GBANS - Steps 4, 5 & 6 NOTE TO INSTRUCTOR: Offer to the team to display this slide for the team’s presentation.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers Budgeting Process
Advertisements

Corrections System Master Plan PRELIMINARY CAPITAL PLAN SUMMARY SEPTEMBER 5, 2007 CARTER GOBLE LEE In association with CH2M HILL.
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
Miami Harbor, FL Navigation Study Step 3: Formulation of Alternative Plans.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
 Course Redesign requires the redesign to “save resources”
Lender Lists, RFIs & RFPs ILASFAA April 17, 2008.
Unit 3 (cont.): Economic Analysis— Cost-Benefit Analysis 2.
Corrected for Discount Rate.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
Contemporary Engineering Economics, 4 th edition, © 2007 Benefit-Cost Ratio Lecture No. 66 Chapter 16 Contemporary Engineering Economics Copyright © 2006.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Lecture No. 54 Chapter 16 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration Review Processes Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Module 24 STEPS 17, 18, & 19 Project Implementation Civil Works Orientation Course - FY 11.
Savannah Harbor Expansion Project
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
Module 29 Interagency & International Support Program Civil Works Orientation Course - FY 11.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force March 29,2007 Pavement Management Report Financing Plan Presenter:
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Benefit-Cost Ratio Lecture No. 53.
Plan Formulation for Deep Draft Harbors Navigation Measures.
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Implementing the Regulatory Flexibility Act. 2 Background The Regulatory Flexibility Act (5 U.S.C. 601–612) requires Federal agencies to— –Consider the.
M4 - 1 BU ILDING STRONG SM Multi-Purpose Projects Module M4: Telling the Plan Formulation Story.
Building Strong! May Deep Draft Navigation Cost Sharing Jeremy LaDart Office of Water Project Review HQUSACE.
Chapters 13, 14, 15, 16, and 17. Executive Offices and Budget The president has many advisors but the people in the White House are his closest and work.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Harbors Module NH3: Formulation – Measures, Strategies and Plans.
AGEC 608 Lecture 01, p. 1 AGEC 608: Lecture 1 Objective: Introduction to main concepts Readings: –Boardman, Chapter 1 –Kankakee, summary of Draft Assessment.
Long Island’s Offshore Wind Farm David Tobias Project Evaluation.
Social discount rate for Russia: sectors’ imbalances and value selection Tatiana Kossova, PhD in Economics Mariia Sheluntcova, PhD in Economics National.
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
Scientific Supply Purchases Strategic Sourcing Initiative Huron Consulting Services was engaged to evaluate cost savings opportunities with our major scientific.
US Army Corps of Engineers BUILDING STRONG ® Step 6: Selection Of The Recommended Plan Planning Principles & Procedures – FY11.
Mark Xu NRCS 67th Annual SWCS International Conference.
TIM158 Business Case Assignment Instructor: Safwan Shah Teaching Assistant: Rui Wu.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® PCoP Webinar Series Section 7001: Preparing the 2017 Annual Report to Congress on Future Water.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
City of San Mateo 2016 Reach Code
PRINCIPLES & GUIDELINES
Future Construction FasTracks Corridors Federal Funding Analysis
Continuing Authorities Program
THE FEASIBILTY STUDY LECTURE-5.
AREC 514 Cost-Benefit Analysis
Recommend Investment Course of Action Based on NPV Calculation
Louisiana Coastal Area
Cost-Benefit Analysis Training: APS Case Study (cont’d)
Contemporary Engineering Economics
2018 Recreational Black Sea Bass
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
Federal Rulemaking Process for Significant Regulatory Actions
Using NCAT’s Course Planning Tool
Revolutionize USACE Civil Works
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
Progress on Standardization
Federal Budget Process – Its Challenges as well as its Opportunities
Funding options for the City’s Capital Needs
Sacramento Environmental Commission January 2019.
Presentation transcript:

GBANS - Steps 4, 5 & 6 NOTE TO INSTRUCTOR: Offer to the team to display this slide for the team’s presentation.

Miami Harbor, FL Navigation Study GBANS - Steps 4, 5 & 6 Miami Harbor, FL Navigation Study Step 4 – Evaluation of Alternative Plans Step 5 – Comparison of Alternative Plans Step 6 – Selection of the Recommended Plan

Evaluated Alternatives GBANS - Steps 4, 5 & 6 Evaluated Alternatives Plan A: No Action Plan Plan B: Widen the Channel (Measures 1C, 2A, and 5A) Plan C: Extend the Fisher Island Turning Basin (Measure 3B) Plan D: Widen the Channel (Measures 1C, 2A, and 5A) and Extend the Fisher Island Turning Basin (Measure 3B)

Evaluated Alternatives (cont’d) GBANS - Steps 4, 5 & 6 Evaluated Alternatives (cont’d) Plan E: Deepen the Previously-Authorized Channel Configuration Plan F: Widen the Channel (Measures 1C, 2A, and 5A) and Deepen the Resulting Channel Configuration Plan G: Extend the Fisher Island Turning Basin (Measure 3B) and Deepen the Resulting Channel Configuration

Evaluated Alternatives (cont’d) GBANS - Steps 4, 5 & 6 Evaluated Alternatives (cont’d) ·  Plan H: Widen the Channel (Measures 1C, 2A, and 5A), Extend the Fisher Island Turning Basin (Measure 3B), and Deepen the Resulting Channel Configuration. · Plan I: Consists component 6 and 6A.

GBANS - Steps 4, 5 & 6

(Locally Preferred Plan = 50 feet) ECONOMIC SUMMARY (Locally Preferred Plan = 50 feet) Estimated Implementation Costs Federal Non-Federal Total Average Annual Benefits & Costs Annual Benefits Annual Costs Net Benefits Benefit to Cost Ratio: 1.4 (Price Level Oct. 2004 & Discount Rate 5. 375%) $ 65,600,000 $ 96,400,000 $162,000,000 $ 14,740,000 $ 10,650,000 $ 4,090,000 ( 41%) ( 59%) (100%)

What Happened to MH? Chief’s Report signed 25 April 2005 GBANS - Steps 4, 5 & 6 What Happened to MH? Chief’s Report signed 25 April 2005 ASA(CW) approval 23 February 2006 OMB clearance 5 May 2006 Sent to Congress Authorized WRDA 2007 Construction underway