How to manage Large Events

Slides:



Advertisements
Similar presentations
Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia
Advertisements

Final Four Briefing Public Safety Committee March 24, David O. Brown Chief Of Police.
Overview What is the National ITS Architecture? User Services
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
NOVEMBER 18 ‚ 2014 SUPER BOWL CENTRAL. Super Bowl Central (SBC) will take over and transform Downtown Phoenix into the epicenter of Super Bowl activities.
ACMA Conference February 8, 2007 Evaluating Investments in Infrastructure Panel Overview of Public Infrastructure Financing in the City of Phoenix.
GFOAz May 11, 2007 The ABC’s of Municipal Financing.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
2 $ Million investment in three transportation projects prioritizing the movement of people to and through the Loop Washington/Wabash CTA Station.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
Center City Access Strategy A Transportation Vision for Growth and Access.
The Dutchess County Fair Traffic Plan Talking Operations Web Seminar April 26, 2006.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Sports and Entertainment Venues Conference April 29 – May 1, St. Louis, MO Meet Our Speakers.
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Incorporating a Regional Architecture in the Planning Process: Central Ohio Example ITS America May 2, 2005 Phoenix, AZ.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
Phoenix Regional ITS Fiber Optic Backbone. PURPOSES  Improve agency operations by establishing a shared, regional, telecommunications network.  Create.
Mobility for all Modes Update to the Transportation Chapter of the City’s Comprehensive Plan City Council May 27,
Multnomah County Central Courthouse Site Due Diligence Update April 9, 2015 JD Deschamps Mike Pullen Mike Day.
Pedestrian Facility Improvement Program

Arizona Forward Update
Gameday Operations Traffic Parking Transit Fan Safety Communication.
Secor Road Reconstruction Project Public Meeting #2
(Expressway Traffic Management System)
Project Overview – Phase 1
Local Government Roundtable Session Arlington, Virginia
June 5, 2017.
Project Status & Right-of-Way Acquisition
Complete Streets Award Program
Intelligent Transportation Systems
APTA Sustainability Conference July 2016
June 26, 2017.
Community and Economic Development Department
Signal Improvement Project COMMUNITY DEVELOPMENT DEPARTMENT
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
Kyle Field Transportation Plan Tim Lomax, Texas A&M Transp Inst
2017 CAIRNS HOCKEY COMPETITION WORKSHOP AND FORUM
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
How to manage Large Events
Draft Transportation Element September 6, 2017
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Transportation Research Board 2004 Annual Meeting
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
21st Century School Buildings Plan
Metropolitan Planning Organization
Transportation Management Plan Modernization Project
Transportation Alternatives (TA) Set-aside
Introduction to Event Marketing & Management
APTA Sustainability Conference July 2016
Automated Vehicle Program Funding
School of Civil Engineering
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Central Corridor - Light Rail Transit Metropolitan Council
M14A/D Select Bus Service
Transportation Management Plan Modernization Project
Fordham at Columbia as a Grade-Separated Intersection
Metropolitan District | mndot.gov
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Project Location: 35th Ave HSIP8
Module 6 A 21st Century Transportation Network
Presentation transcript:

How to manage Large Events American Council of Engineering Consultants May 25th, 2017 How to manage Large Events

All Things Come In 3 February 1, 2015 January 9th, 2016 April 1st, 2017 3 of the largest sporting events in 3 consecutive years City invested time and money Other events past 10 years, NFL & NBA Allstar games, wrestlemania, Copa America Goal to be established as a major player to host national and international events

2017 NCAA Final Four Runner up to Dallas in 2014 1st time on west coast since Seattle in 1995

2017 NCAA Final Four Events downtown Half a million people for all events over the course of the weekend Music Festival hit capacity on two of the three nights

Calendar of Events Event Thur. 3/30 Fri. 3/31 Sat. 4/1 Sun 4/2 Mon 4/3 NABC Annual Convention Final Four Salute Presentation Fan Fest Music Festival Final Four Friday * Semi-Final Games * NABC Guardians of Game Award Show Final Four Dribble Tip-off Tailgate * National Championship Game * Opening Day vs the Giants Suns vs Houston Rockets * Events at University of Phoenix Stadium

March Madness Music Festival

Planning Downtown Campus Wayfinding, trolleys

Streets and Traffic Working Group Agenda Streets and Traffic Working Group Members Objective Police Public Transit Homeland Security ADOT Public Works Trafficade Downtown Phoenix Inc. Organizing Committee Execution of a safe and efficient transportation plan that minimizes impacts to non-event goers and creates a very positive experience for drivers, pedestrians, bicyclists, transit riders and private transportation users attending the NCAA Final Four events in downtown Phoenix.

Infrastructure Staff Essential Components Live feed camera’s (CCTV’s) Agenda Essential Components Infrastructure Staff Live feed camera’s (CCTV’s) Freeway Management Center Traffic Management System Organizers Operations Staff Traffic Management Staff Field Staff

Operations - All Things Come in 3 Emergency Operations Center Traffic Management Center Accidents Excessive Delays Control Messaging Traffic Operations Center

Operations Plan Diagram Incident Management Team (EOC) Police Downtown Operations Unit (Field) Right-of Way Management Field Staff Marketing and Media Team Barricade Company (Trafficade) COP Traffic Management Center Signal Maintenance Field Staff ADOT Traffic Operations Center Department of Public Safety Center of it all is the EOC. Ready for all emergencies.

Responsive Field Crews Agenda Responsive Field Crews Temporary ADA access (Superbowl) Flooding (Superbowl)

ADOT Freeway Management System

ADOT FMS - Collisions DWNTN PHX EVENTS USE I-10 EAST 7TH AVE EXIT Helped disperse flow through the arterial system

ADOT FMS - Collisions DWNTN PHX EVENTS USE I-10 EAST 7TH AVE EXIT

ADOT FMS - Collisions DWNTN PHX EVENTS EXIT JEFFERSON ST COLLISION I-10 EB BLOCKING HOV LANE Collision

ADOT FMS – Diamondbacks Opening Day DWNTN PHX EVENTS USE I-10 EAST WASHINGTON EXIT

ADOT FMS – Opening Day Egress DWNTN PHX EVENTS USE I-10 EAST WASHINGTON EXIT Sunburst plan – Diamondbacks game Helps maximize egress by metering the flow into downtown by restricting movements at key intersections. For example, 7th St and Washington, EB Washington is forced to turn north or south on 7th St. Sunburst Plan Traffic Control Plan to restrict ingress to maximize egress

ADOT FMS – Opening Day Egress DWNTN PHX EVENTS USE I-10 WEST 7TH AVE EXIT Sunburst Plan Traffic Control Plan to restrict ingress to maximize egress

Downtown Traffic and Security Camera Surveillance Agenda Downtown Traffic and Security Camera Surveillance 22 Permanent Cameras 11 Portable Cameras Major Surveillance Corridors NCAA Final Four Event Campus 7th St 7th Ave Washington Jefferson Roosevelt Van Buren McDowell Accessible in TMC and EOC

Camera Locations Temporary CCTV’s Installed Permanent CCTV’s at Traffic Signals Homeland Security installed cameras around Hance Park

Signal Timing Infrastructure COMPREHENSIVE COMMUNICATIONS NETWORK CAPABLE TRAFFIC CONTROL SYSTEM TRAFFIC SIGNAL COORDINATION

Oversaturation on Roosevelt St Lightrail Line

Mitigation Strategies One Direction Saturated – Negative Offset Both Directions Saturated – Simultaneous Offset

Light Rail Interference Light Rail Line 131% More riders than a normal Weekend.

Next Steps Current ITS Projects Reverse Lanes Study – Pre-Design Central Phoenix ARID Project – Design Sonoran Desert Ring Fiber Project – Construction Travel Time Project (7th Ave/7th St) – Construction New Project Funding Infrastructure Replacement Budget Justified Signals Budget (3 Signals, 5 HAWKs, 5 RRFB’s 4 Removals) ITS Advanced Traffic & Management Budget ADA Improvements at Signals Budget $625K $1.6M $1.5M $700K Current ITS Projects Reverse Lanes Study – Pre-Design Central Phoenix ARID Project – Design Sonoran Desert Ring Fiber Project – Construction Travel Time Project (7th Ave/7th St) – Construction 4.5 million in signal and ITS funding in CIP