established norms During.
CRUE – The Way Forward Vicki Jackson
Public Health Department Fakultas Kedokteran Universitas Padjadjaran
United Nations Development Programme
Societal resilience analysis
Introduction to: National Response Plan (NRP)
SOUTH AFRICAN INSURANCE ASSOCIATION
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
COMPREHENSIVE SCHOOL SAFETY MONITORING TOOL
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
Capital Improvement Plans
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
Unit 7 Documentation Documentation
The Foundation of Capability:
Unit 6- IS 230 Fundamentals of Emergency Management
Disaster Preparedness and Resilience
Disaster Site Worker Safety
MODULE 11: Creating a TSMO Program Plan
Unit Terminal Objective
Disaster Recovery Operations
Presentation transcript:

Disaster Resilience: Pre-Event Planning for Recovery Philippines Supply Chain Resilience Symposium and Workshop October 5 – 7, 2015 Patricia Bye Western Management and Consulting

Philippines Supply Chain Resilience Symposium and Workshop Today’s Agenda Disaster Resilience Benefits of Pre-Event Planning Keys to Success Best Practices Goal is increased supply chain resilience through proactivity, awareness and understanding. Philippines Supply Chain Resilience Symposium and Workshop

Philippines Supply Chain Resilience Symposium and Workshop Disaster Resilience Resilience is the ability to resist, absorb, and recover from the effects of a hazard in an efficient manner. UN International Strategy for Disaster Reduction Organizational capacity build-up Policy and institutional support Prompt and sustained restoration in aftermath Philippines Supply Chain Resilience Symposium and Workshop

Philippines Supply Chain Resilience Symposium and Workshop Why Prepare BEFORE Reduce or eliminate the problems of trying to locate required capabilities More efficient when resources, contractors, and options are already identified Enhanced speed by establishing relationships before an event occurs Philippines Supply Chain Resilience Symposium and Workshop

Lessons Learned: Principles Response can impact recovery. Short-term approaches have impact on long-term recovery. Early decisions determine the minimum recovery time achievable. Rebuilding is an opportunity to improve infrastructure and incorporate resilience. Incorporate flexibility and identify alternatives. Philippines Supply Chain Resilience Symposium and Workshop

Philippines Supply Chain Resilience Symposium and Workshop Keys to Success Restoration of economic supply chains depend on timely debris removal and efficient detours. Using a phased approach, temporary solutions and multi-optional approaches can expedite recovery. Limit scope to reduce complexity. Effective practices include: Identification of repair and replacement approaches in advance Prequalification of contractors Expediting contracting and construction approaches Incorporating accelerated construction technologies Philippines Supply Chain Resilience Symposium and Workshop

Philippines Supply Chain Resilience Symposium and Workshop Timely Debris Removal Philippines Supply Chain Resilience Symposium and Workshop

Philippines Supply Chain Resilience Symposium and Workshop

Major Decisions and Key Tasks: Infrastructure Recovery Short term – alternate routes determination – determine options for alternate ways to transport Temporary infrastructure – understand what is available and plan for additional options to use Pre-positioning – what can be pre-positioned to support response/recovery or what can be moved to lower risk areas to enable recovery What assets could be affected? – assess impact on system Make repair or replacement decisions, restore as is or improve decisions before Identify repair and replacement options and approaches beforehand What services, resources or special equipment may be needed? – identify needs, have list of potential suppliers, determine selection criteria to pre-qualify, have contracts in place, if possible National Cooperative Highway Research Program (NCHRP) Report 753: A Pre-Event Recovery Planning Guide for Transportation Philippines Supply Chain Resilience Symposium and Workshop

Temporary Structure/Detour Pre-Event Tasks and Considerations Determine temporary structure vs. existing detour route criteria.   Select alternate or detour routes in advance. Develop short-term infrastructure options and include multi-modal solutions. Maintain list of utilities and updated contact information. Coordinate with Continuity of Operations Planning (COOP) process. Include impact on other modes of transportation. Consider developing multiple options, such as using undamaged portions of infrastructure. Incorporate integrated multi-modal options - highway, maritime, rail, and aviation - where possible. Coordinate with utility purveyors for utilities in rights-of-way Establish process for acquisition of temporary structures. Identify options for standardizing components and using prefabricated elements. Identify suppliers for prefabricated structures. Identify locations to stockpile and pre-position supplies and resources. Compile databases with critical recovery information such as location of fuel resources. Consider maintaining an inventory of temporary bridges and prefabricated buildings. E.g. evaluate suitability and availability of existing state and national prefabricated bridge standards. E.g. Prefabricated bridges and temporary structures such as prefabricated buildings. Consider stockpiling of components. Evaluate regional stockpiles and locations outside vulnerable areas. Get conditional waivers in advance for short-term use of certain assets that may carry weight, size, or material restrictions, if required. Understand weight limits and requirements for transport of equipments and supplies. Philippines Supply Chain Resilience Symposium and Workshop

Emergency Highway Replacement: Precast Concrete Panels Panels have embedded leveling lifts. Can be removed and used at another location. Life-cycle cost is lower than cast-in-place solutions because panels last longer. California Department of Transportation Philippines Supply Chain Resilience Symposium and Workshop

Repair/Replace Pre-Event Tasks Considerations Identify rebuild vs. relocate criteria.   Determine repair/rebuild priorities. Consider infrastructure condition, e.g. planning to replace infrastructure identified as marginal or inadequate. Assess impact on network, e.g. repairable structures that restore most of the lost regional networks given higher priority. Address historical preservation requirements when applicable. Identify potential alternate sites for relocation. Consider whether re-siting to a reduced risk location is an option. Prepare/project cost estimates replacement and for possible land acquisition, if necessary. Identify mitigation approaches to incorporate such as seismic retrofitting, elevation changes, and flood proofing. Coordinate with Hazard Mitigation Plans to incorporate hazard mitigation into recovery planning Philippines Supply Chain Resilience Symposium and Workshop

Contracting Pre-Event Tasks and Considerations Develop list of prequalified engineers and contractors.   Maintain fresh list of potential contractors for competitive bidding. Select contractors with resources and expertise to accomplish projects under emergency situations. Establish contract templates and contracting protocols. Put in place contracts, Mutual Aid and Assistance agreements and MOUs, if possible. Establish Programmatic Agreement, MOA, or informal agreements to formalize rules of engagement, roles and responsibilities. Identify supplementary support resources. Put in place mutual aid agreements to pool community and regional resources, if possible. Develop contingency plans, especially for situations when mutual aid and resource sharing is not possible. Major incidents may adversely impact the availability of engineering, contractors, and materials. Consider regional formal resource sharing compacts. Emergencies that affect large regions can make resource sharing within the region impossible. Establish emergency contracting protocols in advance. Develop/practice accelerated administrative process. Flexibility in operational and contracting procedures can expedite reconstruction process. Identify and designate contracting officers. Establish relationships in advance among project stakeholders. Experienced contracting officers are critical in situations where problems may be encountered or when federal reimbursements are sought. Philippines Supply Chain Resilience Symposium and Workshop

Performance Based Prequalification Criteria Performance Criteria Major project experience Available equipment Performance evaluations Financial Criteria Financial capability Managerial Criteria Past illegal behavior Technical ability Key personnel experience Managerial Ability Bonding, sureties, and insurance National Cooperative Highway Research Program (NCHRP) Synthesis 390: Performance-Based Construction Contractor Prequalification Philippines Supply Chain Resilience Symposium and Workshop

Philippines Supply Chain Resilience Symposium and Workshop Thank You Pat Bye Email: pat.bye@consultingwestern.com Philippines Supply Chain Resilience Symposium and Workshop