Background B513 built in early 1970’s for mainframe era.

Slides:



Advertisements
Similar presentations
ERGON ENERGY - Warwick to Stanthorpe 110 kV sub-transmission line proposal Prepared for the Community Reference Group STANTHORPE PRESENTED on 11 TH April.
Advertisements

State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Why London needs the Thames Tunnel IEMA Conference 2011 Optimising Infrastructure within environmental limits Tuesday 15 November 2011.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Auxiliary Services CWU Board of Trustees February 4, 2010.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Business Crisis and Continuity Management (BCCM) Class Session
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Preliminary Studies of the Electric Power Distribution for CLIC
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
December 2008 Sandia Advanced Microgrid R&D Program Advanced Microgrids – Supporting Use of Renewable, Distributed, and Smart Grid Technologies for Assured.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Computer Centre Upgrade Status & Plans Post-C5, June 27 th 2003 CERN.ch.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Nikhef/(SARA) tier-1 data center infrastructure
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
A New Vision for the Computer Centre Tony Cass —
Computer Centre Upgrade Status & Plans Post-C5, October 11 th 2002 CERN.ch.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
CERN - IT Department CH-1211 Genève 23 Switzerland t Power and Cooling Challenges at CERN IHEPCCC Meeting April 24 th 2007 Tony Cass.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
Development of CAD concept model of package transformer substation (PTS) Aleksandra Seledkova Perm National Research Polytechnic University.
CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices.
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
White Pigeon Community Schools
CMS Centre Project - Green Light Meeting
YETS & LS2 Works EN-EL / Power distribution
Progress Briefing - Energy Initiative
SUB-STATIONS.
“Electricity Supply Reliability Project - Additional Financing”
YETS & LS2 Works EN-El on LHC / Power distribution
UMCP Learning Objectives
Distribution substations
CERN Data Centre ‘Building 513 on the Meyrin Site’
(Potential) Site and Utilities
Natural Gas Infrastructure Assessment
the high-voltage network of CERN ToMORROW
Sinking Fund Millage Proposal
Presented by: Jim Hefferan Project Director ICB Upgrade Project
the CERN Electrical network protection system
Electrical and electronic systems projects
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
YETS & LS2 Works EN-EL / Power distribution
Enterprise Content Management Owners Representative Contract Approval
College West Residence Renewal Project
Town of Newbury Proposed New Fire Station
HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017.
Modular Edge-connected data centers
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

A New Substation For B513 Site Committee February 14th 2002 Tony Cass/IT Anne Funken/ST

Background B513 built in early 1970’s for mainframe era. Refresh needed prior to LHC: Replace infrastructure before, not during LHC operation Improve reliability for distributed computing Meet space and power needs of LHC computing Initial Review in 2000 resulted in 3 step program: Add space to meet LHC requirements and house equipment during Machine Room refurbishment Planned in 2001; now being implemented Upgrade electrical and air conditioning infrastructure Planning phase now Refurbish existing Machine Room

Renewal of Electricity Supply Include B513 in the sitewide 18kV loop. To improve operational reliability. Replace today’s single UPS by A “Physics” UPS to cover the full load for short interruptions, and A “Critical Services” UPS to maintain essential services only (e.g. networking and desktop computing infrastructure) in the event of a serious failure. Replace ageing low voltage switchgear

Substation Requirements Total space requirements estimated at 380m2. 180m2 of space in B513 can be reused leaving a requirement for 200m2 of additional space. A number of options for providing this additional space have been considered. These include Reuse of existing technical areas in the B513 basement Reuse of the “archive store” (R-053) in B513 Various sites around B513 near to existing transformers On the B513 roof. The favoured location in terms of logistics, cost and safety is a “bunker” on the Restaurant 2 side of B513.

View from B31 Today

View from B31 with Substation

Looking Towards B31

Summary of Impact on B513 area Visual impact The substation is large, but the visual impact is not unreasonable when seen from B31. Road Traffic and Parking The 10mx20m footprint leads to the suppression of 7 parking spaces. Access to loading doors is preserved. The bunker extends into the lane for Jura bound traffic, but adequate width is still available. Additionally, the central parking spaces could be moved towards Restaurant 2, evening the widths of the two lanes. Office Space and Safety 3 offices in the B513 Barn would have to be suppressed. However, these offices do not meet health and safety standards and are anyway being reallocated to equipment. As elsewhere at CERN, “dry” transformers are used with a much reduced fire risk.

Proposal We propose to undertake an in-depth study of the substation in this location. This study will take 4-6 months, and include external consultancy for the civil engineering at a cost of ~40kCHF. The time and costs are in line with those for the design and study for B613 (which is of a similar area). Once these studies are complete we will present the final project to the Site Committee prior to the construction phase.