SCOPE & PLAN FOR HORIZONTAL DEPLOYMENT

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

Total Productive Maintenance
Supplier Development Kaizen Implementation Kit
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
TSI Plastics, Inc.. o TSI Plastics has been servicing the Aerospace & Defense Industries since 1959 as a contract manufacturer of custom fabricated parts.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
1 Delta Industries… AS9103 Implementation & Benefits Presentation for I.A.Q.G. October 7, 2005 Dave Wentworth - C.I. manager.
Quick Changeover/SMED Patrick Bye, President Dan Brook, General Manager 11/16/09.
Niblock & Associates, LLC ©2010 Niblock & Associates, LLC Christian M. Paulsen 1.
Control Phase Part of the Report Out for Completed Projects Lean Government Initiative.
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
Introduction to OEE (Overall Equipment Effectiveness)
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
Kaizen Focused Improvement Teams (F.I.T.) Training Pack.
Why team based working?. Individual Activity Why team based working in your service area / the areas you support? List the potential benefits that will.
© Oxford University Press How are the plates moving?
The Process of Making The Best CO2 Machine! Agricultural Mechanics / Woodshop Mr. Weaver The Process of Making The Best.
General Guidelines for this Template Add the letter of the stage (DMAIC) you are in on EACH SLIDE. Don’t feel like you have to use the tools at the end.
► TPM ACTIVITY ROADMAP OF PLANT
Initial Control 1 Total slides : 16 Total time : 10 min.
Presented by Dhananjay Metal Craft Pvt Ltd-1 Shendra Aurangabad.
Cost Company Name.

Face IT ! fight IT! & finish IT!
BUSI Operations Management
SCOPE & PLAN FOR HORIZONTAL DEPLOYMENT
Problem Solving Sheet Guidelines
Software project mgt. session # 3– lab manual.
The Manufacturing Council of IFMA Presents:
SCOPE & PLAN FOR HORIZONTAL DEPLOYMENT
Quick Changeover.
Food Prep & Service Process
KAIZEN CASE STUDIES COMPETITION [Name of the company] [Department/ Section] [Kaizen Title] [Team Name] [Members] November-2013 WQD, Live Competition.
?? 16 November 16 Action plan.
PDCA Problem Solving Guide
Scope & Plan for Horizontal Deployment
<PROJECT NAME> THEME STAKEHOLDERS BACKGROUND CURRENT CONDITION
Please highlight one choice only
8th Continual Improvement & Innovation Symposium 2016 CASE STUDY COMPETITION: KAIZEN TEMPLATE [ Name of the company ] [ Department / Section ] [ Kaizen.
8 Step Problem Solving Step 1: Clarify the Problem
Value Stream Mapping (VSM) Training
Software project mgt. session # 3– lab manual.
Other Current Conditions:
Subcomponents 8D for Problem Solving
Team Captain Instructions
PDT 319 Maintanance Management Total Productive Maintenance.
PROJECT SCOPE Scope : SMT Machine in both plant I and plant III.
Lean Methodology and Building Blocks Kaizen Methodology The 5 Whys
KAIZEN CASE STUDIES COMPETITION [Name of the company] [Department/ Section] [Kaizen Title] [Team Name] [Members] 17-November-2011 WQD, Live Competition.
LESSON 01 Hands-on Training Execution
Turtle Diagram Maintenance Department Continuous Improvement
Work Measurement and Lean Application
Bus 411 DAY 21.
Strategic Goal #1 _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Working across the Tiers: Developing an Outreach and Intervention Plan
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
Assessment Needs Analysis
Arrestee Food Prep & Service Process
Taking Water Management to a Higher level
A3 Story Boards Plan Adjust (Act) Do Check Do Plan Dave LaHote
Section 6.1 Solving Inequalities Using Addition or Subtraction
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
Validation by Process Owner Validation by Project Leader
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
Strategic Goal #1 _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
Productivity Company Name.
IPSG Meeting Dublin May 2004
7th Continual Improvement & Innovation Symposium 2015 CASE STUDY COMPETITION: KAIZEN TEMPLATE [ Name of the company ] [ Department / Section ] [ Kaizen.
CCM A3 “P” “D” “C” “A” Date: Title / A3 Theme: Owner: Stakeholders:
Presentation transcript:

SCOPE & PLAN FOR HORIZONTAL DEPLOYMENT TPM CIRCLE NO :- 01 ACTIVITY KK QM PM JH SHE OT DM E&T P15 KAIZEN IDEA SHEET TPM CIRCLE NAME: Achiever LOSS NO. / STEP DEPT :- PLANT ME RESULT AREA M Q A B C D S M CELL:- Tensioner CELL NAME:- A157 MACHINE / STAGE :- Plug Pressing Assembly OPERATION :- Body Plug Pressing KAIZEN THEME : To reduce the setup change over cycle time IDEA :- Provide quick change attachment at press base & change height vernation fixture COUNTERMEASURE:- Quick change attachment at bottom plate & equal the height of each fixture. BENCHMARK 20 min. PROBLEM PRESENT STATUS :- Every setup change over time 20 min. required. TARGET 10 min. KAIZEN START 10.04.2017 TDC 25.04.2017 KAIZEN FINISH 23.04.2017 TEAM MEMBERS : Ganesh Gaikwad , Nitin Sutar BENEFITS :- P:- Increase the productivity 300 nos./day M:- Increase the operator moral Before After WHY1 :- Every setup change 20 min. required. Why 2:- Each model fixture not common change height no quick change attachment. Why3 :- Fixture height change & provide quick change attachment at fix base plate RESULT :- Save the 10 min./setup change over KAIZEN SUSTENANCE WHAT TO DO:- Check point added in Sustenance audit check sheet . . HOW TO DO:- Check visually. FREQUENCY :- Alternate day ROOT CAUSE : Each Fixture height not same & No quick change attachment at press base. SCOPE & PLAN FOR HORIZONTAL DEPLOYMENT Sr No CELL TDC RESP. STATUS 1 A319, A216 25.06.2107 Nitin Sutar In process REGISTRATION NO. & DATE : 10.04.2017 REGISTERED BY :-Nitin Sutar MANAGER’S SIGN :- Ganesh Gaiwad