Data Handling Hybrid (DHH) Universität Göttingen

Slides:



Advertisements
Similar presentations
F. Formenti - ALICE forum 16/03/ Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others.
Advertisements

VLV T – Workshop 2003 C. A. Nicolau – VLV T - Amsterdam 5-8 October 2003 A 200-MHz FPGA based PMT acquisition electronics for NEMO experiment Read Out.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
LV power cables for iTOP
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
HORIZONTAL SUBSYSTEM. CABLING SYSTEM Horizontal Subsystem The Horizontal cabling subsystem is the part of the Signamax Cabling System that extends from.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
SuperKEKB 2nd open meeting March 17-19, 2009 Hans-Günther Moser MPI für Physik PXD Session SOI: more information: see TIPP09 -> submission in February,
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
CMX Collection file for current diagrams 30-Apr-2014.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
Cloudland Instruments Hawkeye Electronics Snapshot March 10th, 2016.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
PXD EVO Hans-Günther Moser MPI für Physik Meeting on Services and Power Supplies Aim: define the services chain form module to external racks.
27/01/2012Mauro Citterio - SVT TDR Meeting - Pisa1 Pheripheral Electronics Mauro Citterio INFN Milano.
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
Data Acquisition of the PXD Takeo Higuchi (KEK) PXD follow up meeting on Nov.7,2010 « DISCLAIMER» Materials prepared for and presented in PXD follow up.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
Update on the Bus, the HDI and peripheral electronics M. Citterio on behalf of INFN Milano and University of Milan SuperB Workshop: SVT Meeting.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
DHH progress report Igor Konorov TUM, Physics Department, E18 DEPFET workshop, Bonn February 7-9, 2011 Outline:  Implementation synchronous clock distribution.
1 Test of Electrical Multi-Chip Module for Belle II Pixel Detector DPG-Frühjahrstagung der Teilchenphysik, Wuppertal 2015, T43.1 Belle II Experiment DEPFET.
23 April, 2008Gabriele Giovanetti – INFN - LNS1 New electronics architecture in NEMO – phase 2. Gabriele Giovanetti – INFN – LNS NEMO Phase 1: 4 floor.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
The Data Handling Hybrid
Latest results of EMCM tests / measurements
Santiago in DEPFET for SUPERBELLE
Thinning and Plans for SuperBelle
Calorimeter Mu2e Development electronics Front-end Review
Preliminary thoughts on SVT services
The CSOI approach for integrated micro channels
The Data Handling Hybrid
Readout System of the CMS Pixel Detector
DHH progress report Igor Konorov TUM, Physics Department, E18
FF-LYNX (*): Fast and Flexible Electrical Links for Data Acquisition and Distribution of timing, trigger and control signals in future High Energy Physics.
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
PXD ATCA DAQ for DESY Test
Meeting on Services and Power Supplies
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
The Belle II Vertex Pixel Detector (PXD)
Low Voltage Supply and Regulation
Development of the Data Handling Processor DHP
VELO readout On detector electronics Off detector electronics to DAQ
SVT detector electronics
Design Topics IC Applications Amplifier Signal Generator
Read Out and Data Transmission Working Group
RPC Front End Electronics
RPC Electronics Overall system diagram Current status At detector
SVT detector electronics
FED Design and EMU-to-DAQ Test
Presentation transcript:

Data Handling Hybrid (DHH) Universität Göttingen 9/11/2018 Data Handling Hybrid (DHH) Ariane Frey Universität Göttingen DEPFET DAQ Meeting MPI March 2010 Ariane Frey, University of Göttingen Ladislav Andricek, MPI Munich

All communication from and to the ladders goes through the DHH ! 9/11/2018 Tasks of the DHH Impedance matching Electrical  optical Power filtering Local power regulation (?) Slow control (JTAG) All communication from and to the ladders goes through the DHH ! 1 DHH per half-ladder (total 40) Connection between DHP and ATCA DAQ system DEPFET DAQ Meeting MPI March 2010 Ariane Frey, University of Göttingen Ladislav Andricek, MPI Munich

Data Transmission for the BaBar SVT 9/11/2018 Data Transmission for the BaBar SVT DEPFET DAQ Meeting MPI March 2010 Ariane Frey, University of Göttingen Ladislav Andricek, MPI Munich

Data Transmission for the BaBar SVT 9/11/2018 Data Transmission for the BaBar SVT Twisted Pair cables (24 AWG) Kapton Only passive components DEPFET DAQ Meeting MPI March 2010 Ariane Frey, University of Göttingen Ladislav Andricek, MPI Munich

Overvoltage protection 9/11/2018 “Patch Panel Card” Proposal: small interconnect card very close to the Ladders (~ 20 cm) Impedance matching (& voltage sensing ?) Power filtering Kapton  cable Cannot be just passive, need at least line drivers (radiation tolerance ?) Twisted Pair Data Lines (4) 1.25 Gb Clock, Trigger JTAG_INPUTs JTAG_out ? Power Lines Overvoltage protection KAPTON DEPFET DAQ Meeting MPI March 2010 Ariane Frey, University of Göttingen Ladislav Andricek, MPI Munich

Between Patch Panel and DAQ. In the docks ? Outside ? 9/11/2018 DHH Between Patch Panel and DAQ. In the docks ? Outside ? Voltage regulation: where ? Outside at supplies ? FPGA: heart of DHH Multiplex fast data lines, generate clock JTAG master Optoconversion Finisar FTLF8519P2BNL DEPFET DAQ Meeting MPI March 2010 Ariane Frey, University of Göttingen Ladislav Andricek, MPI Munich