26.10.2016 EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.

Slides:



Advertisements
Similar presentations
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Advertisements

Performance New requirement s for circuit integrity: enhanced cables BS : 2002 Fire Detection and Fire Alarm Systems for Buildings Part 1: code.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Optical Fibres for the LHC Machine and Experimental Areas Optical Fibre Meeting 3 October 2002 Luit Koert de Jonge/ST-EL-OF.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Extraction and beamline progress B.Goddard TE/ABT.

SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Enterprises systems : Enterprise Wireless Network Solution Provider
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
SPS LS1 Planning meeting (N019) 04/09/13
Micro duct cabling at CERN
SLAWG #15 ZS fiducialisation and alignment today
EYETS Works EN-EL [ FC excluded ]
Schedule CM SPS G.Vandoni.
YETS & LS2 Works EN-El on LHC / Power distribution
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
BA6 – crab cavity activities in EYETS
EYETS LHC 2016/2017 Works EN/EL/CF
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
TE-MPE LS1 review Vision from EN-EL(CF)
SPS - EYETS 2016/17 Vacuum systems planning
LIU–PLI report LIU SPS meeting.
YETS & LS2 Reminder G. Girardot 20 juin 2017.
EN 4946 – Refurbishment of Electrical Substations
the high-voltage network of CERN ToMORROW
Crab Cavities Activities
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
Status of the MOPOS BI TB – 26th June 2014.
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EN-STI activities in LHC during EYETS
SPS LS1 Planning meeting (No.34) 16/04/14
SPS CC: Final plan for interlocking of crab cavities in SPS
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
SPS East Extraction bump inhibit during COLDEX operation
SPS activities during LS2 TE-EPC (Power Converter Group)
Short LHC-TS week 38 Confirmed by LMC on 16th August
YETS & LS2 Works EN-EL / Power distribution
Extension SR1 WP3 Electrical installations
Status with crucial LSS5 kicker transmission line cables
K. Foraz on behalf of OSS members
BE-ICS work for SPS Safety Systems
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Business opportunities related to CERN electrical network
ARIEL Phase I Operations
LHC Morning Meeting - G. Arduini
,. . ' ;; '.. I I tI I t : /..: /.. ' : ····t I 'h I.;.; '..'.. I ' :".:".
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LIU-SPS review for BI (no BWS)
SPS Planning meeting for LS2 #25 Vacuum sectors status
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
BA6. BA6 Sprinkler Station Structure Sprinkler Station Structure The metal sheet has been added for being able to install the.
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

26.10.2016 EN-EL-FC Activity Jeremy Blanc, EN-EL-FC

Fibre Optics Activity SPS BPM Upgrade Phase 2 Installation of ducts, blowing of cables and termination. BA2 Surface and Shaft 650 m of ducts / 1875 m of optical cable 14 days BA3 Surface 50 m of ducts / 250 m of optical cable 7 days BA4 Surface 30 m of ducts / 150 m of optical cable TS4- 2525 m of ducts / 5414 m of optical cable 17 days 26.10.2016 Jeremy Blanc, EN-EL-FC

Fibre Optics Activity Replacement of Radiation Sensitive Optical Fibres Removal and blowing of cables. TI2 (from RA3830=BA7) 17 cables / 16.6 km 11 days TI8 (from RA1228=HCA442) 31 cables / 41.3 km 17 days TI2 TI8 26.10.2016 Jeremy Blanc, EN-EL-FC

Fibre Optics Activity Various Optical Fibres Installation Pulling/Blowing of cable. BA3 Surface 2 cables / 95 m 2 days BA4/BB4 Surface 1 cables / 150 m 1 day BA5 Surface 3 cables / 90 m 3 days 26.10.2016 Jeremy Blanc, EN-EL-FC

Fibre Optics Activity Crab Cavity Installation of ducts + Pulling/Blowing of cable. BA6 Surface 1 duct / 90 m 4 cables / 360 m 4 days TA6 Alcove 1 cable / 30 m 1 day LSS6- 2 cables / 175 m 3 days 26.10.2016 Jeremy Blanc, EN-EL-FC

Fibre Optics Activity New SPS Access System Pulling/Blowing of cable. ECA5 2 cables / 200 m 4 days BA6 Surface 1 cables / 100 m Pilot Installation 26.10.2016 Jeremy Blanc, EN-EL-FC

Fibre Optics Activity Planning & Constraints False floor need to be opened for installation in surface TI2 & TI8 will be blocked by drums during the cables removal (no coactivity) TS4- will be blocked during the duct installation (no coactivity) Support: Transport for moving OF cable drums Radioprotection for checking the OF cables removed from TI2 & TI8 26.10.2016 Jeremy Blanc, EN-EL-FC