For ILD joint steering board

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Signing LOI for ILD detector concept at ILC Deadline LOI submits march 31st 2009.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Concluding Remarks Dongchul Son Center for High Energy Physics Kyungpook National University.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
Report from Worldwide Study and Charge to the Workshop ACFA04, Taipei 11/8/2004.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
1 BILC07/ACFA Charge Hitoshi Yamamoto BILC07, Beijing
1 ILD – A Large Detector for ILC Mar. 3, 2008 Yasuhiro Sugimoto KEK.
1 ILD – A Large Detector for ILC Nov. 6, 2007 Yasuhiro Sugimoto KEK.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ILC Physics and Detector - Status and Goals for LCWS14 – Hitoshi Yamamoto LCWS14, Belgrade October 6,
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Agenda items TEB activities at KILC TDR SVN repository roll-out
MADMAX draft MoU preamble:
Oct 22 Group Leaders Planning meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
GDE and ASIA ACFA ALCSC.
Support- IRDiRC Proposed Work Plan And Communication Strategy
Physics Analysis Summaries towards a proposal
Seventh RD51 CB – 14/4/2011 AGENDA Approval of the agenda
PDAP Junji Haba, KEK.
Report on plan to produce an Engineering Design Report
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
The DBD: Outline and Scope
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Update of the Detector Program for ILC Sakue Yamada March
The School Point of View
Ron Settles MPI-Munich
State Elections: Incorporated & Unincorporated
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Executive Project Kickoff
CONSTITUENT BODY REFORM (CBR)
Presentation transcript:

For ILD joint steering board Introduction Boundary conditions, History, Where we are going ILD session, ALCPG07 23-Oct-07 Hitoshi Yamamoto For ILD joint steering board

Research Director (RD) Responsible for the ILC experimental program Sakue Yamada formally accepted the post. Starting intensive activities Structures under RD WWS co-chiars requested by RD to assist him Having weekly phone conference IDAG being selected by RD and WWS co-chairs Reviews LOIs and advises RD LOI call was sent out by ILCSC (RD, WWS). ALCPG07, Oct 23, 07

LOI Call (Sent out, Oct 5) Dear Colleague, The International Linear Collider Steering Committee (ILCSC) announces a call for Letters of Intent (LOIs) to produce reference designs for the two ILC detectors. These designs will be detailed in two Engineering Design Reports (EDRs) to be completed on thetimeline of the machine EDR being prepared by the Global Design Effort. The guidelines for the LOIs are presented in the appended document and a public presentation of the WWS roadmap for detectors can befound in the LCWS07 web site. The LOIs should be sent to the ILCSC by October 1, 2008 and will be reviewed by an advisory body appointed with the approval of ILCSC. This body, together with a management team led by the Research Director Sakue Yamada who has been appointedby ILCSC, will start a process leading to the formation of two groups capable of preparing the two engineering designs and the EDR documents. Sincerely Yours, Shin-ichi Kurokawa Chairman of the International Linear Collider Committee http://physics.uoregon.edu/~lc/wwstudy/lois/LOIguidelines.pdf ALCPG07, Oct 23, 07

Why LOI call Now? Group formation process should be open Give chance to all interested parties in HEP community Avoid impression of decisions internal to ILC community → LOI call Detector needs to be synchronized to accelerator A practical requirement to start taking data when accelerator is ready: Conventional assembly: late by ~2 years. Surface assembly: barely in time, by assembling on surface while exp. hall is being dug and prepared Start construction in 2012~3, EDR in 2010 → LOI call now, group formation in 2008 ALCPG07, Oct 23, 07

What is LOI? What LOI IS: What LOI is NOT: A basis to form two groups capable of producing EDR Describes resource needs and their evolution in time What LOI is NOT: It will not contain financial commitment It will not exclude any other groups to produce EDRs in time for construction. In such a case, the ‘ILC lab’ would decide final two groups. ALCPG07, Oct 23, 07

LDC/GLD → ILD Pros Cons We have decided that pros outweigh cons More manpower, more funds Political critical mass Revitalization of studies Physics and detector optimization Focused studies in the ‘horizontal collaborations’ Cons Need to unify the detector design Can we work together? Prides, regional priorities, political power share We have decided that pros outweigh cons So we hope! ALCPG07, Oct 23, 07

LDC/GLD → ILD History: After Beijing ACFA, Feb 07 Some talks of close collaboration between LDC/GLD Before DESY LCWS : (~May 07) Joint contact persons’ meetings Agreed to move toward a single joint LOI GLD EB approved ‘single joint LOI’. DECY LCWS07 First joint concept study meeting LDC meeting approved ‘single joint LOI’ First face-to-face contact persons’ meeting Decided to establish a joint steering board ALCPG07, Oct 23, 07

Name: ILD Joint Steering Board meeting (Sep 13) Web site: Among the names proposed by JSB, ‘ILD’ was taken to be the name. Until a collaboration is formed. More ‘interesting’ name to be picked then. Other names suggested: DOLCE, ILIAD, IDL… Web site: www.ilcild.org A plone site - under preparation Currently pointing to a DESY site Under construction ILC agenda server http://www.linearcollider.org/cms/?pid=1000364 ALCPG07, Oct 23, 07

ILD Joint Steering Board JSB charge Do whatever is necessary to produce the single LOI in time. It is open after the LOI phase. JSB selection Balanced regionally and in expertise GLD provides 2 Asians and 1 American LDC provides 2 Europeans and 1 American GLD EB voted for candidates Candidates not restricted to GLD EB LDC took the current contact persons as candidates 2 Asians and 2 Europeans decided as above 2 Americans decided based on above+expertise ALCPG07, Oct 23, 07

ILD Joint Steering Board JSB members Dean Karlen, Graham Wilson Ties Behnke, Henri Videau Yasuhiro Sugimoto, Hitoshi Yamamoto No spokesperson(s) elected ILD is not a collaboration Current structures for LDC and GLD are kept alive. ALCPG07, Oct 23, 07

Working Groups for LOI JSB meetings Two working groups Held every ~2 weeks TV/phone meetings Established two working groups Optimization MDI/integration Set guidelines for the WG activities Two working groups Mark Thomson, Tamaki Yoshioka Karsten Buesser, Toshiaki Tauchi ALCPG07, Oct 23, 07

MDI/integration working group charge: The MDI/working group is charged to produce a self-consistent design of the structure of the ILD detector from the viewpoint of machine-detector interface (MDI) and detector integration for the LOI that is to be submitted by October 1, 2008. Specifically, it covers the design of the beam pipes, magnets, iron return yoke, beam instrumentations, and their supports that require works by the detector group. Also, it should address general detector structure and assembly issues, where the aspects that affect the machine design will have initial priority. Beam background studies should be performed when necessary. The group should work closely with the machine people and the groups working on subdetectors that affect the structure of the ILD detector. In order to organize the needed activities, two conveners have been elected. They are to define necessary tasks and to organize subgroups to perform them. The Steering Board will assist the conveners in fulfilling the charges. The timeline should be such that by May 2008, the relevant designs should be defined enough to start authoring the LOI. ALCPG07, Oct 23, 07

Optimization working group charge: Investigate the dependence of the physics performance of the ILD detector on basic parameters such as TPC radius and B-field. On the basis of these studies and the understanding of any observed differences, the WG will make recommendations for the optimal choice of parameters for the ILD detector. It is the responsibility of the WG conveners to organize this work, while the steering board will assist them in executing the charge. The WG should aim for have first results from detector optimization studies by the 1st of May 2008 in time for the ILD Letter of Intent to write an ILC Detector EDR. It is understood that the detector optimization studies will be an on-going effort throughout the EDR phase. ALCPG07, Oct 23, 07

Working Groups Activities are starting A few meetings with core people held Discussion of charges How to proceed General kick-off meetings Optimization Oct 31 MDI/integration After ALCPG07 ALCPG07, Oct 23, 07

Subdetectors Currently no new structure is set up for ILD Eventually needed to write the subdetector sections of LOI ILD subdetector groups Relation to the horizontal collaborations? More discussions at the 2nd ILD session ALCPG07, Oct 23, 07

Calendar FNAL ALCPG/GDE ILD workshop 23-Oct (Tue) morning: 1st session 26-Oct (Fri) afternoon: 2nd session ILD workshop First ILD workshop, ~2.5 days. Dec 07 ~ Jan 08, in Europe TILC07 Sendai (ACFA/GDE) Mar 3~6, 08. ILD meeting: 1.5 days. www.awa.tohoku.ac.jp/TILC07 (currently blank) ALCPG07, Oct 23, 07

Calendar ~May 2008 Basic detector parameters defined for ILD Enough to start authoring LOI Oct 1, 2008 LOI submission There is so much to be gained by joining forces. Let us focus on getting things done, and not on your own tribal prides, territorial interests etc. but respect those on the other side. ALCPG07, Oct 23, 07