A series of projects The master plan has no end date.

Slides:



Advertisements
Similar presentations
School Closure/Consolidation Composition of School Closure Committee (SCC) Closure/Consolidation Criteria Timelines.
Advertisements

Enhancing Learning: The Aberdeen Approach The Final Report of the Curriculum Commission Bryan MacGregor.
057 CONSTRUCTION PRODUCTIVITY (MAJOR INFLUENTIAL FACTORS)
Draft FMP Priorities For Discussion Facilities Committee 3/5/13.
10 to 15 Year Golf Course Development Plan. There are currently 3 greens that have been upgraded to/close to USGA specification (1st, 4th, 17th) and 2.
PRAC and Integrated Planning October 22, Integrated Planning Model.
What time is it? Coo-Coo one o'clock a quarter to seven
BOUNDARY REVISIONS TO ELEMENTARY SCHOOLS IN PANAMA-BUENA VISTA USD SUPERINTENDENT MR. KIP HEARRON ASSISTANT SUPERINTENDENTS MS. GERRIE KINCAID DR. PAM.
Toronto District School Board Facilities Services Department North Toronto Collegiate Institute Status Quo.
Sag Hollow Golf Club At: Booneville, Kentucky Sag Hollow Golf Club At: Booneville, Kentucky.
Elementary School #33. Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows.
CLICK THE NUMBERS IN SEQUENCE
Planning & Monitoring. The Purpose of Planning and Monitoring To ensure that the project is produced on time, within the cost constraints and at the quality.
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
7.2 System Development Life Cycle (SDLC)
Delivering LNG to remote sites to service pipeline interrupts on a temporary basis.
Projects Ce. Sodding Grass Nr 7 Nr. 7 Fertilizing and Rehabilitation of Fairway.
A Golf Course Management Policy Document Purpose of the document Who should take ownership for producing it Timescales and procedure.
Completion of Winter Projects. Bunker Reconstruction Nr. 4 Pre - Construction.
AUBURN UNIVERSITY ACADEMIC PROGRAM REVIEW University Senate July 8, 2008.
Who can win more gold medals?
Integrated Studies Glenys Tucker Innovative programme as part of the learning support provision which is effective in supporting students in the development.
Report Ce Centurion Golf Course Report River damage on Hole Nr 7.
Proposed Sudbury West ARC OPTIONS Chair/Vice Chair Working Group June 2007.
Strategic Plan Update North Centers Faculty/Classified Professionals Duty Day January 8, 2009.
NEXT STEPS – BOND PROGRAM Facilities Master Plan Update Facilities Subcommittee – March 17, 2015.
STATE OF THE CHURCH Presented to the Church Council First United Methodist Church of Cary January 23, 2014.
USGA Rules USGA Rules. Show Consideration to the Others.  No disturbance or distraction by moving, talking or making unnecessary noise.  On teeing ground,
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
CLICK THE NUMBERS IN SEQUENCE
1 DISASTER MANAGEMENT Presentation to the Portfolio Committee on Provincial and Local Government 11 March 2003 (Mr LJ Buys)
The mission of the Codrington School is to empower all children and adults within the community to become internationally minded learners who embrace and.
ONE TWO THREE FOUR FIVE SIX SEVEN EIGHT NINE TEN CLICK THE NUMBERS IN SEQUENCE.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Kentucky’s Professional Growth and Effectiveness System.
The long hand is the minute hand. The short hand is the hour hand.
Integrating with MAUI Rick Porter Brian Dickey. MAUI Application that provides administrative access to federally protected student data. Ex. Dates, courses,
START It’s two o’clock It’s a quarter to ten It’s five to eight It’s twenty to one.
2B: Unit 5 What time is it What time is it ? o’clock / half past.
Knock Out!!!!! Your are in teams of four. The number on your desk corresponds to the number problem you are responsible for. When all four members of.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education August 4, 2014 Stakeholder Engagement and Communications Services.
Infill Master Plan October 23, 2007 Infill Master Plan October 23, 2007 Board of County Commissioners Discussion Item.
Sudbury West ARC Public Meeting #3 Wednesday, September 19, 2007.
Royal Belgian Golf Federation Info - Meeting Course Rating
Royal Belgian Golf Federation Info - Meeting Course Rating
Cowichan Golf Club Great Island Golf
Linden Heritage Plaza Project
What Types of Roles Do Organisms Play?
Handicap Workshop COURSE RATING February / March / April 2015.
HOLE 10 – PAR 4 BLACK 315 YARDS GOLD 305 YARDS BLUE 290 YARDS
Becoming a Successful Construction Manager
WELCOME ! International golf connections into the heart of golfing pleasure.
Elaborating The Committee Charter:
Team 02 Sub-par engineers
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
House Appropriations Committee Retreat Update on Degree Funding Initiative Tony Maggio November 13, 2018.
NUMBERS one two three four five six seven eight
Simulation and Analysis of a Golf Course
Connecting Number Words, Numerals and Models
Institution and student collaboration Jan Wium/Hans-Jochim Bargstadt
WHAT TIME IS IT? OK NO! It's o’clock A quarter past
COUNTRY CLUB TOWNHOMES HOMEOWNER ASSOCIATION
Garrett Country Club II
CLICK THE NUMBERS IN SEQUENCE
CHOOSE THE CORRECT NUMBER
What time is it ? o’clock / half past 2B: Unit 5.
MINUTES five past ten past quarter past 11 1 twenty past
CLICK THE NUMBERS IN SEQUENCE
O'CLOCK TO PAST PLAY! HALF ONE O’CLOCK NEWS!
Presentation transcript:

A series of projects The master plan has no end date. If you like it is a series of integrated projects To break it down into logical projects and develop an initial five year plan, the board formed a sub-committee.

Master plan Sub Committee This included past course committee chairman Mr Stu Anderson, past course committee member Mr Ross Christian and myself.

Consideration was given to Allocation of funds ($70,000 p.a.) Management resources Support for the MP implementation Minimising disruption to play during construction The need to convert clay based to sand based greens The sequence of projects to ensure the Master Plan’s integrity

The following is the project team’s five year plan recommendations.

Course Master Plan

Year One Hole four

Year 1 New 4th green Hole four Allows for reconstruction of the main goal – a new 4th green Year 1 Hole four New 4th green Temporary green 4th hole (R&M) As per Master Plan design (to USGA specification) landscaped, tree planting/removed.

Year One Hole One

Year 1 Hole one Incorporate new fairway bunker as per Master Plan. (R&M)

Year Two Hole ten

Year 2 Alternative Green on 10th fairway Hole ten Hidden from fairway, built to (USGA) spec’s Permanent Tee Block secreted into Pine trees right hand fairway boundary Alternative Green on 10th fairway Permanent green ¾ down 10th fairway at current rubbish site. Built to USGA specification, Chris Pitman design Fully maintained green as alternative hole for future course redesigning projects

Year Two Hole seven

Year 2 Hole seven Waste bunker 7th fairway As per Master Plan, limited member interruption (R&M)

Years Three & Four Hole four

4th fairway and tee block Year 3/4 Hole four 4th fairway and tee block total reconstruction Will connect to new 4th green constructed in year one. As per Master Plan with full landscaping. New bunker and planting.

Year Five Hole ten

Year 5 10th Green reconstruction Hole ten Moved to the west (right) to accommodate (separate) the 8th green (member safety) Clay to sand base greens programme Built to USGA specification, Chris Pitman design