LIU–PLI report LIU PSB meeting.

Slides:



Advertisements
Similar presentations
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
Advertisements

TS, Length of YETS EYETS LIU & CONS Project
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
LIU–PLI report LIU Project Team meeting. LIU - Planning & Installation Coordination Meeting Space Reservation & Engineering Change Request - Guideline.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Wim Weterings Remy Noulibos
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Electrial Safety LS2 days November 2016 AP
YETS & LS2 Works EN-EL / Power distribution
Status of the BI Work Package in the LIU-PSB frame
Linac4-PSB 160 MeV connection readiness review
PS / Booster septa control
LIU – EVM status and next steps
Framework Schedule from EYETS 2016 to LS2
BE-ICS activities for LIU Project
Update on the Critical Path of the PS Booster Schedule for the EYETS
BE-CO Activities for LIU-CPS and LIU-SPS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
LINAC4 ADVISORY COMMITTEE
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
LIU / HL-LHC Cost and Schedule Review
LIU – EVM status and next steps
Planning and Installation
EC Activities Status for the LIU
BE-ICS activities for LIU Project
LIU-PSB Status and Outlook
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE-ABT Activities for LS2
Status of the BI Work Package in the LIU-PSB frame
prepared by R.A.Barlow 30/056/2016
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
SPS Planning for the EYETS Meeting 8 (07/12/2016)
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
YETS PS + PS SWY + TT2 Facility Coordinator:
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
BE-CO Activities for PSB
PSB-PS instrumentation for LIU
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Vers PS YETS PS Booster David HAY & Cyrille BEDEL.
PLAN Results K. Foraz on behalf of LS2 team
LIU-SPS review for BI (no BWS)
Status of the BI Work Package in the LIU-PSB frame
SPS Injection BIS - Draft requirements
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

LIU–PLI report LIU PSB meeting

ECR and SRR to submit for approval this year You received an e-mail on 4th March 2016 Simplified Process of validation of the SRR/ECR Validation during Integration meeting (ICL) IN WORK UNDER APPROVAL APPROVAL CLOSED RELEASED ENGINEERING CHECK 2 weeks Presentation to the LIU-PLI for Project Approval ECR LIU and SRR LIU Presentation to the IEFC for Final Approval Installation 19 April 2016 LIU PSB meeting - J. Coupard

ECR to submit this year for approval Goal Upgrade Action Equipment or System impacted Location Group Contact ECR needed (Yes or No) Presentation of the SRR/ECR to the LIU-PLI meeting Status of the SRR/ECR EYETS 2016-2017 PSB 2 GeV Upgrade New Main Power Supply (MPS) = POPS-B b.245 TE-EPC Fulvio Boatini yes April 2016 yes Linac 4 Connection to PSB New PSB Injection Region New Injection Region RING (1L1) TE-ABT Wim Weterings PSB-L-EC-0001 14-Jan-15 UNDER APPROVAL be ready Removal of the KSW1L1 BTV 50 assembly New KSW16L1 New KSW16L4 Move KWS16L4 to 2L1 RING (16L1, 16L4, 2L1) Luis Miguel Coralejo Feliciano PSB-MKKSW-EC-0001 4-Feb-15 PSB Injection Systems Upgraded PSB Distributor BI.DIS New BI.DIS10 BI line PSB-MSMIA-EC-0001 10-Jun-15 RELEASED Deliver magnets for BI line (vertical bending magnets and correctors and quadrupoles) TE-MSC Antony Newborough PSB-LJ-EC-0001 New BI.SMV BI.SMV Michael Hourican PSB-MSMIB-EC-0001 Relocation of BI.BTV30 for installation of the new BI.SMV BI.BTV30 BE-BI Stephane Burger PSB-LJ-EC-0006 APPROVAL CLOSED Beam instrumentation Installation of a Wideband Pickup in the BTP Transfer Line New wideband BPM BTP line Jeroen Belleman PSB-BPUWB-EC-0001 NOT IMPLEMENTED Provide additional wire scanners (new design) Prototype of Wire Scanner RING (4L1) Bernd Dehning New Tune pick-ups New BPM RING (3L1) Jocelyn Tan Install new Beam Loss Monitors at ring (2 FIC per period) BLMs RING (L3 at all periods) Christos Zamantzas Install new Beam Loss Monitors at injection (BI line) Injection (BI line) Install new Beam Loss Monitors at extraction and transfer Extraction (BT,BTY,BTM) Electrical Systems Upgrade of LV general services distribution systems: PSB BCER Switchboard and Containment Installation b.361 EN-EL James Devine General Infrastructure Modification of the layout of racks in the BRF2 power converters racks metalic infrastructure cabling BRF2 EN-MEF David Hay PSB-K-EC-0001 The list of the TE-EPC equipment on surface/underground that must appear in the ECR will be established soon. 19 April 2016 LIU PSB meeting - J. Coupard

SRR to submit this year for approval Goal Upgrade Action Equipment or System impacted Location Group Contact SRR needed (Yes or No) Presentation of the SRR/ECR to the LIU-PLI meeting Status of the SRR/ECR LS2 2019-2020 PSB 2 GeV Upgrade PSB Extraction and Transfer Deliver magnets for BT, BTP, BTM transfer lines BT, BTP, BTM lines TE-MSC Antony Newborough yes Beam Intercepting Devices New absorber/scraper RING (period 8) EN-STI Francois-Xavier Nuiry RF Systems 2/4/16 MHz cavity consolidation studies and Finemet cavity beam studies BR.C02/C04/C16 RING (C02 = 7L1) (C04 = 13L1) (C16 = 5L1) BE-RF Mauro Paoluzzi Matthias Haase April 2016 19 April 2016 LIU PSB meeting - J. Coupard

Roadmap towards EYETS Presentation LSC (LS2 committee) 1st April 2016 - https://indico.cern.ch/event/504053/ Integration studies & ECR preparation ECR approval process ECR approved The ECRs must be released BEFORE the technical stop starts. 19 April 2016 LIU PSB meeting - J. Coupard