David Anderson Mechanical Option

Slides:



Advertisements
Similar presentations
DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Advertisements

Chilled Beam Presentation
The Hearst Tower 959 Eighth Avenue New York, NY
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Ceiling Radiant Cooling Panels as a Viable Distributed Parallel Sensible Cooling Technology Christopher L. Conroy, E.I.T. L. D. Astorino Companies, Pittsburgh.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
PSU Building Thermal and Mechanical Systems Laboratory Environment A/E Kurt M. Shank, M.S. & Stanley A. Mumma, Ph.D., P.E. College of Engineering Department.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
North Pocono High School
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Rebecca S. Allen THE PALESTRA BUILDING Optimizing Energy Efficiency of the Palestra Building London, England.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
SENIOR THESIS PRESENTATION
Energy Efficient System Design: Geothermal System Coupled with Chilled Beams and DOAS Montgomery College New Science Center.
Brian Ault – Mechanical OptionSpring 2008 Senior ThesisBarshinger Life Science & Philosophy Ann & Richard Barshinger Life Science & Philosophy Building.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Architectural Engineering Mechanical Option Ft. Detrick Defense Medical Logistics Center Building Systems Redesign April 16, 2008 Senior Thesis Presentation.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
NRUCFC Headquarters Building Sterling, VA Architectural Engineering Senior Thesis Margaret McNamara | Mechanical Option Advisor | Dr. Stephen Treado.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Paul Roberts Senior Thesis 2010 Construction Management.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
Lehigh Valley Heritage Center Jarod F. Stanton Mechanical Option Penn State Architectural Engineering.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
University of Delaware Center for the Arts Newark, DE Karen Schulte Mechanical Option Spring 2006.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Julie Thorpe Howard Hughes Medical Institute’s Landscape Building Ashburn, Virginia Julie Thorpe Mechanical Emphasis Penn State Senior Thesis Architectural.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Outreach Innovation Building Kyle Pepperman The Pennsylvania State University Architectural Engineering Senior Thesis Spring 2005.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
ENVIROCENTER PHASE II JESSUP, MD
Eastern High School Baltimore, MD
Grunenwald Science and Technology Building
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Munters DOAS, Chilled Beams and VRV
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Feasibility of Ice Storage
THERMAL STORAGE FEASIBILITY STUDY
The Bond Street Wharf Baltimore, Maryland
Senior Thesis Presentation
Abbas Shirian, PE Certified GeoExchange Designer
Lehigh Valley Heritage Center
Tri-Valley Jr./Sr. High School Hegins, PA
Presentation transcript:

David Anderson Mechanical Option Clemson University’s Advance Material Research Laboratory David Anderson Mechanical Option

Clemson University’s Advance Material Research Laboratory Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions

Clemson University’s Advance Material Research Laboratory Building Background Project Team Owner: Clemson University Architecture Firm: IDC Architects Contractor: Manhattan Construction Landscape Architect: Arbor Engineering Interior Designer: IDC Architects First LEED Certified Facility In South Carolina Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions LEED SILVER $18.5 Million Completed July 2004 Photo from Google Earth Photo from Google Earth Design-Bid-Build Location: Anderson, South Carolina

Clemson University’s Advance Material Research Laboratory Building Background Location: Anderson, South Carolina Occupant: Clemson University Size: 111, 270 sq. ft. Occupancy: Offices Research Laboratories Clean Rooms Conferencing Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions Offices Laboratory Support Shared Spaces/Circulation Laboratories Support/Services

Clemson University’s Advance Material Research Laboratory Existing Conditions Existing Conditions Electrical: Structural: Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions (1) 2500kVA Transformer (5) 30-112 kVa Transformers Steel Construction Concrete Slabs 300 kW Diesel Fired Stand-By Generator Lighting: Ground: 5” Slab On Grade 4x4 Welded Wire Fabric #4 Bars In Pits and Recesses Elevated Floors: 2-1/2” Slab 1-1/2” Deck 24” x 48” Fluorescent Fixtures T8 and T5 Lamps Quad Compact Fluorescents

Clemson University’s Advance Material Research Laboratory Existing Conditions Existing Conditions Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions Mechanical: Mechanical: (15) AHU’s (3) serve VAV Boxes (2) Gas Fired Boilers 3,348 MBH each (4) MAH’s (1) Electric Boiler 4,094 MBH (2) Cooling Towers 375 Ton, 1,125 gpm (3) Chillers 266.6 Ton, 750 gpm (3) Energy Recovery Coils

Clemson University’s Advance Material Research Laboratory Mechanical Redesign Mechanical Redesign Goals and Objectives: Optimize Ventilation and Reduce Energy Justification: Smaller Equipment Sizes, Reduction of Costs Life Cycle Cost Reduced More Economical for Laboratories Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions Proposal: Replace CAV/VAV system Incorporate Dedicated Outdoor Air System (DOAS) with Integrated Active Chilled Beams Design: Total Heat Recovery Incorporated Sensible Load Met by Chilled Beams

Clemson University’s Advance Material Research Laboratory DOAS DOAS DOAS Configuration Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions Existing Conditions: Anderson, South Carolina Outdoor Design DB: 93°F Summer 19°F Winter Indoor Design DB: 74°F RH: 50% DPT: 54°F

Advance Material Research Laboratory DOAS Chilled Beams Chilled Beams Clemson University’s Advance Material Research Laboratory DOAS Chilled Beams Chilled Beams Selection of Chilled Beams Building’s Total Sensible Load: Qtotal= 1,139,294 Btu/h Sensible Load Achieved by DOAS QDOAS= 97,824 Btu/h Sensible Load To Be Met by Chilled Beams QBeams= 1,041,469 Btu/h 788 Active Chilled Beams -TROX—DID300@76 W/m2 (7.06 W/ft2) Enthalpy Wheel Selection: Xetex AIRotor 2500 Contamination? Purged Enthalpy Wheel Maintance Ventilation Piping Acoustics Coordination Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions

Clemson University’s Advance Material Research Laboratory DOAS/Chilled Beams DOAS/Chilled Beams AHU Resizing Annual Cost and Equipment Break Down Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions Existing Components Clemson AMRL ($) Air System Fans 1,379,405 Cooling 925,442 Heating 7,019 Pumps 88,394 Cooling Tower Fans 932,159 HVAC Sub-Total 3,332,418 Lights 2,389,184 Electric Equipment 3,016,649 Non-HVAC Sub-Total 5,405,833 Grand Total 8,738,251 Proposed Components Clemson AMRL ($) Air System Fans 69,342 Cooling 229,434 Heating 3,354 Pumps 169,355 Cooling Tower Fans 115,958 HVAC Sub-Total 587,444 Lights 2,378,390 Electric Equipment 3,003,020 Non-HVAC Sub-Total 5,381,410 Grand Total 5,968,853 AHU # Original SA(cfm) Design OA(cfm) DOAS Resized OA (cfm) 1 4000 1800 594 2 4500 3 5700 4 5200 5 6300 2079 6 5800 5550 1832 7 5000 400 132 33% Reduction 32% Reduction Totals 85000 31150 10280 DOAS Ventilation Air Based On 20 scfm/person

Clemson University’s Advance Material Research Laboratory Lighting Redesign Lighting Redesign ASHRAE Standard 90.1-2004 Office Buildings Conclusions: High Efficient T5 Less Wattage Outputs Similar Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions 20% Reduction Clemson University’s AMRL 1.32—1.95 W/ sq. ft. Proposal: Remove 40 Watt T8 Install 32 Watt T5 Design Lumens/Lamp Lumens/L’aire Watts Existing 2850 8550 41,155 Proposed 2950 8850 34,243 Proposed: 1.06—1.56 W/sq.ft

Clemson University’s Advance Material Research Laboratory Construction Effects Construction Effects Schedule Impacts Labor Ductwork System Sizes Pumps Mechanical System First Costs: Existing System: Total Cost: $3,024,000 Proposed System: Beam Cost: $2,764,000 Equipment/Labor: $2,894,160 Total Cost: $5,658,000 $2,634,000 Increase in First Cost Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions

Clemson University’s Advance Material Research Laboratory Conclusions Acknowledgements $135,398 Year 1 My Family and Friends Faculty and Staff of AE Clemson University IDC Architects Overall Costs: Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions System Existing CAV/VAV Proposed DOAS/ Chilled Beams Initial Cost $3,024,000 $5,658,000 Yearly Cost $8,738,251 $5,968,853 Total First Year Cost $11,762,251 $11,626,853 47% 32%

Clemson University’s Advance Material Research Laboratory Presentation Agenda Building Background Existing Conditions Mechanical Redesign DOAS/Chilled Beams Lighting Redesign Construction Effects Conclusions Acknowledgements Questions Questions?