Adrian Bevan, Dave Brown, Marco Ciuchini, and Achille Stocchi

Slides:



Advertisements
Similar presentations
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Advertisements

Gena H. Davies Trinity Western University.  Research is “professionalized.” Formal research outlets include: ◦ Journals ◦ Books ◦ Conferences  National.
5 th Physics of the B Factories Meeting Aims and plans for the workshop Adrian Bevan.
Management Committee Summary Effort at CERN Operational Tasks Cost Sharing and New Expenses ZDC Collaboration Management roles Papers, Conferences and.
Prepared for the Ottawa Region MISA Professional Network Centre - Summer 2006 Writing a Research Proposal for Funding An Overview.
1 LSST dark energy science collaboration meeting Penn June 11-13, 2012 LSST dark energy science collaboration meeting Penn June 2012 Launch of the.
ICH V1 An FDA Update Min Chen, M.S., RPh Office of Drug Safety Center for Drug Evaluation and Research FDA January 21, 2003.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
Physics activities toward the TDR will be coordinated by A. Bevan, D. Brown, M. Ciuchini and A. Stocchi A document, also in Italian is needed by the end.
SuperB Physics Closeout Adrian Bevan 1 st SuperB Collaboration Meeting, London th Sept. 2011
Report from SuperB Proto-Speakers Bureau Popat Patel SuperB Workshop-Elba 25 June
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
Get Your Head in the Cloud
SuperB: Other experiments session LHCb/LHCb upgrade (see LHCb web site/search Google) & NA62 Adrian Bevan Caveats: (i) this is based on the LHCb upgrade.
TDR and planning session
JRA/SURA Briefing Session
Working Group 1 Report from Warwick (Conveners: Adrian Bevan, Chih-hisang Cheng, and Thomas Mannel) With thanks to Tim Gershon for his efforts in the.
Undergraduate Summer Research Award Program
ISO/TC 204 WG 3-Database Technologies
ServiceNow Implementation Project Campus Stakeholders and UIT Change Champions Meeting October 5, 2017.
Working in Groups in Canvas
Tanzania JAS: Proposed work program for Joint Analysis /Programming
SuperB: Physics.
Space Communication Cross Support Architecture WG
Physics Progress and Plans Adrian Bevan
Physics of the B Factories
Adrian Bevan / Dave Brown
Reporting the Course level RWR Assessment data
Recommended Future for HCP and PLHC after 2012
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
SuperB Physics Elba 2011.
College of Science and Engineering
Jimmy Proudfoot Argonne National Laboratory
Key Information Summary (KIS)
Prepping for the Semester
Overview of Social Computing in Microsoft SharePoint 2010
Managing the Business of Conservation
All Wales Safeguarding Procedures Review Project
Marine Strategy Framework Directive (MSFD)
DG Environment, Unit D.2 Marine Environment and Water Industry
Project Objectives, Workplan and Timescales
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Closing Report.
Adrian Bevan / Dave Brown / Marco Ciuchini / Achille Stocchi
Status of the Physics White Paper
IWW12 recommendations What are AMVs?
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
PMP sub-group on CPC calibration
1 Guidelines for Autonomic Service Agents draft-carpenter-anima-asa-guidelines-00 Brian Carpenter Sheng Jiang IETF 97 November
Reliability Standards Development Plan
API Summer Standardization Conference
5QC Update IPSG Meeting Lisbon, 15 November 2007
Dissemination Working Group (DWG)
Marine Strategy Framework Directive (MSFD)
September NHS Meeting September 20,2016.
VC Title Goes Here Name (s), Organization, CEOS Affiliation
We want to see you in Austin!
Marcello A. Giorgi Università di Pisa & Pisa
We want to see you in Austin!
Organisation of the Physics activity toward the TDR
Boosting Cross-border cooperation capacities of local actors in the South Baltic Sea Anna Topp Gustavsen Sorø, 9 May 2019.
The Development of Water Policy and Climate Change
Wirral Together Communities Forum
Implementing the ESPON 2013 Programme
WG 03 IoT Identifier Task Force Status 11/2017
Summary of the IEEE 802 Coexistence Process Discussion
Welcome to The New Term.
Presentation transcript:

Adrian Bevan, Dave Brown, Marco Ciuchini, and Achille Stocchi Physics Summary Adrian Bevan, Dave Brown, Marco Ciuchini, and Achille Stocchi + thanks to the session contributors for talks and the many useful discussions.

Physics mailing list has been set up: Wiki Pages Available http://mailman.fe.infn.it/superbwiki/index.php/Physics_Portal Theory classification for our colleagues to edit the Wiki. Use the Wiki to coordinate our efforts as part of SuperB Physics mailing list has been set up: superb-physics@lists.infn.it SuperB Perugia June 2009

Working Groups Each group has a wiki page Very full session summarizing the Warwick workshop activities See Thursday 2pm session! SuperB Perugia June 2009

Working groups keep track of activities Charge Conveners Hot Topics Recent Activity Conveners should keep this information up to date. Gives an overview of activities for people interested in contributing. Will highlight open/undermanned areas. WG1 SuperB Perugia June 2009

Conference Talks/Seminars SuperB Perugia June 2009

Planning Simulation Production Several talks on Monte Carlo production were given in the Wednesday Physics + Computing session. In particular look at: Aim for a test production cycle for the October meeting (test). Jan 2010: Full Scale Production (for TDR) Summer 2010: Final Production (for TDR). Need to co-ordinate efforts with computing experts. SuperB Perugia June 2009

Public Seminar Antonio Masiero gave an inspiring seminar summarizing the raison d’etre of flavour physics to probe EW symmetry breaking. SuperB Perugia June 2009

Public Seminar SuperB Perugia June 2009

Charm Ikaros (also see Brian’s WG summary) Another inspiring talk! SuperB Perugia June 2009

Charm Plenty of interesting physics to study: Contact David, Brian, and Ikaros if you’re interested! SuperB Perugia June 2009

Time-dependent measurements: I Nicola Neri: The shape of things to come! Clear we will have to worry about doing precision TDCPV measurements. Effectively 10-15% less data with lower boost. Think in terms of the running cost when contemplating any such change! SuperB Perugia June 2009

Time-dependent measurements: II Gabriele Simi stat  syst syst SuperB Perugia June 2009

Deadlines: Interim Report Prepare a physics section for the interim report. Want to update our knowledge of the physics case for SuperB. Particularly highlighting unique features of the programme. Audience: The physics community. Focus: Stand-alone description of the NP and unique capabilities of SuperB. Deadlines: Start of October: SLAC Meeting will be used to bring contributions together. 1st November: Draft ready to circulate to SuperB community for comments. 1st December: Draft finalized and ready for circulation outside of SuperB. SuperB Perugia June 2009

Winter Physics Workshop To be held in Frascati (details to follow). Satellite meeting to the December General meeting. Before the CERN interplay workshop [14-16th Dec] Opportunity for us to report progress to the regional community. Try to identify a few NP studies that can be shown on this timescale. Aim of the workshop: Finalize interim document. Plan for TDR work over 2010: Identify SuperB analyses being updated Plan Simulated Production Cycle for TDR studies (mid 2010) Write the document… SuperB Perugia June 2009