DHH progress report Igor Konorov TUM, Physics Department, E18

Slides:



Advertisements
Similar presentations
GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
Advertisements

An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Update on Electronics for the SSL 8” Ceramic Detector Matt Andrew, Kurtis Nishimura, Gary S. Varner University of Hawai’i 28-MAR-2012 Discussion 1.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
TPC DAQ developments Gilles De Lentdecker, Yifan Yang, Erik Verhagen, IIHE-ULB (Brussels)
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
GBT-FPGA Interface Carson Teale. GBT New radiation tolerant ASIC for bidirectional 4.8 Gb/s optical links to replace current timing, trigger, and control.
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
1 Tests of EMCM Felix Müller on behalf of the MPP / HLL TestCrew (H.-G. Moser, C. Koffmane, M. Valentan) Belle II PXD – ASIC Review October , 2014.
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
Prototype of the SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz 14 slides The Prototype of the SVD FTB Recent.
PXD EVO Hans-Günther Moser MPI für Physik Meeting on Services and Power Supplies Aim: define the services chain form module to external racks.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Data Acquisition of the PXD Takeo Higuchi (KEK) PXD follow up meeting on Nov.7,2010 « DISCLAIMER» Materials prepared for and presented in PXD follow up.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
DHH progress report Igor Konorov TUM, Physics Department, E18 DEPFET workshop, Bonn February 7-9, 2011 Outline:  Implementation synchronous clock distribution.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
Private Notes on the 3 rd PXD DAQ/Trigger Workshop T.Higuchi (KEK) Jul.8,2011B2GM.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
Counting Room Electronics for the PANDA MVD
SVD FADC SVD-PXD Göttingen, 25 September 2012
Status of DHP prototypes
The Data Handling Hybrid
AMC13 Project Status E. Hazen - Boston University
The Jülich Digital Readout System for PANDA Developments
DAQ and TTC Integration For MicroTCA in CMS
Latest results of EMCM tests / measurements
Novosibirsk, September, 2017
Test Boards Design for LTDB
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
21st International Workshop on DEPFET Detectors and Applications
Markus Friedl (HEPHY Vienna)
E. Hazen - Back-End Report
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
Future Hardware Development for discussion with JLU Giessen
Data Handling Processor v0.1 First Test Results
The Data Handling Hybrid
Discussion Items Clock PC and/or VME CPU Trigger readout
Data Aquisition System
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
Data Handling Hybrid (DHH) Universität Göttingen
GTK-TO readout interface status
The Train Builder Data Acquisition System for the European-XFEL
PXD ATCA DAQ for DESY Test
CoBo - Different Boundaries & Different Options of
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
The University of Chicago
CMS EMU TRIGGER ELECTRONICS
COVER Full production should arrive today
MicroTCA Common Platform For CMS Working Group
GBT-FPGA Interface Carson Teale.
Development of new CN for PXD DAQ
Development of the Data Handling Processor DHP
DAQ Interface for uTCA E. Hazen - Boston University
Front-end electronic system for large area photomultipliers readout
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Presentation transcript:

DHH progress report Igor Konorov TUM, Physics Department, E18 7-th International Work Shop on DEPFET detectors and applications Ringberg –May 8-11, 2011 Outline: DHH architecture DHH prototype Summary and outlook

7-th Int WS on DEPFET detectors and applications И.Коноров, TUM DHH interfaces FTSW DHH Controller Timing JTAG Copper Timing JTAG Optical PXD DAQ DHP GCK, FCK TRG, RST DHH JTAG DATA(3:0) DATA(3:0) Optical Copper 7-th Int WS on DEPFET detectors and applications И.Коноров, TUM

DHH prototype development Objectives Full readout chain test 4xDHP ATCA DAQ Belle Trigger Distribution system Slow control, JTAG Lab setup support Ethernet JTAG Firmware development Finalize DHH functionality 7-th Int WS on DEPFET detectors and applications И.Коноров, TUM

7-th Int WS on DEPFET detectors and applications И.Коноров, TUM DHP – DHH interface To DHP GCK (LVDS/2.5V) – 3/20 of 508.89 MHz = 76.33 MHz FCK (LVDS/2.5V) – Frame clock about 50 kHz TRG (LVDS/2.5V) RST (LVDS/2.5V) From DHP DATA (0 : 3) @ 1.6 Gb/s 7-th Int WS on DEPFET detectors and applications И.Коноров, TUM

7-th Int WS on DEPFET detectors and applications И.Коноров, TUM DHH prototype module I/O isolation DC/DC converter up to 1500 V FPGA: Virtex6VLX75T 128 MB DDR2 memory for soft core CPU SODIMM socket Clustering ASIC 7-th Int WS on DEPFET detectors and applications И.Коноров, TUM

7-th Int WS on DEPFET detectors and applications И.Коноров, TUM DHH prototype module 3x RJ45 Ethernet Timing (Belle) JTAG (Belle) 2xSFP+ for DAQ interfaces 2x6Gb/s SFP+ SFP for DHH controller interface 2xInfiniband 4x connectors for DHP 7-th Int WS on DEPFET detectors and applications И.Коноров, TUM

7-th Int WS on DEPFET detectors and applications И.Коноров, TUM Infiniband cables Infiniband cable 4x: 2.5-10 Gb/s 8 differential pairs 1% crosstalk radiation hardness ? 7-th Int WS on DEPFET detectors and applications И.Коноров, TUM

7-th Int WS on DEPFET detectors and applications И.Коноров, TUM DHP interface Infiniband connector I GCK, FCK, TRG, RST DATA(3:0) Infiniband connector II JTAG LVDS 4 pairs free for future 7-th Int WS on DEPFET detectors and applications И.Коноров, TUM

7-th Int WS on DEPFET detectors and applications И.Коноров, TUM New requirements SODIMM connector for clustering ASIC Remote control of DHP JTAG IO power Switch of power of JTAG signals when DHP is not powered Support of DCD monitor signal ? Extra connectors for existing DHP test setup SMT high speed serial links General purpose LVDS signals 7-th Int WS on DEPFET detectors and applications И.Коноров, TUM

7-th Int WS on DEPFET detectors and applications И.Коноров, TUM DHH status Schematic in progress Complete Power, Serial links, Flash interfaces, clock jitter cleaner New requirements to be implemented Plans Finalize schematic in collaboration with Bonn in order to start production in end of June Remark Project is delayed by 4 month but no impact on overall schedule 7-th Int WS on DEPFET detectors and applications И.Коноров, TUM