Miscellaneous (いろいろ) 8 Jul. 2009 Hiroki Kanda.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Experimental Analysis of Glass ME EN December 7, 2005 Darin Juncker, James Hall.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
POWER PLANT.
Thermal energy Ch. 6 mostly. Transferring thermal NRG There are three mechanisms by which thermal energy is transported. 1. Convection 2. Conduction 3.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
Update on Ongoing Tungsten Digital HCAL Beam Tests Erik van der Kraaij CERN LCD.
Section 1 Temperature and Heat. Kinetic Theory  All objects (even people) are made of particles and atoms that constantly and randomly move. All atoms.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
Interiorscape Proposal HORT 3140 Interiorscaping.
Target 18 Jun H. Kanda. To do list Aluminum cell (Type 2 and 3) –Mirapro: Invoices delivered, invoice for the shorter cell was requested PET pipe.
ComColor Ink passage Mechanism (Revised version)
Section 3 Using Heat.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
2 nd POCPA Workshop CERN, June 2010 magnet power converters for a IV Generation Light Source Roberto Visintini Denis Molaro Sincrotrone.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Facilities Management and Design Chapter 7 HVAC Systems.
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Using Thermal Energy Mrs. Nell 8 th Grade Physical Science Chapter 6 Review.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Air condition installation
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
When choosing a new system, you’ll be faced with an almost overwhelming range of options and technologies for air conditioning.
Content: Introduction A Simple Gas Turbine Plant & It’s Working Plant Layout Types according to Cycle 1. Open Cycle Gas Turbine Plants 2. Close Cycle.
Summary of STF-EP facility at KEK.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Michael A. Green and Heng Pan
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
FUEL SYSTEMS AND ITS COMPONENTS
PTRT 1391 Natural Gas Processing II Chapter 3
Francois and Lau EATM 17 July 2012
WELDING.
Experimental hall design in Japanese site
A PROPOSAL TO TRANSPORT FLUIDS FROM WELLHEAD TO FLOW STATION USING A GAS DISPLACEMENT PUMP. Juan Carlos Brown, 6th July 2017.
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
CRT / Test KEK Fuji Tomokatsu Hayakawa Nagoya University 12th B2GM 2012/7/23.
2011/ 07/06 Jacqueline Yan IPBSM
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
CRYOGENICS OPERATIONS 2008 Organized by CERN
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Section 3: Using Thermal Energy
LN2 Circuit for MIT Test, September 2005
Electrical Gas Plumbing Heating & Cooling
PROFESSIONAL HVAC SERVICING ● Q ’ s HVAC Inc uses trusted, quality products to enhance and repair your existing heating and cooling systems. ● Our products.
Notes 7: Using Heat Chapter 6 Section 3 Page 172.
IBBelle: Status Commissioning at MPP Transport to KEK
______________ Combustion Engine
Course Name: Air-conditioning: Introduction Prof. A. D. Kale
Extract from today’s talk given to DCB
High Performance HVAC Installation
T.S SEIUN MARU AUXILIARY BOILER Third Engineer 2019/2/19 ボイラ.
HYBRID AIR COOLING TECHNOLOGY
Simulated use of premixed 0
Phase behaviour of premixed 0
How to succeed in my course, part 1
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
g3 Alternative Gas Solutions
Presentation transcript:

Miscellaneous (いろいろ) 8 Jul. 2009 Hiroki Kanda

Gas cylinders Cylinders in the 2nd exp. hall 1 almost full cylinders of Ar-C2H6 2 empty and 1 nearly empty (< 0.5 MPa) cylinders of Ar-C2H6 1 nearly empty cylinders of N2 for the operation of the valves of the target controller. Cylinders in Gev-gamma preparation room 2 full cylinders of Ar-C2H6 2 Ar cylinders 2 C2H6 cylinders Several empty cylinders from Tanuma-sanso To Do: Buy a N2 cylinder to be delivered in this week Ask Tanuma-sanso to retrieve empty cylinders Take out empty and nearly empty cylinders in the exp. hall Bring necessary cylinders to the exp. hall Ask Tomoe-shokai and Suzuki-shokan to retrieve empty cylinders

Gas pipelines from outside to the experimental hall Prof. Ishikawa suggested me that LNS can support installing gas pipelines to the 2nd exp. hall from outside, if they have a room in their budget. I would like to send a request to install gas tubes from GeV-gamma preparation room to the 2nd exp. hall. Example of the assignment of the lines to the species of gasses: Ar-C2H6 x 2 lines (for CDC and VDC separately) N2 x 1 (buffer tank of roughly 1 L will be needed in the exp. hall to guard agaist the sudden change of pressure during the operation of valves) H2 x 1 reserved x 2 I think is better to lay the cylinders for Ne and D2 in the exp. hall as the same as so far, because they are small and easily transported by hand. In total 5 – 6 lines are enough for our use.

Air-conditioner The heavy maintenance, almost overhauling, of the air conditioner in the prefab (electronics hut) was done on 8 and 9 Jun. 2009.  It seems its cooling power resurrected, in my feeling. The air duct was set aside for the maintenance.  It was recovered, even upgraded to a more efficient one by Kaneta-san. The windows of the prefab are heavily dewy and the cooled surfaces of the metallic objects even in the prefab are slightly dewy.  I recommend not to set the temperature less than 20 deg. C when we do not use the electronics in the prefab.  The temperature of 20 deg. C is the dew point for the air with the humidity of 55 % and temperature of 30 deg. C.

HV on VDC (superfluous info.) HV of 2.0 kV is applied on VDC today. The STB is operated with the circulating current of roughly 15 milli-amps. The currents of HV power supplies go around several micro-amps (5 – 10 % of the full-scale of 100 micro-amps) during the injection period of STB. By considering the response time of the current meters, the currents may go over 10 micro-amps in a flash.  They trip with 10 micro-amps range. During the circulation period (the radiator is inserted to provide a gamma-beam to GeV-gamma hall), the currents are sufficiently less than 1 micro-amps.