Status Update for Reliability/Market Power Mitigation Assessment

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
WECC Reliability Based Control Field Trial
Proposed RISC 2014 Deliverables, Activities, and Calendar For Discussion Andy Rodriquez, Director of RRAC January 14, 2014.
January 6. January 7 January 8 January 9 January 10.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
NERC LTRA Update / CDR Capacity Counting Issues
NTTG 0rder 1000 Stakeholder Meeting March 28, 2012 Radisson Hotel Portland, Oregon 1.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Market Credit Working Group update to the Wholesale Market Subcommittee 04/06/
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org Transmission Expansion and Cost Allocations for FERC SPP-Entergy CBA 1.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
SunSatFriThursWedTuesMon January
1 TAC Report to the ERCOT Board February 16, 2005.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
SPP.org 1. Status Update: Retail Open Access for ETI within SPP Stakeholder Meeting June 20 th, 2008 Austin, TX.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
ERCOT – MISO DC Tie Study Comments
Retail Market Subcommittee Update to TAC May 6, 2004.
SPP-Entergy Market Power Analysis Update Presented By: David B. Patton, Ph.D. President, Potomac Economics April 16, 2008.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Every Student Succeeds Act January Christopher Woolard Senior Executive Director, Center for Accountability and Continuous Improvement Colleen D.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Balancing Reserve Update Peter Bingham 26 th Feb 2014.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Guidelines for RTF Measure Costs and Benefits Guidelines (formerly Cost and Non-Energy Benefits Guidelines) Proposal of Guidelines to the Regional Technical.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
LNBA Subgroup: Avoided Transmission Value
TEXAS NODAL (ERCOT REVISIONS)
Status Update for Reliability/Market Power Mitigation Assessment
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
Annual Strategic Planning Draft Timeline and Process
Market Participant Readiness Tracking
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Project Update and Summary of Project Priority List (PPL) Activity
Commercial Operations Sub-Committee Update to TAC
SPP-Entergy Market Power Analysis
Tax Rate Redux Sue Anne Athens, CIO August 2016.
Process, timeline and overview
College of Alameda Integrated Planning and Budgeting Process
Proposed RISC 2014 Deliverables, Activities, and Calendar
Department of Environmental Quality
Fiscal Year Budget Plan
Metrics for process and Projects
Water Scarcity & Droughts Policy in the EU Gap Analysis
Presentation transcript:

Status Update for Reliability/Market Power Mitigation Assessment Stakeholder Meeting February 21, 2008 Austin, TX

SPP QPR Analysis : Objective Reliability Assessment Identify Transmission upgrades to serve ETI under SPP RTO footprint using SPP planning criteria ETI planning criteria will also be evaluated Market Power Mitigation Assessment Identify Transmission upgrades that could potentially produce net benefits for the rate payers in SPP footprint including ETI Comparable to ERCOT QPR assessment

Study Process Overview with Stakeholder Involvement Study Tracks Reliability Market Power Prod Cost ROA Revise Assessments Considering Stakeholder Feedback Work Plan Development Stakeholder Meeting Post Results Stakeholder Meeting Stakeholder Input Prepare Final Report Post Results Finalize & Post Results Stakeholder Meeting Finalize Results Submit Report to PUCT

Reliability Assessment : Study Details Status Quo case (2012 Summer Peak Condition) Modified Base Case Planned and approved transmission upgrades in SPP and Entergy footprint along with known generation addition to meet SPP planning criteria Reliability Must Run (RMR) requirements will be considered Address Market Power Issue within ETI

Market Power Mitigation Assessment - Process Use New Energy Associates/Ventyx software PROMOD IV and Powerbase for the analysis Current process is posted on SPP Website under EMMTF http://www.spp.org/publications/EMMTF_Draft_31_Clean_03-28-06.doc Any changes to the EMMTF method will be documented and detailed in the analysis portion of the ETI Study Report (e.g., the use of adjusted production cost as opposed to production cost)

Market Power Mitigation Assessment - Methodology Use 2012 as reference year SPP recommends that adjusted production cost analysis be calculated for the SPP footprint including ETI Following Change Cases will be developed in PROMOD IV Modified Base Case developed through Reliability Assessment Change Case 1 with Market Power addressed for ETI Change Case 2 with incremental Economic Upgrades Benefit to Cost analysis should be conducted on each of the above scenarios as referenced to the Status Quo base case

Current Status on SPP QPR study Kick off meeting was held on January 11, 2008 SPP Technical team has issued data request to ETI in the second week of February for Reliability and Market Power Mitigation Assessments Study Models Finalized Reliability Assessment : March 2008 MP Mitigation Assessment : April 2008 Preliminary Results Expected Reliability Assessment : June 2008 MP Mitigation Assessment : August 2008

Questions?

Mak Nagle Manager, Technical Studies and Modeling 501-614-3564 mnagle@spp.org