Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.

Slides:



Advertisements
Similar presentations
Heavy Ion Cancer Therapy
Advertisements

MedAustron – Austrian Hadron Therapy Centre
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Carbon therapy machine Working group2 FFAG workshop 2003 at KEK.
ESS DTL beam commissioning
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Cooler Injector Synchrotron (CIS) at IUCF V.S. Morozov MEIC Collaboration Meeting March 30-31, 2015.
1 Status and Plans at J-PARC Linac Kazuo Hasegawa J-PARC Center/Japan Atomic Energy Agency Collaboration meeting between CERN and J-PARC December 18, 2013,
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
MedAustron – a case study Austrian Centre for Ion Therapy and Research oPAC 3 rd Topical Workshop on Beam Diagnostics Dr. Fadmar Osmić Accelerator Manager.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
New Gantry Idea for H + /C 6+ Therapy G H Rees, ASTeC, RAL 4 th September, 2008.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
On behalf of the whole MedAustron Therapy Accelerator Division
Principals of fast injection and extraction R. Apsimon.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
T. Fleck, GSI, Darmstadt, Germany ICALEPCS Status of the Control System for HICAT at an advanced stage of Commissioning Functions, Restrictions.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
ESS Front End diagnostic
ELENA installation progress F. Butin / ELENA collaboration.
Report Technical Director Storage-Ring-Installation Completed
NICA injection complex status
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
J-PARC main ring lattice An overview
A. Martynov on behalf of accelerator division.
A.Lachaize CNRS/IN2P3 IPN Orsay
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Progress in the Multi-Ion Injector Linac Design
Options and Recommendations for TL and Dumps
Injector Cyclotron for a Medical FFAG
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE-BI Software for LINAC4
Elena Wildner CERN CA15139 Meeting, Sofia 15/
WP11: electron and proton beam testing
Kuanjun Fan Institute of applied electromagnetic engineering
Lecture 2 Live Feed – CERN Control Centre
Design of a PET-isotope-based hadron therapy facility
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
FFAG Accelerator Proton Driver for Neutrino Factory
Pulsed Ion Linac for EIC
Multi-Turn Extraction for PS2 Preliminary considerations
Advanced Research Electron Accelerator Laboratory
SLHC-PP kick-off meeting, CERN 9 April 2008
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Multi-Ion Injector Linac Design – Progress Summary
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable number of special magnets, ion sources, RF devices, etc,.. ), which need to be controlled! From 220 suppliers from 23 different countries Accelerator Layout CERN - ARIES - 2017

Everything starts with a source… 3 (4) Ion Sources Capable to deliver protons and carbon ions (He, O,… as future options) As installed in our injector ECR Ion source – Pantechnik As installed in our injector CERN - ARIES - 2017

In order to keep the beam on track and well focussed, we need magnets (dipoles and quadrupoles). Bending force due to a dipole field (De)focusing due to a quadrupole Arrangements of quadrupoles (beam optics) Synchrotron dipole magnet @ test stand at CERN – Budker Institute Synchrotron quadrupole @ test stand at CERN - Sigmaphi CERN - ARIES - 2017

Magnets without power can not fulfil their job, thus we need power converters. 5 different families (and many more types) Up to 3.3 kA max output current EEI power converters at MA „Special Magnets“, specific components with their power converters (electrostatic and magnetic septa, kicker magnets, etc…) for specialized tasks. Example of electrostatic extraction septum Magnetic septum at test stand at CERN CERN - ARIES - 2017

The beam needs to be accelerated. Accelerating structures and their (RF) power sources. Components placed in the injector and the synchrotron. Radio frequency Quadrupole (RFQ) Example of a synchrotron RF cavity IH mode drift tube Linac CERN - ARIES - 2017

Nothing would work without vacuum. 489 chambers 64 tanks 133 pumps Down to 5 x 10-9 mbar (Synchrotron) Vacuum chamber and valves Chamber installed in Synchrotron dipole The beam needs to be diagnosed. 153 monitors 16 different types Slit, wire scanner and faraday cup in LEBT Synch pick up at test stand at CERN CERN - ARIES - 2017

Everything needs control. Hundreds of devices need to be controlled and monitored. Devices need to be synchronized. User interface for operators/commissioners. Accelerator Control Room Safety systems ensure safety for personnel and HW (PCS, BIS). Thermo switches at magnet BIS Input and output modules BIS/PCS panel in ACR CERN - ARIES - 2017

All parts need to be installed, integrated and commissioned, design work is required, cables need to be pulled (> 100 km, about 30 km of DC power cables), etc… … in order to get an accelerator assembled. Installation in injector hall Accelerator requires a working infrastructure (power, cooling, ventilation, pressuarized air, IT,…) CERN - ARIES - 2017

Main task: Accelerate a beam to 7 MeV The Injector Main task: Accelerate a beam to 7 MeV El. Deflector 0.008 MeV/u 0.4 MeV/u 7 MeV/u Stripper foil (H3+ to p, C4+ to C6+) CERN - ARIES - 2017

Main task: Accelerate a 7 MeV/u beam to the desired extraction energy The Synchrotron Main task: Accelerate a 7 MeV/u beam to the desired extraction energy From Injector (7 MeV/u) Synchrotron – key parameters: Active energy selection, 255 energy steps/ion species Energy: 120 - 400 MeV/u (C6+), 60 – 800 MeV (p) Ramp speed: 0.5s (to highest carbon extraction energy) Extraction time: 1 - 10s approx. 25m To Patient CERN - ARIES - 2017

Typical Synchrotron Cycle Typical cycle for a synchrotron for medical use with slow extraction. Magnetic field Bmax B1 B2 Injection Extraction energy 1 Injection Extraction energy 2 Time 2 s 4 s Acceleration Acceleration Intensity Time Energy 1 Intensity 1 Energy 2 Intensity 2 Beam structure: pulsed, energy and intensity variable CERN - ARIES - 2017

Multi Turn Injection and Slow extraction MTI: 2μs (or 75m) …… 2μs (or 75m) Beam pulse from the injector (length 30 μs) Time for 1 turn in Synchrotron @ injection level: about 2 μs Beam pulse from injector of about 30 μs (remember the electrostatic deflector) Injection over 15 turns (multi-turn) Special, synchronized equipment needed for this operation (injection kickers) Extraction: Terms as “resonance tune”, “triangular phase space”, “Steinbach diagram”, etc… …are related to resonance or slow extraction. Imagine an onion which you peel off layer by layer. Beam: Particles at the border are separated from the core of the beam (duration 1 – 10 s) Devices needed: Sextupoles, betatron core, electrostatic and magnetic septa (special magnets). CERN - ARIES - 2017

Beam Distribution and Scanning Transverse “scanning” with small beams Beam sizes variable from 4 to 10 mm (in steps, FWHM in vacuum). Fast magnetic deflection (20 m/s). One slice is about one pulse (spill), 1-10 s. horizontal deflection vertical CERN - ARIES - 2017

Rotator adapts the beam for different Gantry angles. Gantry and Rotator Rotator adapts the beam for different Gantry angles. Gantry structure Preliminary design of rotator structure Rotator CERN - ARIES - 2017

A million of beam combinations… Accelerator is able to generate: Number of ion species: 2 Number of different energies: 255 Number of beam sizes: 5 Number of intensities: 4 Number of extraction times: 8 Beam combinations per beam line: 81600 Gantry: different angles needs to be considered None clinical research: extended energy range Requires a huge amount of commissioning work. Most of the combinations obtained by interpolation. Stepwise release for medical use. Example for table to select a beam combination CERN - ARIES - 2017

Let’s make our machine safe for the patient -> The Medical Front-End Main task: Serves as a mitigation measure for hazards caused by the accelerator in order not to harm the patient. Realized by online monitoring of beam properties during the entire patient treatment. (mainly done by Dose Delivery System (CNAO)). Monitored beam characteristics by the DDS: Intensity Beam position Beam size In case of deviations: Trigger an interlock Switch off beam within very short time (few hundred μs). Schematics of monitoring system. Does not represent our design. Additionally control of scanner magnet PCOs CERN - ARIES - 2017

Accelerator + Medical Front-End = Therapy Accelerator The Medical Front-End II Architecture of Medical Front-End: Integrated into the overall system architecture. Interfaces to other Medical Devices, Accelerator and Infrastructure TCP: Start and stop irradiation Energy verification Independent beam termination system etc… Accelerator + Medical Front-End = Therapy Accelerator CERN - ARIES - 2017

The MedAustron Particle Therapy Accelerator - MAPTA Ion Sources Linear Accelerator Synchrotron Beam Distribution System Beam outlet for non clinical research Accelerator Control System Power Supplies Dose Delivery System (part of medical front-end - MF) Clinical beam outlet IR2 horizontal (A) uand vertical (B) Clinical beam outlet IR3 horizontal (C) Clinical beam outlet Gantry (D) MAPTA Treatment Control Panel (part of MF) A/B C D A/B C D CERN - ARIES - 2017

Injector Commissioning Beam emittance (profile + angle information) in front of RFQ. Beam profiles in S1 Horizontal plane Vertical plane CERN - ARIES - 2017

Injector Commissioning II RFQ characterization (TB2): Beam transmission: dependence on RF power Beam energy: dependence on RF power CERN - ARIES - 2017

Synchrotron Installation MEBT installation is progressing as planned. Synchrotron dipole installation has started. Forecast: By the end of the year, all Synchrotron components will be installed. MEBT installation Dipoles in Synchrotron Synchrotron hall – 2. Sept 2013 CERN - ARIES - 2017