Part List of “Swift” LC Connector

Slides:



Advertisements
Similar presentations
© DIAMOND Headquarters / F-3000 r & rs / / 1 WERE WELL CONNECTED F-3000 r & F-3000 rs connectors.
Advertisements

Industrial Segment Alternative Power Generation
Amphenol Outdoor Connectors
Building a Weather Station for a Near-Space Payload AEM 1905: Spaceflight with Ballooning University of Minnesota.
FTTH PON Unsolicited offer
1 Cable Assembly for CanSat. 2 Heat Shrink Tubing Battery Pack Connection Pin Connectors Radio Cables Mic & Speaker Plugs See close up connection page.
FTTH Network Configuration FOR Drop Line Infrastructure Solution
© DIAMOND SA / / 1 MU Connector High density optical miniature unit.
© DIAMOND SA / X-BEAM / / 1 X-BEAM Connector Up to 4 channels SM and MM optical connections based on Expanded Beam technology.
Session 4: Termination and Splices. 2 FO Connectors Specifications Specifications Loss Repeatability Environment (temp, humidity, vibration, etc.) Reliability.
BumperBot uses two contact switches to go through a labyrinth. Bumper.
MFS, MPO 4/8/12-Fiber connectors and Fan-Out assemblies.
© DIAMOND SA / / 1 Alberino CRA Alberino fixing system for modular constructions within industrial Mennekes housing.
160 BOOM ELECTICAL INSTALLATION. 160 BOOM CAB INSTALL INVERTER HARDWARE KIT (4) 10-32X3/4 (4) #10 Lock Washers (8) #10 Flat Washers (4) Nuts (2)
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
RES G series TRAining CEntre Maintenance. Remove blast tube to check: Correct electrodes position Air nozzle position Fuel nozzle condition.
© DIAMOND SA / / 1 DMI DIAMOND Micro Interface Detachable miniature optical interface for multiple usage.
Fiber Distribution Point for Underground VSOF-CS403A-SD Connector type Fiber Distribution Point.
External nut type series 43
RaceBot can do car race using two DC motors. Let's learn how to go forward, backward, right turn, and left turn. with practicing ' ㄱ ' shape racing, and.
Soldering Jumper Wires SPIRIT Strip about ¼” of insulation Apply solder until wire appears soli d “Tin” the wire.
Fiber-Optic Communications
AWG 36, 0.2 A 0.3 mm Heat Shrink Tubing t = 0.38 mm Silicone Coating t = 0.2 mm D = 3 mm Shielding: Copper Tape AWG 26, 2.2A 0.6 mm AWG 26, 2.2A 0.6 mm.
CONNECTORS, CABLES & SOLUTIONS Presentation I-Net M12 Crimp Field Industrial Ethernet D-Code 360° EMI/RFI Shielding with crimp flange system Railway cable.
WIRE REPAIR Chapter 4.
1 Nexans Cabling Solutions Fibre solutions for fast deployment Joost Grillaert.
1 Fiber Optics LIGHT CRIMP TERMINATIONS USING THE PRENTIUM KIT.
Fiber Optic Connections Piotr Turowicz Poznan Supercomputing and Networking Center 9-10 October 2006.
Qualified Partner Program Connectors for field termination Felice Guarna, Training Program Manager Wetzikon, January 2006.
Fiber Optics FIBER CONNECTOR TYPES.
BugBot is a robot that walks with 6 legs not using wheels Bug.
Fiber Optics FUSION SPLICING.
FlyBot is an airplane robot. This robot consists of the DC motor which supplies rotatory power to the propeller. Fly.
CONNECTORS, CABLES & SOLUTIONS Presentation I-Net M12 Crimp Field Industrial Ethernet D-Code 360° EMI/RFI Shielding with crimp flange system 8/2010.
Lighting and Wiring Services
9/13/2015Robin Lafever BigBoss1. Fiber and Ferrule 9/13/2015Robin Lafever BigBoss2 Typical fiber and Ferrule: My current model is out of date. Jerry Edelstein.
Fiber Optic splicing process Technology Partners.
Kanwalpreet Kaur Communication subsystem & Integration subsystem.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
CSFL upgrade – status report. Purchased parts/ spares Red and white heat shrinks, Kapton tape, flat cable, spare diodes.
© DIAMOND SA / / 1 ALBERINO Solution. © DIAMOND SA / / 2 E-2000™ ALBERINO Solutions Product description A single and robust component for.
Fiber Joints Fibers must be joined when
TIP-TILT FIBER INVESTIGATION OF FERRULE BREAKAGE MICHAEL LEFEBVRE / LBTO AO TECHNICIAN NOVEMBER 29, 2014.
PREPARATIONS TOOLS : 1 、 wire stripper 2 、 coating stripper 3 、 fiber length measurement 4 、 cutter QUICK ASSEMBLY CONNECTOR 1.
A quick and effective preconnectorised system
WIRE REPAIR Chapter 4.
440-LC Fraction Collector
How to connect two wires… Using a solder-type heat shrink connector.
ANCIT WORKSHOP Torino, March 1998 Optical Network Construction in Customer Premises by Sadaaki TAKANO NTT Access Network Systems Laboratories.
Operating procedure for POF cables Comoss Electronic Co., Ltd. Date : May-05, 2008.
DETECTOR PIXEL CHIP MCM PIXEL BUS COOLING TUBE PIXEL BUS AND PILOT MCM CONNECTIONS (1) SDM comp LASER DIODE Space reserved (15mm) for connections.
WIRE REPAIR. TROUBLESHOOTING STEPS l Confirm the Complaint l Study the electrical schematic l Locate and repair the fault l Test the repair.
Optical performance measurements of various fibre connections
The reading is 7.38 mm. The reading is 7.72 mm.
UPM, DIAC. Open Course. March SPLICES AND CONNECTORS 6.1 Basics 6.2 Splices 6.3 Connectors.
Scintillating Fiber BLM with PMTs
Introduction to Soldering
best practice for cleaning
Heat shrink solder sleeving
33KV PLUG-IN TERMINATION AT GAYATHI D6624 PROJECT
Witness the “Evolution”
Pacific Radio Electronics Electronics Equipments Manufacturer and Supplier.
Fiber Optic Connectors, Splices, and Tools
Presented by: Richard Hathcoat & Alexander Millan
HUBER+SUHNER ACS Confidential ACS May 2013.
Компания Reichle & De-Massari (R&M)
' · · ,.-.., '' !'",. -,..._ ·-.·-...;.· -
Cable Cap.
Presentation transcript:

Part List of “Swift” LC Connector Plug Frame Ferrule Heat Shrinkable Sleeve Spring Stopper Heat Shrinkable Tube Boot “Swift” LC Connector(0.9mm Fiber) “Swift” LC Connector(2.0mm Code) Part List of “Swift” LC Connector http://www.ilsintech.com Process of Connecting(Example 2.0 code) ① Place Ferrule part on Holder ② Ferrule Part Stripping ③ Ferrule part Cleave ④ ※ Boot - Heat Shrinkable Tube - Stopper - Spring - Heat Shrink Sleeve is assembly to cable 2.0mm ⑥ Splicing ⑦ Sleeve 1(Heat Shrinkable Sleeve) ⑤ Primary fiber Stripping,Cleaving ⑧ Spring & Stopper Assembly ⑨ Sleeve 2(Heat Shrinkable Tube) ⑩ Boot Assembly ⑪ Completed Production Sleeve use environmental condition - Temp. : 160oC - Operating Tme : 20sec In the case of APC Connector, Red mark in the APC Ferrule to the upward, Then assembly to the plug frame