Integrated Alarm System for ALMA

Slides:



Advertisements
Similar presentations
Fabric and Storage Management GridPP Fabric and Storage Management GridPP 24/24 May 2001.
Advertisements

Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
ALMA Development Workshop FY2016 Call for Study Proposals - Mechanics Mike Shannon, Program Manager 25 March 2015.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
7.1 The Software Engineering Discipline 7.2 The Software Life Cycle 報告者 : 林建任.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
AAAC Meeting: October 12, 2005 ALMA Update: October 2004-October 2005 Bob Dickman ALMA Staff Associate Division of Astronomical Sciences.
Best Practices Wiki Ruth Duerr NSIDC, IEEE Report to GEO Committees September, 2008.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 New AM organization and improving the acceptance procedure Masao.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
ANASAC Meeting Title North American ALMA Development Program Review Michael Shannon, Program Manager 17 September 2013.
ICT Coordination and Planning Meeting #1 (17-19 April 2013) ALMA Dashboard 1.0 Giorgio Filippi The Atacama Large Millimeter/submillimeter Array.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Welcome J. Ibsen.
ALMA Integrated Computing Team Coordination & Planning Meeting #4 Santiago, November 2014 Reporting Software Principles M Chavan, ESO R Soto, ALMA.
World Class Standards Footer text (edit in View : Header and Footer) Software Defined Radio ETSI © ETSI All rights reserved ITU Workshop.
SARMa project development WP1 Project management and coordination SARMa internal handbook Alianta d.o.o., Ljubljana Split, 4-5 February 2010.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Smart Surveillance Technology Javier OcasioPerezWilliam Sanchez Rosa Mariel Martinez MarreroAbraham Diaz Santiago.
ICALEPCS’ GenevaACS in ALMA1 Allen Farris National Radio Astronomy Observatory Lead, ALMA Control System.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Requirements Analysis
Nordic ARC Update Nov 17 th 2008 ARC face-to-face ESO Garching John Conway.
Erwin Laure ScalaLife Project Director.
SAON Operational Activities Draft proposal Jan René Larsen SAON Board Meeting, January 2012, Tromsø,
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Release Manager and Acceptance Manager Roles J. Ibsen/ R.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Project Database Handler The Project Database Handler is a brokering application which will mediate interactions between the project database and other.
ALMA-UTFSM Group ALMA-UTFSM Group: Developing software for and with ALMA Matias Mora Klein Rodrigo Tobar Carrizo Computer Systems Research Group Universidad.
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
Dashboard upcoming features A Hales, ALMA and M Chavan, ESO
Collaborating for sustainable growth
ACA TP Spectrometer Manabu Watanabe (NAOJ)
Quarterly Certification Automation Project
SCT Project Management Issues
Software Overview Sonja Vrcic
From LSE-30: Observatory System Spec.
EGEE Middleware Activities Overview
Status of “Hardware in the Loop Simulation Environment” Project
aspects of archive system design
PRTS & KPI Nick Whyborn – Vasco Cortez
Authors: Maria de Fatima Mattiello-Francisco Ana Maria Ambrosio
Operations Concept Simon Radford and Operations Committee
Fabric and Storage Management
IEEE Std 1074: Standard for Software Lifecycle
Universitat de Barcelona / FBG
DataFlow Meeting Summary & DBA Advisory Board
Enterprise Content Management Owners Representative Contract Approval
Integrated Alarm System for the ALMA Observatory
Regional Architecture Development for Intelligent Transportation
Chapter 1 (pages 4-9); Overview of SDLC
Systems Engineering Management
Abstract Objectives Objective General Specific
ACS ALMA Common software Demo Setup
Lockheed Martin Canada’s SMB Mentoring Program
PCC Update 08/26/09 Planning Phase
Summary of GDWG breakout session and Actions 2018
PCC Update 10/28/09 Planning Phase
Workshop on Gap Analysis and Prioritization
Mark McKinnon EVLA Project Manager
Water Science-Policy Interface (CIS-SPI) Progress report
DG Environment, Unit D.2 Marine Environment and Water Industry
Troubleshooting Hardware Devices
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
What is a System? A system is a collection of interrelated components that work together to perform a specific task.
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

Integrated Alarm System for ALMA Progress report Erich Schmid – ALMA Computing ICT-CPM6 – 30 Nov – 2 Dec 2016

Study Overview ALMA MEMO #600: Small internal study to determine requirements and design concepts Funds from ESO to cover travel and contracts Collaboration of all ALMA partners, in particular JAO operators and engineering Started in October 2015, completed in June 2016 ALMA MEMO #600: http://library.nrao.edu/public/memos/alma/memo600.pdf ICT-CPM6 – 30 Nov – 2 Dec 2016

Status update Identify all the relevant hardware and software systems. ✔ Document the existing alarm systems and available interfaces to access relevant data. ✔ Engage an external alarm system expert (ESA) ✔ Engage a human-computer interface expert (INRIA) ✔ Compile a report to stipulate the requirements and design concepts for an integrated alarm system. ✔ Write a proposal for a development project to design, implement and deploy an integrated alarm system ✔ Got approval from [E|A]SAC and ALMA Board ✔

Things to be monitored (not complete)

Overview of ESA model Hierarchical model with alarm propagation Intuitive overview of the monitored information Qualified values Alarm is to abnormal condition what a notification is to Property X Value Validity Alarm ICT-CPM6 – 30 Nov – 2 Dec 2016

Alarm panel mock-ups Observatory Overview Panel Will never be covered by other windows, dialogs

Alarm panel mock-ups Array elements

Alarm panel mock-ups Visualization techniques

Alarm panel mock-ups Weather reporting

Alarm panel mock-ups Power generation

Alarm panel mock-ups Buildings

Alarm panel mock-ups Observations

High-level Architecture ICT-CPM6 – 30 Nov – 2 Dec 2016

What’s Next? Started prototyping Start project in Jan 2017 Project duration ~ 2 years Total effort required ~ 3.1 FTE years 1.6 ESO ISM Garching (0.8 FTE over 2 years) 1.5 ESO Contractor Santiago (1.0 FTE over 1.5 years) - TODO Run as open-source project in Github ICT-CPM6 – 30 Nov – 2 Dec 2016

What’s Next? Design to be ready by end Q1 2017 Meeting with CTA in mid December Keen to collaborate and contribute Subsystem scientists confirmed Emilio Barrios & Bernhard Lopez Create Project Management Plan Light-weight design reviews Panel members? ICT-CPM6 – 30 Nov – 2 Dec 2016

That’s all!