CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
Status of the KM3NeT Project  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards Implementation 3rd Workshop.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
WP2 meeting, Oct 2006, CPPM Claudine Colnard - NIKHEF Claudine Colnard, Ronald Bruijn, Eleonora Presani, Siemen Meester, Paul Kooijman (presented by Maarten.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
KM3NeT International Solvay Institutes 27  29 May 2015, Brussels, Belgium. Maarten de Jong Astro-particle and Oscillations Research with Cosmics in the.
Disk WP-4 “Information Technology” J. Hogenbirk/M. de Jong  Introduction (‘Antares biased’)  Design considerations  Recent developments  Summary.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
News from KM3NeT Uli Katz ECAP / Univ. Erlangen MANTS Meeting, Garching, October 2013.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
NEMO-O DE NEMO First results from the NEMO Test Site G. Riccobene, for the NEMO Collaboration The NEMO Collaboration is performing the Phase 1 of the project,
What? Deployment of the first full KM3NeT string, a.k.a Detection Unit. Thanks to Aart Heijboer for the nice drawings!
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
KM3NeT – Stautus and Future Uli Katz ECAP / Univ. Erlangen th International Workshop on Next Generation Nucleon Decay and Neutrino Detectors.
KM3NeT M. de Jong Staff overleg 12 Mei  M. de Jong, P. Kooijman, G. v.d. Steenhoven, E. de Wolf (R. v. Dantzig, J. Engelen, P. de Witt Huberts,
Report to the ASC on project organization and critical issues E. Migneco ASC meeting, Amsterdam, march
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
Towards the TDR KM3NeT-DS WPx Meeting, Paris, Feb , 2009 Uli Katz ECAP / Univ. Erlangen  My private views  Basis for discussion  Decisions taken.
The Neutrino Telescope of the KM3NeT Deep-Sea Research Infrastructure Robert Lahmann for the KM3NeT Consortium Erlangen Centre for Astroparticle Physics.
Status report Els de Wolf Annual Meeting 2011, Nikhef.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Calibration and Instrumentation: Overview and General Issues Robert Lahmann WPFL meeting Amsterdam 6-July-2010.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
CEA Saclay – Institute of research into the fundamental laws of the Universe PPM DU Pre Production Model Detection Unit Status and plans Th. Stolarczyk.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
Multi-PMT DOM P.Kooijman University of Amsterdam-GRAPPA Presentation for SSC.
Pre-Production Models for KM3NeT
PPM 30/10/2012. In-situ validation programme Oct/Nov 2012: VEOC prototype in Atlantic (monitor fibres, pressure) Dec(?) 2012: multi-PMT.
Deep-sea neutrino telescopes
DOM acceptance and calibration
On behalf of Patrick Lamare
Jan 2016 Solar Lunar Data.
KM3NeT multi-km3 neutrino telescope: perspectives
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Concluding remarks E. Migneco
Pasquale Migliozzi INFN Napoli
Els de Wolf, Nikhef/UvA KM3NeT WP345-meeting 23 February 2009
T. Eberl for Robert Lahmann and the Erlangen acoustic group
Acoustic Position Calibration of the KM3NeT Neutrino Telescope
miniDOM report Vlad Popa
Overview of AMADEUS and Positioning for KM3NeT
KM3NeT: where are we and where do we go
Point-to-point connection between each DOM and the shore station
VLVnT08 Summary Talk E. Migneco.
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Acoustic Measurements in ANTARES: Status and Aims
Presentation transcript:

Els de Wolf 20 February 2012, Catania WPF/L Els de Wolf 20 February 2012, Catania

PPMs  The Pre-Production Models are deliverables of KM3NeT-PP PPM of the optical module PPM of the calibration system PPM of the readout/DAQ system PPM of a ‘small scale’ detection unit Final deliverable: description of the Production Models 

PPM-objectives Questions to be answered with these PPMs: Can we deploy? Can we calibrate? Can we measure signals? Can we get the signals to shore? Can we measure muon signals? What do we learn for the PM? December 2010: Report delivered to EC describing the PPM models (KM3NeT_FL_REP_PPM_description)

PPM 20 storeys, 6m bars, for DU distance of 180m 2 storeys with ‘active’ DOMs To be deployed and connected at….?

Components

Adjusted PPM test programme for in-situ validation of technology PPM-PMTunit: ‘mini-DOM’ in ANTARES Singles rate and coincidence measurements with 3” PMTs PPM-DOM: ‘full’ DOM in ANTARES Long term benchmark of the optical module Test of KM3NeT readout electronics DU deployment tests in Toulon area (5 storeys) Test of the design and integration of the detection unit (DU) Test of deployment method PPM-DU-Mechanics: deployment tests in Toulon area (20 storeys) Test of full unfurling and stability of tower PPM-DU-Backbone: Deployment of mechanical DU in Pylos area (20 storeys) Test of reliability of backbone handling and DOM penetrators PPM-Operation Deployment and connection of ‘mini-tower’ at Capo Passero Test of KM3NeT fibre optics and data transmission Test of detector operation Using the facilities and services of the ANTARES, Capo Passero, Pylos sites i.e. An operational telescope, cables to shore, shore stations, RoVs, deployment vessels, calibration devices time

PPM-PMTunit: ‘mini-DOM’ in ANTARES Objective: Measurement of singles rates and coincidences with 3” PMTs Delivery of info for simulation software and PMT specs for tendering Implementation: 5 PMTs only (limited by ANTARES readout) Integration of mini-DOM in ANTARES instrumentation line

PPM-DOM: ‘full’ DOM in ANTARES Objective Long term benchmark of DOM Test of KM3NeT readout electronics Delivery of Production Models for DOM, calibration, readout/DAQ, transmission network Implementation: Install a DOM in Instrumentation Line of ANTARES Adapt optical data transmission to ANTARES network

PPM-DU mechanics and deployment Objective Test of deployment and unfurling of full detection unit Test of handling of backbone cable during deployment and unfurling Delivery of Production Models of DU mechanics Delivery of Production Model of backbone Implementation Several test deployments with smaller DU models Test deployments with 20 storey DU model

PPM-DU backbone Objective Implementation Test of handling of backbone cable during deployment and unfurling Test of penetrators Delivery of Production Models of backbone Implementation Shallow water tests with backbone unfurling Install backbone with autonomous fibre monitoring devices on 20 storey DU If possible, use Delta Berenike for deployment/recovery

PPM-Operation: ‘mini-tower’ at Capo Passero site Objectives Test of KM3NeT fibre optics and data transmission network Test of detector operation Delivery of Production Modules of all components (update) Implementation Install 3 DOMs (two with ETEL, one with Hamamatsu PMTs) Install ‘active’ backbone cables Install ‘active’ storey cables Connect to the existing seabed infrastructure and use the shore station facilities at the Capo Passero site

Prelim planning PPM projects Deployment Production Models Delivered Mini-DOM in ANTARES Mar-Jul 2012 PMTs (Jun-Aug 2012) Full DOM in ANTARES Jul 2012 DOM/calibr./readout/DAQ (Sep 2012) DU-test deployments Apr 2012 Mechanical DU Sep 2012 DU mech. unfurling/Backbone (Oct 2012) Mini-tower Oct 2012 Update on PMs (Dec 2012) Planning needs to be updated during the WPF/L parallel sessions

PPM-objectives Questions to be answered with these PPMs: Can we deploy?  Mechanical DU Can we calibrate?  DOM in Antares, mini-tower Can we measure signals?  idem Can we get the signals to shore? idem Can we measure muon signals?  mini-tower What do we learn for the PM?  next slides….

WPF/L today PMTs mini-DOM in Antares DOM in Antares Calibration Optical network Timing

Tomorrow Electronics DU mechanics and deployment Backbone Assembly and integration

14:30 Intro Els de Wolf 14:15 PMT measurements at ECAP Oleg Kalekin 14:40 PMT measurements at Nikhef Maria Tselengidou 15:00 PMT specs for tendering and alternative for glass PMT lense Paul Kooijman 15:20 CoCo chip on PMT base Eric Heine 15:40 PPM-PMTunit: status and planning mini-DOM in Antares Vlad Popa 16:00 PPM-DOM: planning DOM in Antares 16:20 16:50 PPM-DOM: acoustics Giorgio Riccobene 17:10 PPM: Optical time calibration Umberto Emanuele 17:30 PPM: optical network Jan Willem Schmelling 17:50 Timing of the optical network Henk Peek