2 Fraunhofer INT Euskirchen Germany

Slides:



Advertisements
Similar presentations
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Advertisements

CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
More than a simple piece of glass. Unleashing the Light around the CERN Accelerators ST-EL-OF Unleashing the light around the accelerators is may be a.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Round table magnet discussion and conclusions CARE-HHH IR’07 animated by W. Scandale and F. Zimmermann.
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Optical absorption in commercial single mode optical fibers for the LHC machine T. Wijnands †, L.K. De Jonge †, J. Kuhnhenn ‡, S. K. Hoeffgen ‡, U. Weinand.
Radiation Tolerant Optical Fibres for LHC Beam Instrumentation Radiation Effects T. Wijnands †, L.K. De Jonge †, J. Kuhnhenn ‡, S. K. Hoeffgen ‡, U. Weinand.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
M. Körfer, DESY Salzau Light guide dosimeters and loss monitors H. Henschel, J. Kuhnhenn Fraunhofer-Gesellschaft INT M. Körfer, K. Wittenburg.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Optical Fibres for the LHC Machine and Experimental Areas Optical Fibre Meeting 3 October 2002 Luit Koert de Jonge/ST-EL-OF.
Radiation damage to LHC fibres Andy Presland (AB/ABT/EET) Thijs Wijnands (TS/LEA) L.De Jonge (TS/EL) T. Sugito (Draka Comteq NKF Kabel B.V)
Slide 1 5th LHC RADIATION WORKSHOP, CERN, , Jochen Kuhnhenn, Fraunhofer INT Radiation tolerant fibres for LHC controls and communications.
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
Collimator and beamline heating External Review of the LHC Collimation Project CERN Wed 30/6/2004.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
The integration of 420 m detectors into the LHC
Radiation Tests on optical fibres for the LHC machine T. Wijnands, D. Ricci CERN EN department Fraunhofer INT.
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
News and Introduction from CERN June 15th, 2005
Lessons learnt from CERN experience
Distributed Optical Fibre Radiation and Temperature Sensor (DOFRS)
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
on behalf of the CLIC active pre-alignment team
Micro duct cabling at CERN
2007 IEEE Nuclear Science Symposium (NSS)
Distributed Optical Fiber Radiation and Temperature Sensing at High Energy Accelerators and Experiments Iacopo Toccafondo, EN-EA.
Radiation monitoring and follow up during LHC commissioning
Cryo equipment strategy in the R2E context
Next generation rad-hard links
Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain
Installation of an Instrument on a CERN machine
TE-MPE LS1 review Vision from EN-EL(CF)
SLHC Radiation Test Results
352MHz Klystron Control for the 3MeV Linac test stand
Irradiation Facilities Questionnaire
Field quality to achieve the required lifetime goals (single beam)
LS1 TE/MPE/EE CABLE ACTIVITIES
Distributed Optical Fibre Radiation and Temperature Sensing at High Energy Accelerators and Experiments Update on installation of DOFRS in PS-Booster.
The 11T cryo-assembly: summary of design and integration aspects
Status of the PANDA Solenoid Magnet Production in BINP
TEST PLANS for HL LHC IT STRING
Wired and Wireless Troubleshooting
BLM planning 03/03/2014.
Radiation tolerant fibres for LHC controls and communications
LINX LINear collider IR X-ing facility at SLAC Snowmass 2001 July 11 Andrei Seryi, SLAC for NLC collaboration.
LHC External Collimation Review
100W Fiber Collimator PRODUCT BRIEF Advantages Overview
Presentation transcript:

2 Fraunhofer INT Euskirchen Germany Radiation tolerant fibres for LHC beam-instrumentation Project and Engineering Aspects L.K. De Jonge1, T. Wijnands1, J. Kuhnhenn2, S. K. Hoeffgen2, U. Weinand2 1CERN, TS Department 2 Fraunhofer INT Euskirchen Germany 6th LHC Radiation Workshop : 29-30 November 2007 CERN

Radiation tolerant fibres for LHC beam-instrumentation Outline Project overview and blowing technique Dealing with radiation constraints MC results IR3/IR7 Installation of bypass ducts LHC P4-P3, P6-P7 and P8-P7 Selection and development of radiation resistant fibres Fujikura fibres the most tolerant Draka Comteq micro cable production Installation status IR3/IR7 Fibre monitoring (JDSU/ATLAS system) Concluding remarks 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Radiation tolerant fibres for LHC beam-instrumentation 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Optical cabling with micro ducts Blow 7mm micro ducts Blow micro optical cables Modular and flexible Easy to replace cables high precision 25mm polyamide tube 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Production of 25mm polyamide precision duct polyamide extruder production in cooled water under vacuum 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Blowing of micro ducts and micro cables blowing of 7x7mm HDPE micro ducts blowing of a micro cable 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Beam instrumentation lay-out Adjacent octant Right Adjacent octant Left 3 4 3 5 5 4 1 2 3 4 5 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Beam instrumentation at P3 right (max.3600m) 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Cable blowing calculation UJ32right (2500m) 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Blowing speed versus time 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Blowing test at Draka Comteq factory 2650m 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Radiation constraints Early studies were only done for arcs (BI max. 6 dB attenuation) TCC2 test (500 Gy/1999-2000) Test at Saclay in 2004/Poseidon irradiator CO60 (3 kGy) to test bloweability and confirm attenuation behavior MC results IR3/IR7 in 2005 (K.Tsoulou et all) 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

MC simulations collimation area IR7 104Gy/yr Dose rate distributions along the tunnel in Gy/year 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Radiation constraints Early studies were only done for arcs TCC2 test (2500 Gy) Test at Saclay in 2004/Poseidon irradiator CO60 (3 kGy) to test bloweability and attenuation MC results IR3/IR7 (rad. levels much higher then arcs) Standard G652.D 9/125 fibre would not resist Contract with Fraunhofer INT to select the most tolerant fibre Screening test Detailed test with parameter variation (dose rate, temperature, power) Mixed field test (at CERN TCC2) QA sample test New test at Saclay to test only bloweability (300 kGy) 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Ducts and fibre irradiation Poseidon/Saclay 3/300 kGy 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Blowing test at the Draka factory (1000m) blowing out of cable test loop 2x1000m 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Blowing test at the Draka factory (1000m) re-blowing of a cable test loop 2x1000m 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Blowing speed not altered after 300 kGy 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Microduct test after irradiation at 300 kGy 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Backup solution with extra ducts IR 3 : Momentum Cleaning IR 7 : Betatron Cleaning 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Beam instrumentation lay-out extra ducts P7left-right from P6 from P8 1 2 3 4 5 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Bypass ducts (5) blowing P4 to P3 2800m 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Fraunhofer study Fibre and cable production Draka and Fujikura developed the 2 most tolerant fibres normal Draka G652.D 9/125 fibre already very good Finally Fujikura developed the best radiation resistant fibre first production of 500 km for 7BI-right contract with Fujikura for 2000 km for 7BI-left and 3BI-right production rate 300 km/month to improve production lengths CERN accepted α ≤0.5 dB/km Draka Comteq produced the micro cables (8, 12 and 24 fibres) total of ~250 km cable produced and delivered at CERN 7BI has been finished just in time before cooling this sector 3BI-right remains to be done just within LHC schedule 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Beam instrumentation radiation monitoring Adjacent octant Right Adjacent octant Left 3 4 3 5 5 4 1 2 3 4 5 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Fibre monitoring system ATLAS/JDS-Uniphase to other cables under test OTAU OTDR λ1550 nm Optical Switch Optical Time Domain Reflecto meter RTU Remote Test Unit OTx ORx Cable under test System Management up to 100 km long Internet CERN intranet WEB Client 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Radiation tolerant fibres for LHC beam-instrumentation Concluding remarks Confident that the radiation aspects have been properly addressed BI problem solved (total attenuation will remain under 6 dB, BI constraint) Bypass ducts available as backup solution Communication fibres no problem either (larger power margins) Project successful The blowing technology has proven to be the right choice Excellent and productive collaboration CERN, Fraunhofer and Industry Fair and tough competition between Draka and Fujikura to develop the most tolerant single-mode optical fibre Fibre and cable production by industrial process (repeatable) Looking forward to finalize our studies (report) Further studies Fibre monitoring Collaborations 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation

Radiation tolerant fibres for LHC beam-instrumentation And last but not least Many thanks to Fraunhofer INT/DE Studies and measurements Draka Comteq Telecom/NL Optical fibre supply and installation contract Mauerhofer&Zuber/CH Optical fibre installer Fujikura Ltd/GB and Japan Radiation resistant optical fibre production CERN and colleagues involved And special thanks to Thijs Wijnands and Jochen Kuhnhenn 29.11.2007 Radiation tolerant fibres for LHC beam-instrumentation