Crow/Quartz Creek Instream Large Wood Recruitment

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION Walla Walla River Juvenile and Adult Walla Walla River Juvenile and Adult Fish Passage Improvements.
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Washington Department
U.S. Department of Energy Pacific Northwest National Laboratory Evaluation of Juvenile Salmonid Culvert Passage SM Anglea, GD Williams, KD Ham, and GA.
Fluvial Bull Trout Migration and Life History Investigations, Upper Salmon River Subbasin New Project Proposal, No Sponsored by: Shoshone-Bannock.
Restore and Protect Red River Watershed Nez Perce Tribe Fisheries Watershed Program.
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION
LOWER SALMON RIVER Tributary Protection and Enhancement.
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Columbia River Mainstem Dams Project PNNL.
Protect and Restore Little Salmon River Project # Nez Perce Tribe Fisheries/Watershed Program By Chad Fealko.
Salmonid Population and Habitat Monitoring in the Lower Columbia/Columbia Estuary Provinces Oregon Department of Fish and Wildlife.
Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
Keeping Maine’s Forests Pilot Project Update Fisheries Habitat Restoration Pleasant River Watershed.
Hood Canal Jefferson County Flying for Fish Habitat Tours December 2007.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Implementation of the Biological Opinion for Russian River Water Supply, Flood Control Operations & Channel Maintenance National Marine Fisheries Service.
Department of Forestry 2004 Stream Habitat Restoration Guidelines
Large Wood Treatment on Habitats and Fish Populations of Green River and Crab Creek Bio-Surveys, LLC 2007 Presented by Esteban Quiles.
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
8/29/2006 DRAFT Implementing an Adaptive Management Framework for the Fish and Wildlife Program DRAFT.
Clackamas River Basin Council Lower Columbia River Conservation and Recovery Plan Implementer’s Perspective August 19, 2013.
By: Scott Rakes February 18, 2010 Endangered Species.
Hancock Springs A natural lab for studying the roles of physical habitat, nutrient availability, and non-native species to inform river restoration John.
Elk Creek Wood Replacement Phase Two Oregon Watershed Enhancement Board, 2009 Katie Halvorson.
Monitor and Evaluate Salmonid Production in the Asotin Creek Subbasin - LSRCP (ID #200116)
Shoshone-Bannock Tribes Fish and Wildlife Department.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Lower South ForkClearwater River Lower South Fork Clearwater River Nez Perce Tribe DFRM Watershed Division Mark Johnson-Project Leader
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
1 Questions Addressed What are the options for reducing pollutant inputs to Lake Tahoe? Pollutant Reduction Opportunities.
Claytor Lake Debris Study. Hydro Environmental Services of Kleinschmidt Associates  Shoreline Management Plans (SMP)  Aquatic & Terrestrial Habitat.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Lower Columbia River Conservation and Recovery Plan Implementation Team August 19, 2013.
The Upper Lochsa and Progress Toward Restoration Rebecca A. Lloyd, NPT Watershed Division.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Wildlife Program Amendments CBFWA Members Meeting – Sept
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Establishing a Network of Intensively Monitored Watersheds in the Pacific Northwest PNAMP Effectiveness Monitoring Workgroup April 7, 2005.
Coal Creek Culvert Replacement Pacific Coast Salmon Coalition.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Reconnecting Fluvial Westslope in Skalkaho Creek Is this working and how do we tell?
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
Hangman Creek Fisheries Enhancement BPA Project & Hangman Restoration Project: Wildlife BPA Project
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
Assessment Prioritization Activity (Design/Implementation) Monitoring ADAPTIVE MANAGEMENT Modification.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
SONOMA CREEK AND SEDIMENT: KNOWING WHAT WE DON’T KNOW MAY 2011.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Snohomish County Surface Water Management R2 Resource Consultants
Ladd Creek Fish Passage Project
Department of Forestry 2004 Stream Habitat Restoration Guidelines
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
North Fork Teanaway Large Wood Trapping Implementation
Results & Discussion Cont. Acknowledgements & References
Five basic objectives of ISTM
Thorp Mill Ditch Assessment ( )
Spoonful farms side channel preliminary design
Watershed Restoration on the Lolo NF Benefits for the Clark Fork Watershed Taylor Greenup, Hydrologist, Lolo National Forest Jennifer Mickelson,
Study Update Tailrace Slough Use by Anadromous Salmonids
Economic Study for Watts Branch Stream Restoration N. E
Fisheries Adventure Learning—Boise Watershed Luke Kolar and Lee Brown.
Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop
Stream Management Implementation Program Schoharie Watershed Advisory Committee Meeting October 24th, 2018.
North Shore Streamkeepers February 23, 2019
Tucannon River Programmatic Habitat Program (a 30 mile long project)
Presentation transcript:

Crow/Quartz Creek Instream Large Wood Recruitment Mid-Columbia Fisheries Enhancement Group #17-1169

Project proposal Add 250 – 300 pieces of large wood in 1.3 miles of Crow Creek and 1.2 miles of Quartz Creek

Species Life History Present (egg, juvenile, adult) Current Population Trend (decline, stable, rising) Endangered Species Act Coverage (Y/N) MCR steelhead All Rising Y (threatened) Columbia River bull trout Sub-adult in Quartz, adult migration in Crow, which has only local spawning population in Little Naches River watershed Declining MCR spring chinook salmon Spawning and rearing Stable N Westslope Cutthroat trout Spawning migration route

Project objectives Increase Crow Creek large wood frequency by 130% (from an average of 91 pieces/mile (2015) to an average of 211 pieces/mile); Increase Quartz Creek large wood frequency by 366% (from an average of 45 pieces/mile (1993) to an average of 165 pieces/mile); Stimulate the creation of at least 100 new pools; and Reconnect floodplains along 2.5 miles of Crow and Quartz Creeks.

Crow Creek

Crow Creek

Crow Creek

Quartz Creek

Quartz Creek

Quartz Creek

TAG/CC Question, Request, or Comment Response: Where / how is the comment addressed in the final application Some tour participants expressed interest in mapping specific locations of proposed wood placements, and to show before project and proposed after project wood loading, pool frequency/depth and or gravel availability. Gary and Cassandra are planning to conduct this survey in the next month.  Describe specific goals for wood placements and how gradient and floodplain character play a factor in different area. These will be better articulated after the field survey, but are focused on floodplain connection, pool creation, and the restoration of wood function in-stream.  Clearly identify how treatment streams were selected and their role/priority of this habitat for targeted fish species. This project is the first step in implementing the aquatic restoration priorities of the Little Naches Aquatics working group. This multi-agency group has worked with the Forest Service and other stakeholders to identify and prioritize restoration actions in concert with the larger Little Naches/Little Crow watershed restoration NEPA process.  

SRFB Technical Review Panel Question, Request, or Comment Response: Where / how is the comment addressed in the final application? Before submitting final application, walk streams to identify 1) specific locations for planned wood placement and 2) the size of material to be placed. For each stream reach provide a table of channel slope, width and typical bed material size. The added field survey could be done in one day and will allow for a refined methodology and a more precise cost estimate. The Quartz Creek site visit revealed terrific amounts of wood and this may be identified in other stretches as well. Sponsor indicated that the size of material to be placed will depend on what is in the vicinity of the stream and the equipment available to the successful contractor. The landowner must weigh the trade-off between the size of habitat effect that can be achieved with mechanized equipment and the degree of site impact associated with that equipment. However in either event, the review panel recommends that the project requirements should drive the contractor selection rather than the other way around. If larger pieces will be necessary to achieve the desired habitat response and are available within 300’ of the site to be treated, a contractor with access to a spider hog would be desirable, unless it is the landowner’s opinion that this equipment would result in too much impact to the project site. Gary and Cassandra are planning to conduct this field survey in the next month.  

The streams are critical habitat for bull trout and steelhead. Describe observations of fish use within the project site, current habitat conditions and the habitat features you hope to affect. Elaborate on the importance of this reach for fish; if critical habitat for listed species has been designated within the project area, the proposal should so indicate. Elaborate on the habitat qualities that you are trying to improve upon. While the bed material was coarse in Crow Creek except around instream wood structures, the site is in mature forest that is protected from development and will continue to recover (albeit slowly) from legacy logging activities. The streams are critical habitat for bull trout and steelhead. The project offers a cost-effective approach to enhancing salmonid habitat in an area with few infrastructure constraints. The sponsor and landowner (USFS) have a productive collaboration that provides certainty in project success.   Staff comments: To help determine the necessary size of wood, look at the size of in-stream wood that appears stable in the stream. That will be incorporated into our field survey. 

Task Cost Match SRFB Request TOTAL $113,844 $17,150 $96,694 Felling and placement $61,000 Permitting $19,980 $13,150 $6,830 Travel and spike costs $7,876 Design $5,040 Construction oversight $12,160 $4,000 $8,160 Bookkeeping, reporting, project management $7,788 TOTAL $113,844 $17,150 $96,694